• Building Equipment Wholesale Tower Crane Spare Parts System 1
  • Building Equipment Wholesale Tower Crane Spare Parts System 2
  • Building Equipment Wholesale Tower Crane Spare Parts System 3
  • Building Equipment Wholesale Tower Crane Spare Parts System 4
  • Building Equipment Wholesale Tower Crane Spare Parts System 5
  • Building Equipment Wholesale Tower Crane Spare Parts System 6
Building Equipment Wholesale Tower Crane Spare Parts

Building Equipment Wholesale Tower Crane Spare Parts

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Building Equipment Wholesale Tower Crane Spare Parts


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Building Equipment Wholesale Tower Crane Spare Parts


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Building Equipment Wholesale Tower Crane Spare Parts

ItemParameter
Free standing height (m)46
Max height with attachment (m)150(200)
Working range can be adjusted(m) 44/50/55
Min working range(m) 2.5
Max lifting capacity(t)8
Tip load @ 56m(t)1.3
Hoist mechanismFalls24
Lifting capacity(t)0-20-40-40-8
Speed(m/min)0-800-400-400-20
MotorYZRWFc250M-4/8 30/30KW
Trolleying mechanismSpeed(m/min)12/27/53
MotorYZTDE132L-4 /8/16 3.3/2.2/1.1KW
Slewing mechanismSpeed(r/min)0-0.6
MotorYZR132M2-6-3.7KW×2
Climbing speed(m/min)0.5
Counterweight(t)14.1
Mast section size(L×W×H)mm1800×1800×2500
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)42
Rated working voltage & current380V/128A

Building Equipment Wholesale Tower Crane Spare PartsBuilding Equipment Wholesale Tower Crane Spare PartsBuilding Equipment Wholesale Tower Crane Spare PartsBuilding Equipment Wholesale Tower Crane Spare Parts

Building Equipment Wholesale Tower Crane Spare Parts


Building Equipment Wholesale Tower Crane Spare Parts

FAQ Topkit Cranes Rental Tower Crane Specification

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
Q: the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
The base and the arm can be expanded like the ladder of a fire fighter car.
Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q: Which style of Kung Fu has an animal system besides Shaolin? Which one has the Tiger, Monkey, Mantis, Snake, and Crane animals (not Shaolin because Shaolin has Dragon, Tiger, Leopard, Snake, and Crane.)
Monkey Vs Snake
Q: She was editing some of his writings. She was appalled(prim proper Nebraska gal) by his lack of punctuation. He said he didn't have the time for it. He was right. Shortly after he died of TB. Do you ever feel that time is your enemy; that you have only so many years to make a difference?
To Kill A Mockingbird is my widespread out of those video clips! ineffective night Cowboy and The wonderful Couple are large too! i've got no longer seen Psycho and The Hustler. The Graduate became into basically ok.
Q: Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
Q: I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
Q: What kind of bodies are tower cranes made of?
Tower crane is composed of three parts: working mechanism, metal structure and power unit, and control system. The composition and function of the three parts are outlined below.
Q: what is the difference between rigging, wire rope and rope?
Crane rigging usually refers to the cable that actually is attached to a cylinder in the crane and the motor turns the cyl. and either take up cable or vice versa. The cable is reeved thru the long (arm) boom of the crane and thru pulleys and then at the end of the cable there is a hook.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords