• Tower Crane Spare Parts Building Equipments System 1
  • Tower Crane Spare Parts Building Equipments System 2
  • Tower Crane Spare Parts Building Equipments System 3
  • Tower Crane Spare Parts Building Equipments System 4
  • Tower Crane Spare Parts Building Equipments System 5
  • Tower Crane Spare Parts Building Equipments System 6
Tower Crane Spare Parts Building Equipments

Tower Crane Spare Parts Building Equipments

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1.3-8T      Rated Lifting Moment: 80KN.M           Max. Lifting Load: 8T

Max. Lifting Height: 200M           Span: 2.5-56M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5613(QTZ80)            Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M): 46           Max. Working Range(M): 56

Tip Lifting Weight(T): 1.3          Working Range(M): 44,50,56             Climbing speed(M/MIN): 0.5

Counterweight(T): 14.1              Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1800*1800*2500             


Main Features of Tower Crane


1. TC5613(QTZ80)   have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 56m, TC5613(QTZ80)tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

5. Provide stepless speed regulation. Oustanding in working efficiency, operating stability and reliability.

 

6. Reduce future maintenance cost.


7. With scientific layout and beautiful appearance.

 

8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

9.After sales service will be offered which will get rid of all your worries in the purchase of our product


Specification of Tower Crane

 

Tower Crane Spare Parts Building Equipments


Tower Crane Spare Parts Building Equipments

Tower Crane Spare Parts Building Equipments

 

Images of Tower Crane

Tower Crane Spare Parts Building Equipments

Tower Crane Spare Parts Building Equipments

Tower Crane Spare Parts Building Equipments

Tower Crane Spare Parts Building Equipments

Tower Crane Spare Parts Building Equipments


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q:I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
Q:You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
these cranes are self raising. as they need to go higher they raise themselves up on hydraulic jacks and another section is bolted in the gap that is left. i hope this will answer your question
Q:how to do tower crane maintenance?
Tower cranes in construction is being inspected as part of everyday maintenance. Usually, Safety In charge or a mechanical engineer do the inspection on site. Some pointers for inspection are: 1. Machine checking including motor 2. Emergency break 3. Lifting cable checking 4. Power panel 5. others Not only the tower crane is being checked, the operator and rigger also attends daily safety toolbox to update themselves on daily safety hazards on site
Q:what is the crane track base ?
Assuming mechanical I suppose that is the size of the area of the two tracks on a crawler type crane. The tracks or treads are similar to those on a tank or bulldozer. One track covers a rectangle in contact with the ground. Both tracks are spread apart, parallel and form some kind of rectangular (length x width) base area for the crane.
Q:Emergency treatment of interrupted electricity during lifting of tower crane
It is very dangerous to stop the electricity during the lifting of tower crane. Because the slewing brake is missing, the tower crane is very dangerous because the wind rotates.
Q:I know you need to put current around the magnet (or certain type of metal) in order to attract but is it possible to use as pushing an object away. if there is please tell me how!
To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
Q:What are the main technical parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q:I understand the Crane stances and know there are more than one. I am referring to the single leg crane stance. I also know that stances are only used briefly. But I am curious, does this stance have any bunkai applications? Or is it only useful against dodging a kick or preparing to kick?
I okorder /
Q:Please help me on this question, I can't seem to find it anywhere on the internet! :(
No animals depend on Siberian crane but they are a source of food to carnivores in the wild.They are usually secondary source because there are mroe source of food that carnivores could eat.SO if they are extinct,it would not be a problem...its only destroying natures beauty!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords