75 light steel keel wall to do 6m high, need reinforcement? How to strengthen?
Must do 75 keel, it is recommended to add angle iron or square tube reinforcement, do not forget to do heart keel
Light steel keel partitions and finished partitions
Light steel: the frame and the outer panel should be in the construction site processing, but also brush at least 2 times the putty +2 paint. Finished partition: mainly in the factory processing, in the field just assembled only.
To warm the above has been tiled, with light steel keel to build a wall, how to fix the keel?
With a hammer to drill the ground hole can be fixed to the ground. With glue, it is certainly impossible to nail
Gypsum board wall above the good paint glass?
Gypsum board partition wall construction operation process: (1) According to the design drawings, in the already done walls, floors, the ground release off the line, the door hole edge. (2) according to the design drawings and the actual size, with a wheel cutting machine cutting keel and classified stacking. (3) according to the line has been put away and the door edge, with nails or expansion bolts to the ground keel fixed on the ground floor, nail or expansion bolt spacing 600mm. The top of the keel into the wall of the reserved hole 100mm, and then use cement mortar packing fixed, or with nails, expansion bolts to the end of the handle along the top keel fixed to the wall. (4) According to the cut line and the edge of the door, according to the size of the file size layout, painted in the edge, along the top keel, less than the modulus should be placed in the partition with the wall at the first board. (5) According to the document mark will be cut in advance of the length of the vertical keel in turn inserted along the edge, along the top keel groove, the flange towards the direction of the proposed panel to be installed. Adjust the vertical, positioning accuracy, with rivets fixed. The vertical keel on the wall is fixed to the wall with a nail or expansion bolt, and the distance between the nail or the expansion bolt is 1m. (6) the installation of doors and windows to strengthen the installation of the keel: the first installation of the hole on both sides of the vertical reinforcement keel, and then install the hole up and down to strengthen the keel, and finally install the big hole on both sides of the upper and lower reinforcement keel and bracing. (7) Install the cross brace and support card. The vertical keel fastened, so that the entire partition keel has sufficient strength and stiffness.
Light steel keel + gypsum board + surface brush latex paint partition wall per square meter offer is how much?
Too general, and the regional difference, the amount of engineering, high-level factors led to a large spread. General tooling: light steel keel material 25 + artificial 20, gypsum board material 12 + artificial 8, scraping putty latex paint three times material 18 + artificial 12, gypsum board and latex paint count double. With auxiliary materials estimated total price of 150 or so.
Is it good for brick walls or light walls?
I suggest you use ceramic tiles, are light materials, you can hang light items (nails to be stuck in the gray seam, when the walls of the bottom of the three tiles should also use red brick, waterproof). If you have a fire on the request that use the gas block, red brick, lime sand brick, you can hang some of the items.
Light steel keel cut off the keel and the ground with what fixed?
Generally just a few fixed points on it, because the gypsum board sealed, the formation of a whole, The weight is under pressure, it can not move.
Wood keel can be used to ceiling, can be used to do the wall? Light steel keel can be used in what place?
Wood keel is best used, one is poor fire, the second is easy to produce pests, and now the ceiling are gradually replaced by light steel keel keel.