• Wall Formwork Formwork with Durable Performance and Best Quality System 1
  • Wall Formwork Formwork with Durable Performance and Best Quality System 2
Wall Formwork Formwork with Durable Performance and Best Quality

Wall Formwork Formwork with Durable Performance and Best Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Wall Formwork Description 

 

Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props.  

 

2. Main Features of Wall Formwork

 

    -convenient for construction 

    -easy to control the quality

    -easy, rapid and economical.

 

3. Wall Formwork Images

 

Wall Formwork Formwork with Durable Performance and Best Quality

 

Wall Formwork Formwork with Durable Performance and Best Quality

 

 

4. Wall Formwork Specifications

 

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5. FAQ of  Wall Formwork

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects. 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs  

     declaration, it may need 2weeks.

Q: Attached to the lifting scaffolding installation site how to write
The actual strength of concrete at the attachment structure has reached the design requirements of scaffold.
Q: Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what.
Now most of the crowd is the bowl buckle scaffolding, but now slowly being eliminated by the market. That is the fastest, most new type of scaffolding, especially if you want to have to lease it, scaffolding is more appropriate.
Q: Height in the number of scaffolding should be set up scissors
6 cross when the time is 45 degrees, across the 5 span of 50 degrees, across the 4 span of 60 degrees. The length of the connecting rod is required to overlap, the overlap length is not less than 1M, the use of three fasteners is evenly distributed, the end of the fastener is not less than 10CM.
Q: What is the difference between the bowl buckle steel tube scaffold and the steel pipe scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation;
Q: JGJ 130-2011 also has a carpenter scaffolding specification, who has to share the upload thank you
Technical code for safety of steel tubular scaffold with JGJ 128-2010 construction
Q: Floor type scaffolding construction program is what kind of, what role?
Job requirements;(4) has the advantages of simple structure, convenient assembly and disassembly;(5) according to local conditions, local materials. ?3 load of scaffold, masonry engineering requirements: 2700N per square meter per square meter 2000N, decoration engineering, scaffold in 2500N per square meter per square metre, scaffold 1000N, special circumstances should be determined by calculation. ?4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, attention not allowed to keep the foot hand eye position: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick wall, brick lintel and a beam of 60 degree angle triangle, windows and doors on both sides of the 3/4 brick and 1 brick range?.
Q: Pankou scaffolding function how powerful
Pankou scaffolding hot-dip galvanizing process, the use of up to 15 years of age or above.
Q: Bowl buckle scaffold can be used to support it
This bowl buckle scaffold will be built more stable, reduce the probability of accidents
Q: What are the types of bowl buckle scaffold specifications, I would like to know what is the hand and foot frame, bowl buckle joint is composed of what?
2 model support system -- Pankou roulette scaffolding in use, just put the plug into the hole of the ends of the cross rod pole corresponding, knock tightly connected, disassembly convenience and fast lap quality is far beyond the current use of scaffolding. ?3 model support system - type, wheel type scaffold building and removing speed is 8-10 times of scaffolding, bowl buckle scaffold is 4-5 times.
Q: I'm getting scaffolding put up round my house. Its a Normal size house and its being put up all round the four walls to the top. will it be put up in 2 hours or more? or less? I have no clue please help me.Thanks!
all depends how many guys are putting up the scaffold but I would say more than two hours

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords