Two-section long-reach boom excavtor long rech boom and arm
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Weight of Building Machine | 12T | 20T | 22T | 30T | 35T | 40T | 45T |
Parameters | |||||||
Total Length of Boom and Bucket Arm(mm) | 13000 | 15380 | 15380 | 18000 | 2000 | 2200 | 24000 |
Working Weight(Kg) | 3000 | 4000 | 4200 | 5200 | 6000 | 6500 | 7000 |
Bucket Capacity(m3) | 0.3 | 0.4 | 0.4 | 0.4 | 0.5 | 0.6 | 0.6 |
Maximum Excavation Height(mm) | 11300 | 12510 | 12610 | 13720 | 14920 | 16100 | 17300 |
Maximum Extension Range(mm) | 12500 | 15100 | 15100 | 17600 | 19600 | 21600 | 23600 |
Maximum Excavation Depth(mm) | 9000 | 11340 | 11370 | 13000 | 15000 | 16500 | 18000 |
Total Height(mm) | 2900 | 2980 | 3040 | 3210 | 3210 | 3400 | 3400 |
Additional Balance Weight(Kg) | - | - | - | - | 2000 | 2500 | 3000 |
- Q:it is an excavator is it a good scope
- 8-32 means it's variable power....8 times magnification to 32 time......50 is 50 mm objective lens and is pretty dang big and should gather light pretty good...but I've never used any Barska products so I can't tell you how it matches up to other products...but at $150 I can't be that bad lol.
- Q:We have a farmer behind our house and whenever he floods his field for multiple days at a time it gets into our basement due to waterlevel issues. We have a sump pump but it is coming in along some of the walls of the basement and getting carpet wet. WE have fans on it right now and it should be ok for now. We've tried talking to the farmer before but he doesn't give a crap because he is an old angry man ( i hate him so much) So I am wondering if there is anyway we can make him only water every 3 days or so because he won't listen to reason. It is also causing problems for some of our neighbors so would it be possible to get like a petition and turn it in to the city? would that work?or what else can we do!?!?thanks!
- Its not his fault it the person who built the house if there is a ground water problem it is because the builder did not anticipate the obvious the farmer was already there you cant tell him not to water his crop the builder cheaped out.
- Q:can someone give me a full list of weapons in dead rising? for the 360
- 2'x 4 Acoustic Guitar Baking Ingredients Barbell Baseball Bat Bass Guitar Battle Axe Bench Boomerang Bowling Ball Bucket Cactus Canned Food Canned Sauce Cardboard Box Cash Register CDs (30 count) Ceremonial Sword* Chainsaw Chair Chinese Cleaver* Cleaver Cooking Oil Condiment Dishes (30 count) Drink Cans (12 count fridge pack) Dumbbell Electric Guitar Excavator Fence Fire Axe Fire Extiguisher (100 % full) Frank West Frying Pan Garbage Can Gems (10 count) Golf Club (and 30 balls) Gumball Machine Hand Gun (30 bullet clip) Handbag Hanger HDTV Heavy Machinegun (and a whopping 200 rounds)* Hedge Trimmer Hockey Stick (and 30 pucks) Hunk of Meat (ewwwwwwwwww) Hunting Knife Katana King Salmon Laser Sword* Lawn Mower Lead Pipe Lipstick Prop Machete* Machinegun (with 150 bullets) Mailbox Mailbox Post Mannequin Female Mannequin Male Mannequin Limbs (arms and legs) Real Mega Buster* Mega Buster* Molotov Cocktail* Nailgun (and 60 nails) Nightstick Novelty Masks (bear, horse, servbot, and imp) Oil Bucket Parasol Paint Can Painting (5 flavors) Perfume Prop Pet Food Pickaxe* Plywood Panel Potted Plant (6 flavors) Propane Tank (small) Propane Tank (large, w/ dolly) Push Broom Push Broom Handle Pylon Queen Rat Saucer* Rat Stick* Rock Sausage Rack* Saw Blade Shampoo Shelf Shopping Cart Shotgun (with 20 round capacity) Shower Head Shovel Sickle Sign Skateboard Skylight Sledgehammer Small Chainsaw* Smokestack Sniper Rifle (and 30 bullets) Soccer Ball Spitfire Steel Rack Stepladder Store Display Stool Stuffed Bear Stungun (with 100% of charge) Submachine Gun (with a 150 round clip) Sword Toolbox Toy Cube Toy Laser Sword TV (non-HD) Vase Vehicles Water Gun (with 30 squirts) Weapon Cart* Wine Cask Zombies collect the whole set!!!
- Q:When do i pay contractors in building a house?Im building a new house and i am currently arranging to have the excavator contractor there to install septic and excavate for the foundation. Then im having the foundation contractor come in to do his job. I live in Nova Scotia if that makes any difference. im doing my own work after the foundation except plumbing and electrical. Should any of these guys be asking for money up front or part way through? Or do they finish then bill me with 30 days to pay? Whats the normal procedure? no mortgage.
- You have a couple of viable answers Denise. You can pay for the materials (septic tank, gravel, concrete, etc.) up front and pay the contractor about 25% of what their bill for labor is, then pay them the remaining 75% after the inspections are completed, or you can pay 50 - 50 as indicated above. A word of caution: make sure the contractor has paid their subcontractors / suppliers when you pay them, otherwise you may be sued by the unpaid party. I'm a project manager in Michigan, so you should check out how this works there. Here we have to get a sworn statement and waiver of lien when we pay the contractor to ensure their subs have been paid. Good luck!
- Q:What is a Pneumatic Lego used for?
- Robotic arms, cranes, walking machines, machine-tools such as excavators, lifting bridges.
- Q:What is included in an amalgam tray setup in order from left to right?
- Here's my setup: Mirror, explorer, endo explorer, locking cotton pliers, cotton pliers, small spoon excavator, large spoon excavator, Dycal instrument, amalgam carrier, plugger, discoid cleoid, ball burnisher, acorn burnisher, plastic instrument, spatula, scaler and articulating paper. As you can see, in addition to the 'regular' amalgam instruments, we also have what would be needed if we had to recement/insert a crown or do a post and core in addition to the filling.... we're prepared and won't need to open up another setup... Hope this helped. :)
- Q:I have tried to my dismay a 90 LB air powered jack hammer. I get through the slab but have to bury the bit twice and still can't pry the chunks out with a Johnson bar. I'm thinking maybe having an excavator come in to try something. Any ideas? Should I cut it up with a saw and take it out in chunks? It's 8quot; thick and slightly more in some spots.
- Excavator with a hammer on it . In a couple of hours it will be gone . load in a 20 yd container $ 1200 - $ 2000 done .
- Q:What is the difference between a backhoe and a backhoe?
- The form of shovel action of the shovel. It is characterized by "forward, upward and forced cutting."". The positive shovel has great excavation force and can dig the soil above the stopping surface. It should be used for the dry foundation pit with excavation height greater than 2m, but the upper and lower ramps should be set up.
- Q:I opened the access door on the side of the track thinking there would be a standard zerks fitting but found none. Is there a special grease fitting needed?
- Use titanium silicone tritium lubricant with a 7/16th metric lug nut!
- Q:Check the Internet, there is no detailed description of this is very vague, so consult the great God of Baidu who knows, give an answer, if this is the difference between the two, which makes more money, is for others to open, buddy is Anshan
- Commonly known as hook machine, excavator digging machine etc.. The small arm joint of the excavator can also be replaced with a furrow opener. As you say, it should be a concept. Excavators are large, small, large excavators, higher wages, mainly to look at the technology.I hope it will help you.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Two-section long-reach boom excavtor long rech boom and arm
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords