• Tower Cranes self climbing grove QTZ160(7055) System 1
  • Tower Cranes self climbing grove QTZ160(7055) System 2
  • Tower Cranes self climbing grove QTZ160(7055) System 3
Tower Cranes self climbing grove QTZ160(7055)

Tower Cranes self climbing grove QTZ160(7055)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
60 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ160(7055) Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity: 6T 

Rated Lifting Moment:1000KN.M    Max. Lifting Load: 6T 

Max. Lifting Height:252M               Span: 70M 

Model Number:QTZ160(7055)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTZ160(7055) Features

1. Export to more than 20 countries with CE/ISO/GOST Certificates.

2. Stationary/Travelling, external/ internal climbing tower crane 

3. Impeller blasting/rust protection paint

4. Advanced painting process

5. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

6. New designed mast, can be used to Internal and external climbing tower crane

7. Engineers available to service machinery overseas.   

QTZ160(7055) Specification

Tower Cranes self climbing grove QTZ160(7055)

QTZ160(7055) Pictures

Tower Cranes self climbing grove QTZ160(7055)

Tower Cranes self climbing grove QTZ160(7055)

Tower Cranes self climbing grove QTZ160(7055)

QTZ160(7055) FAQ

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.




Q:What role does the tower crane torque limiter play?
The torque limiter can play the weight overload or working radius beyond, beyond the technical performance of the tower crane at the moment, immediately cut off their own lifting or variable power source, will send the alarm signal to prevent the occurrence of accidents.
Q:How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q:A 3000-lb wrecking ball hangs from a 40-ft cable of density 10 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 40 ft in the air by drawing in the cable.
The total work done by the crane equals the potential energy gained by the wrecking ball and the cable; the potential energy gained is W = V_final = Mg L + ρ L g L/2 which is the final potential energy of the wrecking ball and the cable added together. In the case of the cable, you take the center of mass of it which is located right at the center (L/2). The result is then W = 3000*32*40 + 10 * 40 * 32 * 40 / 2 = 4096000 ft-lbf = (4096000)*(0.001285067) BTU = 5263.63 BTU
Q:If you make 1000 origami cranes is it true that you will get a wish or good luck. This is based on a Japanese myth
It's like asking: If you make a wish on a shooting star, will it come true? Although both are nice gestures, no it will not come true. Origami cranes are simply pieces of paper that are folded to resemble birds; no matter how many you make, they will not take on supernatural abilities such as wish-granting.
Q:What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
Q:if anyone can inform me about any of these styles in debt even if just one id greatly appreciat itbest ansewer will be hard here cause i will b thankful for all who give a sincere ansewer
That is not much of a question. Then again I can see based on your grammar and spelling that you took very little time in considering it. Oh, and btw - Striking concepts is not a style... Thanks, but it's fairly obvious to me this Question is merely for Yahoo points.
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:What measures should be taken to make tower cranes stable?
Increase deadweight and weight.Crane wire rope is phosphate coated steel wire, galvanized steel wire, stainless steel wire rope or coated steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope - double coating phosphating, phosphating coating to improve the wear resistance and corrosion resistance of steel wire that is not easy to wear and corrosion resistance is to improve the working life of the plain steel wire rope will be completely eliminated.
Q:I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
Well, ..., it flies away and crashes in the distance. In the coming days the MRO will fly over the landing site and send pictures back of both the parachute, Heat Sheild, Capsule, and Sky Crane. In the meantime watch the video below. It will help you learn more information about what happened. --- Edit --- Check out the last link below. it show the parachute, Capsule, and the heat shield (after separation) all still in free flight. Give it some time they'll find the sky crane for you. --- Edit 2 --- Here's the link to a photo showing where the Heat Sheild, Backshell and Parachute, Curiosity, and yes, the skycrane are in relation to each other on Mars. See: www.nasa /mission_pages/msl/mu...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords