• Tower Cranes Inner Climbing Model of QTG10 System 1
  • Tower Cranes Inner Climbing Model of QTG10 System 2
  • Tower Cranes Inner Climbing Model of QTG10 System 3
Tower Cranes Inner Climbing Model of QTG10

Tower Cranes Inner Climbing Model of QTG10

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTG10 Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity: 6T 

Rated Lifting Moment:600KN.M    Max. Lifting Load: 6T 

Max. Lifting Height:40M               Span: 50M 

Model Number: QTG10

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTG10 Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTG10 Specification

Tower Cranes Inner Climbing Model of QTG10

QTG10 Pictures

Tower Cranes Inner Climbing Model of QTG10

Tower Cranes Inner Climbing Model of QTG10

Tower Cranes Inner Climbing Model of QTG10

QTG10FAQ

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.




Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I okorder /
Q:Grade 4 build a working crane Help!?
Simple crane? Get a spool, maybe one from sewing thread. Attach it to a small base so that it can rotate freely. Put a pencil through the middle tight enough so that when the pencil rotates the spool rotates. Glue a tab on the end of the pencil at a right angle to the pencil so you have a handle. Attach string to the spool and then maybe a ruler or stick to a base lined up with the spool like a crane. Put a couple of eye hooks on the stick and feed the string through so it hangs down at the end of the stick, like a crane cable. At the end of the string put a springy clothspin so that when you pull the string the clothspin opens and closes. Now you can lift and lower the clothspin by rotating the spool with the pencil. Pulling on the string opens the pin to pick up things.
Q:What is the book about?Is it a good one?
My teacher read it to my class a few years ago so its kinda hard to remember, but it was about a girl living in Japan who gets diagnosed with a disease (i think cancer, but i'm not sure) and she beleived from the old Japanese story, that if you make a 1001 paper cranes, you would be granted a wish. Of course her wish would have been to live without the disease. Though, sadly, before she could make 1001 paper cranes, she lost to the disease and died. It had some really sad parts in it too, like how her best friend in the hospital with her died too. Also, this was a true story Her school desided to finish making the cranes for her, (which was very sweet) :) Our school also did it too hope you read it!
Q:I've been making lots of paper cranes lately, thinking I would know exactly what to do with them. In reality, I'm a bit short on ideas... Can you help me with this, because I'd love to find ways to decorate my room with them. I can't really use nails on my walls or ceiling, so I can't do a mobile or randomly string them about.
Okay - so if you can't string them from the ceiling - than what I would do is buy some round vases/globes, from Pier one or some place like that, and fill them with paper cranes, then set the bowls on your shelves/windowsill/desk/table or other flat surface. I've enclosed some examples below. You can also make a mobile by hanging something like a super strength hook with adhesive. 3M makes them (the same folks who created scotch tape). The adhesive does not damage walls and you can stick them to anything. They can bear up to 30 pounds of weight. Put a few on your ceiling or walls and hang your mobiles from them.
Q:I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
President Snow killed him because he allowed the games to break its rules for the first time ever by having two victors. What Katniss and Peeta did was a sign of rebellion and the Capitol relented by letting both of them live, otherwise that there would be no victor. That was not supposed to happen and President Snow had already warned him to stop any signs of rebellion prior but Crane let it happen. Someone needs to be held responsible and since Crane is the gamemaker, he has to die. This is to show that no one holds greater power than Snow over the districts and Capitol and no one should defy him. Rebellion leads to death, no matter what your role is or how you might have contributed to it.
Q:the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
The crane isn't growing. The cranes lift themselves up to the current top floor, build up around them, and repeat as necessary until they reach the top. The tallest cranes in the world are nowhere near as tall as the tallest skyscrapers - so the only mechanism to build very tall structures is to keep the cranes at the top of the building as it rises.
Q:What is the load moment of a crane?
The load moment for a crane is a number measuring the weight of the load lifted times the distance between the mass and the centre of the crane's superstructure. For example, a 20 ton weight lifted at 5m away from the crane (in reality, right next to it!) gives us a load moment of 100 ton*m, the same as a 10 ton weight lifted 10m from the crane. Cranes can handle higher load moments closer to the crane, so really heavy lifts are always done from very close to the load.
Q:science project
It is neither. The way a crane works is with a winch or a drum that will roll the cables in and out Of course the winch has to be powered, it can be hydraulic, electric, diesel , V-8, or the old Egyptian way with block and tackle. If the system is powered with a hydraulic motor it still does not make it a hydraulic machine by definition
Q:Tower crane demolition safety technical disclosure, how to write?
Baidu search:Tower crane removing and lowering joint safety technical disclosure.
Q:What are the necessary safety devices on a tower crane?
(3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords