• Tower Cranes self climbing grove QTD3020 System 1
  • Tower Cranes self climbing grove QTD3020 System 2
  • Tower Cranes self climbing grove QTD3020 System 3
Tower Cranes self climbing grove QTD3020

Tower Cranes self climbing grove QTD3020

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTD3020 Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity: 2.9T 

Rated Lifting Moment:600KN.M    Max. Lifting Load: 2T 

Max. Lifting Height:27.5M               Span: 70M 

Model Number:QTD3020

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTD3020 Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTD3020 Specification

Tower Cranes self climbing grove QTD3020

QTD3020 Pictures

Tower Cranes self climbing grove QTD3020

Tower Cranes self climbing grove QTD3020

Tower Cranes self climbing grove QTD3020


QTD3020 FAQ

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q: What about our tower crane's warranty?


A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.





Q:I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
Q:where does it live? what does it eat? How do you feel about it? (positive side)thank you! thank you! thank you!help!help!help!
In the spring and summer, the Red-crowned Crane breeds in Siberia and occasionally in northeastern Mongolia (i.e., Mongol Daguur Strictly Protected Area). Normally the crane lays 2 eggs, with only one surviving. Later, in the fall, it migrates in flocks to Korea, Japan, China, Taiwan, and other countries in East Asia to spend the winter. All Red-crowned Cranes migrate, except for a flock that is resident in Hokkaidō.
Q:My dad has some old tools and he is wondering if the company is still around, or what happened to it. A yahoo search revealed little.
Hot jobs- fashion Champions- A Extraordinary- B Hot Music- 1995 Villian-A Famous First- A Spiral Frog- e
Q:Can the attached arm of the tower crane be welded?
The attached arm of a tower crane can not be welded and can only be bolted.Adhesion calculation of tower craneTower crane attachment (anchor) device structure, internal force and installation requirements in the use of narrative instructions so in the tower crane installation and use, the use of units can be executed according to the requirements, do not need to calculate, only when the tower crane installation position to the building from the over manual provisions, to increase attached rod (Zhi Chenggan) two, spacing or attached rod connected with a building when changing to attached calculation.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
The rental price of tower crane consists of the cost of advance and retreat yard and the monthly rent of tower crane. The cost of the advance and retreat yard includes the loading and unloading costs, transportation costs, installation costs and monitoring expenses of the tower crane. The rent of the tower crane includes the cost of tower cranes, the cost of tower crane maintenance and the wages of the crane drivers. At present, many sites are using lease way to use tower cranes, so that the occupation of the site will be less rent, investment will be relatively small.
Q:What is the most amount of weight lifted by any crane?
Buffalo Hydraulic built a crane for NASA to lift their launch pads. The heavy one weighed about 5.4 million pounds, but the crane could handle 9 million if it had to.
Q:in the red badge of courage explain the mechanical metaphor crane uses to describe war?
I don't have a copy of TRBOC around but what you want to look for is a passage in which war is compared to, say, a machine of some sort.
Q:I'm looking for estimate including installation, vertical support beams, and bus bars. Details: rectangular shaped building 500 ft long split lengthwise into two sections. 500ft X 4lengths of craneways is 2000ft. The crane runways are bolted to building frame but are self supporting on I-beams (104 vertical supporting beams X 24ft. height). The crane runways can support 10ton hoists. The bus bars (electrical conductor assembly) run along all (2000ft) of crane runways.
Preformed okorder / We Build Cranes To Meet Your Needs And Your Budget. Free Quote. Offers a free quote. click link .
Q:Please no direct translations. I need the official name of the whooping crane in French.
Grue Blanche is correct =)
Q:because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords