Tower Crane TC7034 Construction Equipmen Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7034 Description:
1.CMAX Tower Crane TC7034 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7034 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7034 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7034 Parameter:
Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 3.4
Tower Crane TC7034 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7034 Diagram:
Tower Crane TC7034 Technical Sheet:
Tower Crane TC7034 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: OMG! a phoba of crane flys, and there are 5 on my celling right now!!! What do I do, will the move and fly around eventually? I can't kill them, they are out of my reach, and if they start moving, im runing the %^$ outta my house.Will they die by tommorow? or will they just hang there?
- Yuk! I feel your pain - I hate crane flies, too. They are the only animals I don't like. I know they are harmless but they're just so damn creepy, with all those horrible long legs just waiting to dangle on your face! *shudder* My normal way of dealing with them is to smack them with a magazine or newspaper, but if they're on the ceiling I'd go with the person who said suck them up with the Hoover. If you can stand to have them in the house much longer, you could just wait for them to die - they only live 24 hours (in their adult form, that is - they will already have spent some time as larvae). In response to mj1112's answer, crane flies do not eat mosquitoes! As adults they usually do not feed at all, since they live only 24 hours - if they do, it will just be a sip of nectar.
- Q: I know, do you know?
- Usually another crane is used to hoist modular sections an erect the crane. Some large construction cranes build themselves using modular tower sections. The boom and crane cab lifts itself on a track, the crane lifts a modular section of tower from the ground, and inserts it under the cab. The top lifts itself up and starts again. Check out the video below. Incidentally, enormous blocks of concrete are poured on the ground to support cranes like this one, and are too massive to remove when construction is complete. So, many tall buildings have huge monolithic hunks of concrete in the ground at their base....
- Q: need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
- 1. If You Mean Their Personality Then Tohru From Fruits Basket. 2. a. Pink. Purple. Blue b. Full Moon's From Full Moon wo Sagashite. 3. I 3 Shojo! 4. Put Some Kanji! 5. My Swiss Fudge Cookies! Anime Q- I've Never Seen Any That Do.
- Q: What does tower crane jacking up mean?
- First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
- Q: The cantilever part has to stay at least 6-12 inches off the ground.
- My son and I used to do a couple of things with them. We would make masks. Get some of the cheap paper plates, glue the sticks to them - cut out and decorate. You can make animals, people, it is a lot of fun. The log cabin is a great idea, but a little hard for that age. So we made our log cabins on construction paper, Glue the stick on there in the shape of a house. Good times!
- Q: S930 M50 (M125/75) level jib tower crane about how much money
- Do you want to see is that, generally is Sishijiwan
- Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
- Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
- Q: My boyfriend's a little sick right now, and he's going to have a surgery over summer. I'm in the process of folding him 1000 cranes (like the Japanese legend), and in every crane I wrote a message. I have a list of all the messages so far. I'm not sure how to give it to him, though. 1000 cranes is a lot of cranes... and I don't want to make him carry a big heavy box or anything. I also want him to be able to read the messages... something I didn't think of much when I decided to write them on the paper I folded the cranes with...Anyway, I was thinking about a scrapbook or something. But that would be a really big scrapbook. And I'd have to probably write out all 1000 messages again in it... Plus, I'm not sure if I can find a scrapbook with enough pages.Any ideas?
- 3 Aw that is so sweet, maybe you can make a mobile or tie them all on a string. i also really like the scrapbook idea, maybe u can make the cranes small so that they all fit in the scrapbook.
- Q: What are the climbing claws on the tower crane?
- Climbing is lifting work cylinder claw pole on the standard main limb rod bearing points of the.
- Q: What do lattice boom and hydraulic boom in cranes mean?
- LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.
Send your message to us
Tower Crane TC7034 Construction Equipmen Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords