Tower Crane QTZ40 CMAX New Condition Crane
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Detail of Tower Crane
Feature:Tower Crane Condition:New Model Number:TC4808(QTZ40) Place of Origin: China (Mainland) Brand Name: CMAX Certification: ISO,CE Warranty: 1 Year Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed. 3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide? A: Providing timely delivery, standby engineers are ready to slove any of your problem Providing all-embraced warranty of products quality, worksite installation guidance Providing ample spare parts and training of operation and maintenance Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ? A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty? A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ? A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer? A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view. | |||||
(0) |
- Q:how do they get cranes on top of building sites?
- With anouther crane.
- Q:I have been doing a science projet and i cant find it anywhere
- The wild Whooping Crane flock spends its summers in Wood Buffalo National Park in the Northwest Territories of Canada. They nest and rear their young there. During the fall season, the Whoopers migrate 2,500 miles south to Aransas National Wildlife Refuge in Texas where they spend the winter and early spring. There are currently 193 birds in this flock.
- Q:What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
- It is MTC 78000 in offshore industry.It can able to lift nearly 2000 tonnes and is one of the world's biggest slewing cranes.
- Q:I need several quotes from Thousand Cranes by Kawabata (Don't remember first name, it starts with a Y) depicting passion.At least two.Best answer goes to whoever provides the most useful quotes, not a randomly compiled list.
- squawk arrrk croak squeee rakkk that pretty much sums it up. the other quotes from the thousand or so cranes are just variations on these
- Q:Synopsis for the poem Lost Dances Of Cranes?
- If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
- Q:How are those really tall construction cranes assembled ???
- its a truss... they take each piece and attach it... its no hard
- Q:how to make an simple electromagnetic crane?
- STEP 1 Buy a Crane Step 2 put a electromagnet on iy Step 3 stick ur name on it you get DIY crane
- Q:i have a report on it and its due on the 20th
- They're loud. I've stopped traffic many times to let them walk across the road. They mate for life. I saw a Chinamen try to catch one so he could eat it once. True story.
- Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
- No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
- Q:Tower crane 5610 why is it called QTZ63?
- Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane QTZ40 CMAX New Condition Crane
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords