Tower Crane QTZ40 CMAX New Condition Crane

Ref Price:
$30,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 4T Maximum Lifting Height(M): 110M Rated Loading Capacity: 0.8T
Span: 48M Rated Load Moment: 40T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC4808(QTZ40) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane 4808 40T.M New Mini Crane in China

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China



Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When building tall buildings, where is the bottom of the tower crane installed?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.
Q:Origami crane word problem?
Paul does 100 cranes in 5 hours So in 1 hour he does 20 cranes In 3 hours he does 60 cranes and balance 40 cranes Jon does Jon = 40 cranes in 3 hours So 100 cranes = 100/40 X 3= 7.5 hours ANSWER
Q:Will My Tripod Support a Crane?
Please let me know where you will be so I can capture the video of your camera crashing to the ground. Because you overloaded the tripod, there will be no warranty coverage for anything. Yes, they can tell. ++++++++++++ I realized I had not provided an alternative... the crane specs also specify Camcrane 200 mounts on the 3/8 standard bolt found on the majority of medium and heavy duty tripods an
Q:What are the forces acting on a car being picked up by a crane?
Gravity acts downwards, force = mass x acceleration. Crane acts upwards at same force. As the crane starts to lift the car there is upwards acceleration that causes more force to be generated for a moment.
Q:What is the calibration value of a tower crane?
Three, gravity moment MThe product of amplitude L and the corresponding lifting objects called Q gravity lifting moment, the unit is kN - M.Tower crane capacity is based on lifting moment representation. It uses the product of the maximum working range and the corresponding maximum lifting load as the calibration value of the lifting moment.Four 、 lifting height HIt refers to the vertical distance from the surface to the parking level of the crane sling allows the highest position. The unit is m.Five, work speed1. lifting speed (down) Vn - stable state of motion, the vertical displacement velocity of the rated load. The unit is m/min.2. crane (CART) running speed of Vk, stable state of motion, the running speed of the crane. The operating speed of a crane with rated load on the horizontal (or horizontal rail) surface, at the height of 10m away from the ground, and when the wind speed is less than 3m/s.
Q:airsoft m4 full stock, to crane stock?
you need a crane stock and a buffer tube for it. the full stock does not use a buffer tube. you simply guide the wires through the buffer tube (once you attach it to the back) and into the stock. then just pu the stock on and put the batteries in and viola! crane stock!
Q:What are the differences between the tower crane and the lift?
Tower cranes are a common fixture at any major construction site. They're pretty hard to miss -- they often rise hundreds of feet into the air, and can reach out just as far. While, Lift is the force that directly opposes the weight of an airplane and holds the airplane in the air. So, first answerer is right they not something alike.
Q:What is the safe distance of a tower crane to the surrounding buildings?
It's 5 meters up and down. Outside the radius of rotation is 3 meters, such as QTZ5010, tower crane rotating radius type, 50 meters in diameter, one hundred meters outside the scope is safe
Q:In what season does the whooping crane migrate?
The wild Whooping Crane flock spends its summers in Wood Buffalo National Park in the Northwest Territories of Canada. They nest and rear their young there. During the fall season, the Whoopers migrate 2,500 miles south to Aransas National Wildlife Refuge in Texas where they spend the winter and early spring. There are currently 193 birds in this flock.
Q:Are steam cranes still used to clear train derailments?
They started to go by the wayside in the early 80's around here, though they were still in use until technology caught up and they could manufacture a 200 ton capacity crane for use on the highways. They had Hi-rail equipment and could get to the scene of a derailment much quicker than the old steam derricks. Near the end, I know there were at least 5 still operating, but the problem was, there were only two guys on the system that could run one of the things. Steam is the key word. We're all used to seeing crane operators running the machine from their little cab and moving the levers that control the hydraulics. But, it was amazing to see a guy run one of the Bucyrus Erie 200 ton derricks. All the functions were controlled by various valves that were scattered around the operators position, and it was like watching some kind of choreography; ballet, even. The sights, smells and sounds of the thing in action were no less eye catching than watching the operator himself.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range