• Tower Crane QTZ100 New and Second Hand Condition System 1
  • Tower Crane QTZ100 New and Second Hand Condition System 2
  • Tower Crane QTZ100 New and Second Hand Condition System 3
  • Tower Crane QTZ100 New and Second Hand Condition System 4
  • Tower Crane QTZ100 New and Second Hand Condition System 5
  • Tower Crane QTZ100 New and Second Hand Condition System 6
Tower Crane QTZ100 New and Second Hand Condition

Tower Crane QTZ100 New and Second Hand Condition

Ref Price:
$30,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
8T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.6T
Span:
55M
Rated Load Moment:
100T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5516(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane 

 

Tower Crane 8 Ton Max Capacity TC5516 New Condition

Tower Crane 8 Ton Max Capacity TC5516 New Condition

Tower Crane 8 Ton Max Capacity TC5516 New Condition

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China



Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Q:I am 15 years old and into urban exploration. The only thing I haven t done yet is climb a crane. I don t want a big lecture on the dangers because I am fully aware of how dangerous it is and am also fully confident in my abilities. I am also ready to take full responsibility if I were caught. Although I know its Illegal, I don t know how Illegal it is and I would like to know the following...1. Will Crane Climbing get me charged with criminal trespassing?2. Will I get time in Juvenile?3. Is it possible that I could accidentally activate/deactivate something that would endanger the workers?4. What would happen if a worker got ahold of me?And again I feel like I need to mention that I don t want a Bull **** lecture on it not being safe. :)
Just do it. It will be great, just like in assassins creed. There will totally be a hay bail waiting for you. Don't worry about the law when you jump.
Q:Jin Title required 20 large equipment testing reports. The personnel system is really rubbish, so we don't know what to do professionally.
Said here [] large equipment is a concept that means assessment of whether you did more complete, more complex, (conceptual) large equipment, imagine that you provide [small] equipment detection report may not require? If you can provide a full set of drawings of a mobile phone, it will be recognized, but the mobile phone is never a large [device], the key point, appraisal is the assessment of your ability, to see if you have experienced, or complete certain system equipment manufacturing processThere should be no concept of magnitude, and it's really not a good division of magnitudeAs many job posting said, that is the requirement of [bachelor], college students will be delayed if from yourself, if you have the strength, should be bold to recommend myself, because any recruitment notice can't say: we only recruit college students......
Q:What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
Q:how do they get cranes on top of building sites?
One way is another crane, although I think you are talking about the ones for really tall buildings. In those cases, they use a crane (self-hoisting tower crane) that is able to raise or hoist itself up as construction continues. For example, it will be working on the 10th floor, and then it will climb the recently placed girders to the 11th floor, and so and so forth. Sometimes the crane is disassembled at the top... other times, it is kept there to aid in window washing.
Q:I am looking for guidance on determining the optimal design parameters for the design of an overhead travelling crane when considering a span of 60m and a lift requirement of 2500Tonnes. If not possible what would be the maximum lift for the same span
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:any1??
forces for cranes are dynamic , so u'll have repeated cycles of compression tension ( i assume it's a trussed crane). but generaly for a cantilever , the main forces are -ve Bending Moment +ve shear which changes the rft. bars position if dealing with R.Concrete for example
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
2 the tower crane without counterweight is mainly the city fast loading tower crane. It is characterized by the absence of balance arm, and it is impossible to have counterweightThe layman can not tell the can see the appearance, there are long steel structure before and after the weight of the tower body, and no weight of the tower body with only one steel structure (i.e. jib crane, structure)
Q:what are the number meanings for paper cranes?
Hey Mary, Don't let the web site name fool you, it does discuss the deeper meaning behind paper cranes. Steeped in ancient myths and carrying resonant cultural meanings, the crane occupies a central role in the Asian imagination. Anyone who has witnessed cranes flying through the early morning mist over shimmering green rice paddies will readily understand how the mysterious beauty of the crane has captivated Asian life and art for centuries. Like the dragon, tiger, and phoenix, the crane ranks among the favorite motifs for Asian artwork because of its rich meaning and history. Read more at the web sites.
Q:is this a grey crowned crane?
yes it has to be
Q:A crane operator was extended his Tadano crane boom(two section of boom out of five) at almost 0 degree boom angle. My question is-Is it safe to lift any load at 0 degree boom angle.
I suppose Tadano is the manufacturer and they make several models most of which are safe at zero degrees with two sections extended. The weight of the extended cable and hook need to be added to the weight being lifted or lowered, so the allowable weight could be zero for a very long cable. Some safety factor is present, so you may choose to push your luck. A cable that breaks suddenly can whip around in a dangerous manner. If you bend the boom replacement will be very costly. If the boom was bent in a previous lift, it is much weaker than an unbent boom and the extending feature may jam. Neil

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords