• Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50 System 1
  • Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50 System 2
  • Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50 System 3
Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50

Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ50  Description

Feature: Tower Crane

Condition: New

Application: Construction

Rated Loading Capacity: 4 ton

Rated Lifting Moment: 400 KN.m

Max. Lifting Load: 4 ton

Max. Lifting Height: 120 m

Span: 3-47 m

Place of Origin: Shandong, China (Mainland)

Brand Name: Meida

Model Number: QTZ50  tower crane

Certification: CE, ISO, SGS, GOST

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Material: Q235b

Electrical components: Schneider

section dimension: 1.5*1.5*2.2 m

Power: 26.7 Kw

Rated hoisting capacity max radius: 0.8 ton

Working environment temperature: -20 to +55

Free standing heigh: 29 m

Jib length: 47 m

Machinery weight: 19.5 ton

Color: yellow or optional

QTZ50   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ50   Specification

 Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50

QTZ50   Pictures


Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50

Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ50

QTZ50   FAQ

Q: What is the meaning of the tower crane’s code?

A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. Nationallevel Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: i need the names of the organisms. like names of insects or fish or what ever they eat. give the organism's name. don't just say fish or insects. i need specific names.this is for a biology project.
Diet okorder /.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
Q: Denny Crane (played by William Shattner), and Alan Shore (played by James Spader) are partners in a Boston law firm. I would like to know if those those two are father and son in the series,
NO. They are good friends.
Q: What special operators should be equipped for the installation and disassembly of tower cranes?
2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q: What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical.
Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
Q: What measures should be taken to make tower cranes stable?
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q: They;re ENORMOUS!!! Do they take them apart or something?
Pop bottle rockets make them all fly away really fast. If they fly over you watch out for the poop!
Q: how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
The cranes are taken to the top of the buildings in pieces and then they are built together whilst up there.
Q: So, this might seem like an odd question, but here goes.I work in an office and outside the windows there's a crane. Every day I come in from work, it has turn a little. The half-finished building that it stands next to is not being worked on and there's never anyone using the crane during the day. There's no other construction going on in the area is stands at.It's pretty high up like 6th to 7th floot and it's in a windy town. Does that matter?Why would someone turn around a crane during the night? Is it all a scheme to make me paronoid because they know I'm starring out the window most of the day?
I assume it's a tower crane, in which case it's probably because if it's locked and the wind is too strong it will collapse. However if it's free to rotate it'll simply move according to the wind direction

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords