Tower Crane QTZ100 Panel Mast Section New

Ref Price:
$30,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 8T Maximum Lifting Height(M): 200M Rated Loading Capacity: 1.4T
Span: 60M Rated Load Moment: 100T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6014(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 Tower Crane TC6014 Panel Mast Section 8 Ton

Tower Crane TC6014 Panel Mast Section 8 Ton

Tower Crane TC6014 Panel Mast Section 8 Ton


 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Help with origami flapping crane?
heres one with others on the page. happy folding
Q:Grade 4 build a working crane Help!?
I would use about a 2 foot piece of broomstick pinned through a hole in one end. Maybe 2 to 3 inches away, a larger clearance hole with a 1/4-20 nut glued under. Use a lo-o-ong 1/4-20 bolt as a driver. (1/4-20 is 1/4 inch diameter with 20 threads per inch.) I leave the mounts and string up to you as to encourage your participation and creativity.
Q:Is the tower crane a special type of work?
Certainly, it belongs to the high-altitude workers, not the special workers, what is the tower crane talent network is a platform for the exchange of tower.
Q:Asian crane picture and symbols- can anyone tell me anything?
♡The other answers already have some great info! I live in Japan too so let me try to answer your Q. the best I can from what I know. This image is used for Japanese Congratulations- omedetou おめでとう (omedetai) and good fortune, prosperity and good luck as well. It has a GOOD meaning. When I was married to my hubby here in Japan, some of our wedding gifts were wrapped in Japanese cloth with this image. The bird is a crane, as everyone already said and is the symbol of longevity, long continuance. The kanji is for the word crane (bird) - tsuru 鶴 as also mentioned, in Japanese. The tree is a Pine (tree), or matsu 松. (It's part of my last name!) The center circle is the sun, often seen in such scenes. This design can be found on some wedding kimono in Japan as well as Japanese screens, decorative plates (I have one) and dishes. It's rather beautiful and I think it would be a gorgeous tattoo! Hope this helps!♡ EDIT: The small red symbol under the big black kanji is just the hanko- Japanese stamp of perhaps the artist. Not really part of the design.
Q:I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
it climbs the tower as the tower goes higher. the crane has 8 mechanical legs that it lift it self mechanically.like a spider in a tree or as the tower goes higher workers add a piece at the bottom of the crane using hydraulics
Q:How to calculate life span of steel structure? for example, crane?
With bridges that you would be able to calculate an anticipated lifespan. It is going to now not be very particular. You measure the deflection as a given load goes over it. You also measure deflection with average site visitors.You are taking measurements of what normal visitors is. With this knowledge that you would be able to undertaking lifespan and prefer exchanging bridges earlier than they crumple. Once I was once a engineering student I had a summer time job serving to to experiment bridges.Most bridges and gigantic constructions are designed to are living 50 years I believe. For constructions I have no idea of any measurements you would take. I think it is most often a matter of periodic inspections. The things to seem for are basis problems, cracking of concrete, exposed re-bar, concrete flaking off etc.
Q:If garden gnomes and oragami cranes were to battle with one would win?
gnomes.. all day.
Q:Equipment safety of tower crane
Some use units over profit, not pay attention to safety, small horse cart, overloading seriously, tower crane accident is one of the main source of high incidence. Some manufacturers in order to meet the construction requirements of the enterprise, expand sales, to occupy the market, will be independent of height increase, the boom will be lengthened to increase the tower coverage, this is bound to reduce the stability of tower crane, reduce the rated lifting weight, increased insecurity. There are some private and unauthorized modification of the tower crane tower crane in the assembly, this part of the tower crane for a long time in the second-hand purchase price is cheap, not willing to invest in maintenance, and frequent failure, which should arouse our attention, we should seek truth from facts, according to local conditions, to solicit the views of all parties on the basis of the introduction of relevant the supporting policies to solve this problem. By strengthening the safety management of several aspects of tower crane, it can effectively prevent all kinds of accidents in the process of tower crane use, and play a preventive role. Practice shows that as long as the construction enterprises, factories, construction administrative departments, in accordance with the tower crane detection institutions can each link to do, to strengthen the safety management of the tower crane, can effectively control the incidence of major accident of crane.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:what does dog everything mean in crane lift lingo?
it means to stop the crane from doing anything, just sit still untill otherwise told to carry on

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range