• Tower Crane of Chang Li Model Number QTZ200(7020) System 1
  • Tower Crane of Chang Li Model Number QTZ200(7020) System 2
  • Tower Crane of Chang Li Model Number QTZ200(7020) System 3
Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
200 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ200(7020)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 1-8t

Rated Lifting Moment: 60m

Max. Lifting Load: 8t

Max. Lifting Height: 201m

Place of Origin: Henan, China (Mainland)

Brand Name: YU JIE

Model Number: QTZ200(7020) 

Certification: CE & ISO

Warranty: 12 months, 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Jib Length (M): 60

Free Height (M): 46

Max. Possible Height (M): 201

Max. Load (T): 8

Tip Load (T): 1.0

Slewing Speed (r/min): 0-0.6

Counterweight (T): 15.8

QTZ200(7020)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

QTZ200(7020)  Specification

 Tower Crane of Chang Li Model Number QTZ200(7020)

QTZ200(7020)  Pictures

 

Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

QTZ200(7020)  FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What about our tower crane's warranty?

A: Usually there is oneyear quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

 

 


Q: Is there an effective utility for estimating the required size of a crane? I’m an estimator for a mechanical contractor, and it seems we never allow enough money for crane rental. How can I effectively adjust my estimates?
well I'm not sure but need to over estimate for safety cause there are all ways mitigating forces @ play when using cranes be safe first dude you dint want to be sued for being cheap and if yo do good work word will get around
Q: What is the present status of large Boom Tower Crane?
Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
Q: What tower cranes are used on the 30 storey house?
The 30 storey building on the height of about 100 meters to 120 meters, plus 2 to 3 layers of basement, the tower crane must set the height of 110 meters to 140 meters, if the single building is less than 60 thousand square meters of building square meters, as the total number of square meters, using a two QTZ63 type tower crane is enough,
Q: How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q: About tower crane torque limiter with 4 limit switches, each play a role, thank you
Hook top point control: when the hook to the high limit, limit action, do not continue to hook!Overload control: when the weight exceeds the overload point or amplitude exceeds the maximum amplitude or the loading rate is more than 105% when the output control, prohibit the hook lifting action and prohibit car distance to allow the car to increase the amplitude, amplitude can be damped near.
Q: This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
The first (visible in the first link) is the boom angle pistons. These are mounted to the rotating section and to the boom. The second hydraulics are inside the boom arm. The boom actually has several sections that telescope (like a motorized car antenna). Each section has a hydraulic piston that pushes the section out of the end of the boom. The cable that hangs off the end is wound onto a large cable reel that is on the rotating section. This cable reel is also gear driven, but is usually just run by two standard spur gears. E-mail me with more details as to how big you want this project and I can help out more from there. Make sure your account is set up to allow e-mails.
Q: my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
Q: Military Action movie with bunch of cranes at the end?
Cranes like construction equipment or Cranes like the birds?
Q: Building a new skyscraper? Tearing down the old Mellon Arena?
Get ready for the new tower.
Q: You know those machines you pay and get like 15 seconds to operate the fricken metal hand?Can you give me some tips?
make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords