• Tower Crane of Chang Li Model Number QTZ200(7020) System 1
  • Tower Crane of Chang Li Model Number QTZ200(7020) System 2
  • Tower Crane of Chang Li Model Number QTZ200(7020) System 3
Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
200 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ200(7020)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 1-8t

Rated Lifting Moment: 60m

Max. Lifting Load: 8t

Max. Lifting Height: 201m

Place of Origin: Henan, China (Mainland)

Brand Name: YU JIE

Model Number: QTZ200(7020) 

Certification: CE & ISO

Warranty: 12 months, 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Jib Length (M): 60

Free Height (M): 46

Max. Possible Height (M): 201

Max. Load (T): 8

Tip Load (T): 1.0

Slewing Speed (r/min): 0-0.6

Counterweight (T): 15.8

QTZ200(7020)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

QTZ200(7020)  Specification

 Tower Crane of Chang Li Model Number QTZ200(7020)

QTZ200(7020)  Pictures

 

Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

QTZ200(7020)  FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What about our tower crane's warranty?

A: Usually there is oneyear quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

 

 


Q:i am doing a major research paper on the other Stephen Crane and would like to know some suggestions about a name for the title of this essay it is an English 3 assignment. The book that i read is called The Red Badge of Courage. please help!
ADL ( Anti Defamation League) is an unique gadget interior the hand of a minute minority of ZIONIST jews interior the U. S., its considerable objective sell HATE and DEFAMATION at its maximum suitable... its directives are precisely opposite of its call! No ask your self they have sided against the two writers while they uncovered the certainty of the cancerous tentacles of zionism in u.s... the two writers are actually not anti-Semitic for they did no longer convey anti-Semitic racial perspectives, to the alternative they have sided with a Semitic team properly widespread to something of the international and had u.s. First interest of their ideas.. all of us might desire to be militant to brainwashing and the defamation tries via the real enemies of u.s. , Democracy and Human rights! ----------------------------------------... respond to MR_RIEUX i'm astonished to the adequate materials(hyperlinks) adjoined to his help for the ADL , and the avalanche of element to instruct John M. Steve W. incorrect of their paper on the subject of the zionism carry interior the yank politics. i'm specific maximum folk of respondents to the question have comparable thoughts ( via ballot) : mr_rieux you the single which incorrect on your protection to the indefensible, you're instituting political prostitution and intelligence genocide, I propose you spare us the widespread venom of the zionism propaganda you're participating , you and the critics to the writers above are tainting the certainty to get a moronic immoral US president misinform his tooth and take area woth your variety in murders and destructions of civility. that's severe time to freshen up the homestead from Warmongers zionist Neocons.. Sir you're a NEOCON ZIONIST!
Q:heres a picture of one
There are a few types. Some more modern cranes jack themselves up and then back down after wards. There is a large mis-conception about tower cranes. Many people think they can handle larger loads than portable jib cranes. This is not the case. The advantage of a tower crane is its cost and ability to see. The ones that are not capable of jacking themselves up are erected and taken down by large jib cranes with many times the lifting capacity and cost.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q:What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
the lift capacity of the Crane is pretty much dictated by the type of crane it is. The largest Gantry / Bridge type is capeable of 1,500 tons.. the largest tower is 100 tons w. a 100meter turning radius. Tracked lattice boom type is 1,600 tons...........(self contained) there's one that will do 4000 tons with modifications including seperate tracks for counterweights
Q:Where are gears used on a crane?
It's more a matter of where gears MIGHT be used. 1. Gear reduction to lifting cable drum. 2. Gears to rotate the crane, or driving cable drum to extend jib. 3. If a mobile crane, gears to transmit drive to wheels/ tracks etc.
Q:If I have one week, is that enough time?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q:we have a project starting that will require a stack built 1km high in the air?How will they install this?
use a heavy lift helicopter, these are especially designed for this work
Q:My Sister gave me a Russian Lacquer box with two flying cranes on it. There is supposed to be a story behind the cranes, but I can't find it online. Does anyone know where I can find this, or happen to know what the story is?
This is an old Russian tradition of painting cranes on laquered boxes like the icon paintings. Many different towns would make these type of boxes. Russian legend claims that the city was a home to icon-painters even before the Mongol invasions. At least since the 17th century, Kholui has been a producer of lacquer boxes, plates, and other painted items that this region of Russia is famous for. After the Bolshevik Revolution, icon painting became unpopular and even dangerous. However, Kholui painters kept painting, at this time in secrecy, giving the area a kind of legitimacy in the cultural/artistic world. The style of icon painting in Kholui is particular to this town, and distinctly different from the more widely-known Palekh style of painting. The icon-painters in Kholui use a large amount of green hues, as opposed to the style of using mostly red colors, as is traditional in Palekh. The Ivanovo Oblast is home to the cities of Putchezh and Kholui. It is found in the center of the Eastern European Plain, and is part of the Central Economic Area of Russia.
Q:this wind speed refers to that height of wind speed?
Surface wind speed is greater than 6
Q:If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
this okorder

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords