Tower Crane of Chang Li Model Number QTZ315(7035)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 200 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ315(7035) Description
Feature: Tower Crane
Condition: New
Application: Buliding Construction
Rated Loading Capacity: 1T
Rated Lifting Moment: 168 t*m
Max. Lifting Load: 4t
Max. Lifting Height: 100m
Span: 42m
Place of Origin: Henan, China (Mainland)
Brand Name: YUJIE
Model Number: QTZ315(7035)
Certification: CE,ISO,IAF
Warranty: 15 months
After-sales Service Provided: Engineers available to service machinery overseas
color: as you like
QTZ315(7035) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Impeller blasting/rust protection paint
3. Potain masts designed with dismountable panels, making teansport easier and cheaper.
4. New designed mast, can be used to Internal and external climbing tower crane
5. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
QTZ315(7035) Specification
QTZ315(7035) Pictures
QTZ315(7035) FAQ
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
Q: What is main advantage for manufacturing construction machinery?
A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies providing worldwide after-sales service;
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
- Q: Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
- These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
- Q: what can lead tower crane to blank out?
- (1) tower crane has crack; (2)Brake block friction lining wear up to 50% ofRaw material thickness ; (3)Brake wheel surface wear reaches 5mm ~ 2mm (4)Spring has plastic deformation; (5)Lever system, air travelis more than about 10% of its rated trip
- Q: How about the installation and disassembly of the tower cranes?
- Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
- Q: Safety rules for tower cranes
- Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
- Q: Well I folded 100 or so cranes from cheap origami paper (red, yellow, green and blue) before I decided that I could fold 1000 cranes a reality. My dilemma is, do I keep the 100 cranes I did and fold 900 of them to fulfill my wish? Or if I discard the 100 cranes and fold 1000, will my wish be granted on the 900th crane? The reason I want to discard the 100 cranes is because it's for my wedding and the color placement of the old cranes isn't fitting at all.Yes I'm aware it's not scientific or realistic, but it's more of faith, I'm not dumb.
- Consider what you would like your 100 cranes to mean. Attach strings to your 100 cranes and then hang them in a tree etc so that the wind may carry your prayers where they need to go. Then start again to create the 1000 paper cranes you want for your wedding. PS: The making of the paper cranes involves an act of faith, not the right colour to match your wedding plans. In Japan, the crane represents peace and healing. When we consider the famous Japanese art-form of paper folding (origami) the crane comes to mind before all else. Sadako and the Thousand Paper Cranes (1977), a non-fiction children’s book written by American author Eleanor Coerr, tells the story of young Sadako Sasaki who lived in Hiroshima at the time of the atomic bombing. Sadako developed leukaemia as a consequence, and lived out the remainder of her short life in a nursing home desperately trying to create one thousand paper cranes. Supposedly, if someone could make a thousand paper cranes his/her wish would come true. Sadako wanted to live. Sadly, she only managed to fold 644 cranes. After her death, friends and family folded the remainder, and buried her with the one thousand paper birds. Today, a statue of Sadako holding an enormous golden origami crane stands in the Hiroshima Peace Park. People regularly leave paper cranes. The plaque on the statue reads “This is our cry. This is our prayer. Peace on Earth.”
- Q: I have learned how to make crane but I just can't! I've watched about 6-7 videos for it and i still don't get it!
- If that doesn't help at all , try pictures with words . Here are my two favourite sites . They have good instructions and pictures . Really simple to understand .
- Q: What are the lifting moment requirements for tower cranes?
- 1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.
- Q: i need to know:how long is the stock (extended and non-extended)how wide is the stockand how thick is the stockthanks.
- ever think of googling standart crane stock ?
- Q: What is the dumbest bird in the aviary community? Is it really the Crane?
- great question! I would love an aviary that was half open/half closed. I would love the birds to have the option at all times of choosing the protected surroundings (from weather, sounds, other animals, etc) of inside. Just as convenient would I love their ability to be outside in the fenced aviary so as to choose t heir own environment filled with trees, shrubs, plants, fountains but with enough room for me to observe and enjoy their interaction.
- Q: What are the safety devices in a tower crane?
- Answer: 1: height limit2: lifting weight limiter3: torque limiter4: travel limiter5: speed (maximum speed of force must be more than 40m/min)6: put a device (jib tower crane to move) must have7: the rotary limiter (no collector on the revolving part) must have8: car broken rope protection9: anemometer (boom root hinge point height is greater than 50m should be set)10: windproof device (rail type)11: buffer and end stop12: Rail sweeping plate (rail)13: protective cover14: derailment device15: emergency power off switch (red mushroom head)
Send your message to us
Tower Crane of Chang Li Model Number QTZ315(7035)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 200 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords