Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment



Tower crane Specifiction

Tower Crane 4 Tons to 30 Tons Building Construction Machinery and Equipment

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:Cranes can be operated by all of the following except:?
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q:A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m.?
I will try to make it very simple. First lets convert the 2355 into a mass. 2355/9.81 = 240.06 Kg Then, we need to get the mass of the soil. Density (p)= m/v m= pv m= 2084*1.81 = 3772.04 Kg Total mass= 4012.1 Kg The final step is to calculate the work done. It can be solved from two perspectives and both will lead to the same solution. Sol. 1: Since that the crane is lifting an object, then the work the crane is doing is against gravity which is calculating the gravitational potential energy gained by the bucket. GPE= mgh= 4012.1*9.81*7.56 = 2.99*10^5 Sol 2: Work done= Force*distance moved in the direction of the force The force in this case will be the weight of the bucket. Work done= (4012.1*9.81)*7.56 = 2.99*10^5
Q:Can someone explain the support cables on a tower crane?
That depends on the load the crane needs to lift. Those cables will vary from 1/2 inch to about 2 inches. The cable is composed of individual strands, woven together, with a fiber core. The core allows the strands to move, such as flattening out as they move over the pulleys. The core also carries the oil needed for lubrication. The cables are usually rated at 1/7th of their real capacity for safety reasons.
Q:what are the application of crane?
To lift and handle heavy objects. Haven't you seen giant cranes lifting big containers ( having automobiles) from docks and placing them on ships?
Q:Is their a difference between a flamingos and cranes birds?
their beaks and feather coloring
Q:is it possible to make an origami crane that can fly like paper airplane?
I think of myself greater because of the fact the paper plane sort.....going with the breeze and letting it take me the place it is going to. additionally, cranes are no longer very severe-high quality once you get too close to to them and could attempt to %. your face off in case you verify out them humorous.
Q:How do the cranes used to build tall buildings get put in place?
Large cranes are built in sections imagine like an erector set. When there is a large building to be built the crane arrives in smaller easier to manage pieces and assembled on site.
Q:Paper Crane tattoo design issues?
Paper Crane Tattoo

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range