Single Side Climbing Bracket SCB180 for Support

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 m
Supply Capability:
80000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Single Side Climbing Bracket SCB 180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are

transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors. Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and

bank vaults.The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


2. Main Features of Single Side Climbing Bracket SCB 180

Economical and safe anchoring

Stable and cost-effective for high loads

Simple and flexible planning


3. Single Side Climbing Bracket SCB 180 images

Single Side Climbing Bracket SCB180 for Support


4. Single Side Climbing Bracket SCB 180 Specifications

The M30/D20 climbing cones have been designed especially for single-sided concreting using SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect. generous bracket spacings allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.

With SCB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.


5. FAQ of Single Side Climbing Bracket SCB 180

 

1) What can we do for you? 

    .We can ensure the quality of Single Side Climbing Bracket SCB 180 panel and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the meaning of the template bearing surface elevation in the bridge specification?
Elevation indicates the height of each part of the building, which is the vertical height of a certain part of the building relative to the reference plane (zero point of the elevation). In the construction drawing there is often a small right-angled isosceles triangle, the tip of the triangle or the up or down, which is the sign of the elevation.
Q:New shear wall template support
All the components supported by the new shear wall template are cold rolled steel material, we all know that cold rolled steel material has three main features, corrosion resistance, flexibility, strong deformation characteristics; now there are a lot of manufacturers are products Square steel, square steel and cold rolled steel is two different materials, different materials made of product life and support strength is not the same.
Q:Unilateral support basement wall waterproof protective layer do not do it?
If you want to do without protective layer, you can look at the United States permanent condensate DPS + infiltration crystallization film series waterproof material. Water-based infiltration crystalline inorganic waterproof material, completely penetrate into the concrete inside, do not find leveling layer, can be sprayed directly. Do not keep, sprinkle, etc. Impermeability level can reach S 11 level or more. Completely inorganic material will not be aging. There is no delamination problem. If the repair, supporting the use of US permanent condensate RMO can.
Q:Template support did not stand good, how to remedy the lower floor?
The sinking of the local template demolition, concrete smashed, re-playing concrete, although not in line with the provisions, but the project often do so, you know
Q:Main and vice keel upgrade modification - the new building template support birth opportunity
The overall unit of light weight, easy to use the workers, but also reduce the cost. Roof plate support instead of the use of the wooden side, the number of wheel rotation is up to 300 times, excellent re-use rate. As a patented manufacturer of new products with steel instead of wood, we have been working hard to develop and improve, hoping to do our best to achieve more convenient construction materials in the construction process, making workers easier to use and easier to operate ; Make the construction process easier, more secure, shorter construction period; so that the effect is closer to the perfect; so that the construction environment becomes more beautiful, the project image has been greatly improved. It is worth mentioning that the use of steel instead of the wooden side, to protect the environment to reduce the logging of trees made a great contribution.
Q:How long does the width of the template support more than how much height the beam can not be poured at the same time?
Beam, plate at the same time pouring, pouring method should be started from one end with the "cuping method", the first pouring beam, according to the beam high-level pouring into a stepped shape, when the plate bottom position and then with the board of concrete pouring With a continuous extension of the ladder, beam concrete pouring continuous forward.
Q:400 thick concrete roof template support system need expert demonstration?
No need. Because 400mm thick is very common, the saying goes to stand the top of the jack - are now steel pipe stent, generally do not support the phenomenon can not afford
Q:What is the difference between a full-screen stent and a floor-mounted stent?
Full-scale scaffolding can be a template support frame, but the template support frame is not necessarily full of scaffolding. Such as the roof beam template support frame is full of scaffolding, but the pillar of the template support frame may not be full of scaffolding. Full-scale scaffolding can be easy to operate the platform, more for the roof beam template support
Q:Scaffolding structure template support frame type
(1) single pole support frame; 2) double pole support frame; 3) lattice pillar support frame (support frame formed by lattice column group); 4) mixed pillar support frame (mixed with single Pole, double pole, lattice column support frame).
Q:the country is allowed to use
Reinforcement limit concrete card for the construction of shear wall, so that both sides of the card slot can play the role of steel limit and the role of the template, but also control the thickness of the shear wall protective layer. There are 300mm 250mm and 180mm and other specifications.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range