Scaffolding Parts-Cold Galvanized Top Cup
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-cold galvanized top cup
Place of Origin: China (Mainland)
Brand Name: CMAX
Color: Silver, green ,blue , red ,yellow
Apply Area: All
Packaging & Delivery of Scaffolding Parts-cold galvanized top cup
Packing Detail:
1. Woven bags:25 or 20 PCS
2. Cardboard Box: 20PCS
3. Wooden cases, Bunch, Steel Pallets
4.20GP:about 23-26 tons
5.40GP: about 25 tons
Delivery Detail: In 25-45 days ( do as customer`s need)
Specifications of Scaffolding Parts-cold galvanized top cup
1.Q235Q345Q255
2.HDG, galvanized, painted
3.ISO9001:2000, EN74, BS1139, AS1576
4.OEM service
Cuplock Scaffold Cast Top Cup
Material |
Q235Q255Q345 |
Surface Treatment |
HDG,Galvanized, painted |
Net weight |
0.5kg |
Color |
Silver, red, yellow, blue, green |
Certification |
ISO9001:2008 |
Standard |
EN74, BS1139, AS1576 |
Feature |
Skidproof, Antirust, High Breaking Strength,High tenacity,easy to install,sturdy and durable |
Supply Ability |
500Tons/Month |
Shipping Port |
Qingdao( all accepted) |
Payment Terms |
T/T, 30% Deposit in advance |
Accessories |
spigot |
About us
1.Enough production lines and workers to delivery on time.
2.Main product: Scaffolding System( Kwikstage, Cuplock, Ringlock, Haki); Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks, Frame System, Scaffold Steel Tubes, Accessories, Steel / Aluminum Planks etc.
3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.
4.Our products have passed the customer`s quality test,and the factories have thequality testing instruments.
5.OEM Service
6.Rizhao is a coastal city with convenient transportation.
7.Provide good service for everyone.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
- Q: The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b) Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Cold Galvanized Top Cup
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords