Scaffolding Pipe Clamp Fitting british German Forged Type

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Scaffolding Pipe Clamp Fitting british German Forged Type


Description


1.The scaffolding coupler is always used to connect the steel pipe as scaffolding system.

2.The often used coupler is swivel coupler and righ angle coupler .

3.We can provide types of scaffolding coupler according to your requirement.

4.Couoler can fix the 48.3mm scaffolding steel pipe tightly and make the whole scaffolding system more steadily.


Feature


(1)Excellent Anti-Breaking—Cold Pressed Steel

(2)Outstanding Resistance Deformation

(3)Strong Anti-Dropping Ability



Photo

Scaffolding Pipe Clamp Fitting british German Forged Type

Parameter


MaterialQ235,345steel
Size48.3mm*48.3mm
Surface finishGalvanized
Weight1.1kg around
StandardBS1139,EN74
Package25pcs/bag,steel pallet
Manufacture
As per customer requirement
MarketAfrica, South America, the Middle East and Asia

FAQ

Q: Are you a factory or trading company?    

We are a state-owned corporation in China,dealing with various kinds of building materials.We have our holding subsidiaries.

Q: Where is your factory located? How can I visit there?    

Our factory is located all around China.

Q: Can I get some samples?    

Sample is free, customer only pay freight for the first time. 

Q: Delivery?

10-30days. (5-15 containers)



Any question,feel free to contact us.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what's the story with vince Mcmahon and the scaffolding falling on him?
Vince did want to take a break and be away from TV for a while... and this was his opportunity to. This also ended his Million Dollar Mania, but he could have just said it was over, and people wouldn't even have cared. I think this creates two new storylines: 1) Who will now take over RAW, and 2) Was the stage incident an accident, or was it done on purpose?
Q:On the high-profile model erection of fastener-type steel pipe and door scaffolding mix, combined with work and professional knowledge, not less than 2000 words of the paper
"Construction of fastener type steel pipe scaffolding safety technical specifications" pole construction measures are: "construction of fastener steel scaffold safety technical specifications" JGJ130-. 3 pole 6.3.1 The base or pad should be set at the bottom of each pole. 6.3.2 Scaffolding must be set vertical and horizontal sweeping pole. Longitudinal sweeping pole should be fixed with fast nuts at the base of the base is not greater than 200mm on the pole. The horizontal sweep bar should be fastened to the pole on the underside of the longitudinal sweep bar. 6.3.3 scaffolding pole base is not at the same height, the height of the longitudinal sweep must be extended to the lower two spans and pole fixed, height difference should not be greater than 1m. The distance from the pole shaft above the slope to the slope should not be less than 500 mm (Figure 6.3.3). 6.3.4 single and double scaffolding bottom step should not be greater than 2m. 6.3.5 single row, double row and full house scaffolding pole in addition to the top of the top step, the rest of the layers of the joints must be used to connect the fastener connection. 6.3.6 Scaffolding pole docking, lap should meet the following requirements: 1 When the pole with docking long, the pole of the buttocks should be staggered layout, two adjacent rod joints should not be set in synchronization The distance between the joints of the joints to the main node should not be greater than the distance of 1/3; 2 when the pole with a lap to take a long time, the distance between the two joints should be less than 500mm; , Lap length should not be less than 1m, and should be used not less than 2 rotation and fasteners fixed. The distance from the edge to the end of the end fastener cover shall not be less than 100 mm. 6.3.7 scaffolding pole top railings should be higher than the top of the wall 1m, should be higher than the top of the cornice 1.5m.
Q:I have decided to get two piercings, industrial/scaffold, and a tongue piercing?
The tounge piercing isnt bad if it'll be the first time you've ever had it done. It goes through very easily and then you get to spoon slushies into your mouth for a couple of days. now for the industrial. i had it done and it got extremely infected. its a problem if you have long hair as it will get caught around the balls. depending on what side you sleep on it sucks. you can barely even touch it let alone lay on it. basically if you really want to get it done ask them to do it with 2 seperate bars. make sure they still line the holes up perfectly though. after it heals put the industrial bar in, that way it can heal completely without all the pressure. GOODLUCK♥
Q:A 3.0 m long steel chain is stretched out along the top level of a horizontal scaffold at a construction site,?
I'd look at this situation this way: The picture of chain lying on scaffold at the start has the center of mass (CM) of hanging part of chain at y/2 = 1.4/2 = 0.7 m from top of scaffold. At the finish, the entire chain is hanging in air with its CM at a distance = (1.6 + 1.4)/2 = 3/2 = 1.5 m from top of scaffold. So the change in CM position during the entire downward movement equals: 1.5 - 0.7 = 0.8 m. In first picture described above, the gravitational force on the hanging chain = (32)(1.4) = 44.8 N. In last picture entire chain hangs vertically off scaffold, gravitational force = chain weight = (32)(3) = 96 N. The average weight of chain pulling downward during the chain's movement = (44.8 + 96)/2 = 70.4 N Work done by the force of gravity on chain = (70.4)(0.8) = 56 J ANS
Q:Snug or scaffold piercing?
I love and have both but I do favor my scaffold due to the fun wavy bars that are available =] lol. Hope this helps!
Q:Could my scaffold piercing be infected?
take antibiotics. when theres puss it means ts infected
Q:Should I get an industrial/scaffold piercing? How much?
Keep in mind that any piercing outside of the earlobe has a much higher rate for getting an infection. Besides that, there will be a permanent hole or scar. for the rest of your life and you'll look very funny whether you take the jewelry out or leave it in. I can't imagine you'll want to be 45 or 60 with a body piercing since that will look just plain ridiculous, but so will being 45 or 60 with a hole or scar on your body because of a piercing. Also, people view others with body jewelry as being rebellious, which I believe is the reason many of them get the jewelry in the first place. However, persons with body piercings have commented on how others view them as a bad person. Think about it before you do anything.
Q:is it soar getting your industrial/scaffold pierced?
It's Not That Painful, (Unless You Knock It) And Its A Little Bit Sore After, But After A Few Weeks, It's Fine. :)
Q:Scaffolding decoration and what is the meaning of their primary and secondary relationship is what? Urgent, I hope you big brother to help! The
At present, the color steel sandwich panel market is relatively broad but to note that the current fire rating has been asked to increase the sandwich can no longer use the foam, the need to use rock wool and other refractory materials sandwich steel for waterproof, The advantages of more prominent, so has been widely used, the current only because of the new fire regulations, need to consider the core also changed to the corresponding fire rating.
Q:Can anyone give me a site to find a picture of Hester Prynne standing on a scaffold holding her baby?
Go to Google, type in Scarlet Letter 1995 it will take you to the site of the Demi Moore version of the story and there are several stills taken from the movie - one of which is Hester on the scaffold with Pearl.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range