Scaffolding Accessories Tie Rod

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications:

Place of origin: Hebei , China      Material: Steel

Packing detail: in bulk                   Delivery detail: 30days

Dimension: minimum diameter, maximum diameter, screw pitch or thread pitch

Surface: HDG

Material: #45 or Q235.
1) 15/17MM steel tie rod.
2) Lenght can be 3m or 6M or 1M or as your demand.
3) Plain or galvanized.

Descriptions:

1. 15/17MM steel tie rod.
2. Lenght can be 3m or 6M or 1M or as your demand.
3. Plain color or galvanized.

4. Competitive price.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.
Q:whats the symbolic significance of the scaffold, the rosebush, and pearl in the book THE SCARLET LETTER?
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q:Have you heard of meat on a scaffold?
Sounds weird. When eaten I wonder how this experiment would affect the human body. It just might turn normal people into Liberals. If that's the case then I don't want anything to do with it.
Q:How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q:Scaffold Piercing Aftercare?
i love my scaffold/business piercing i do not imagine it hurts yet some human beings say it does Coast round £25/30 - any more desirable than its a rip off. this is a soreness to heal and takes a lengthy time period! each and every time I knocked mine it swelled and went humorous. extremely stressful. Had it executed 3 cases, 1st time it grew out, second time I only took it out. third time I were given it pierced on my different ear and at the same time as it became healed I replaced it to a versatile bar and for the reason that then this is been suitable. desire I helped.
Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q:21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q:Can I recycle steel scaffolding tubes by encasing them in concrete to make a stronger beam.?
You can, but I can think of two reasons why it might be unwise. Firstly, reinforcing bars are ribbed to provide a key between the concrete and the steel, whereas scaffolding bars are much smoother. This leads me to believe that scaffolding bars, weight for weight, wouldn't be as effective as reinforcement bars and you wouldn't have as much reinforcing action as you think. In extremis, you could end up with an under-reinforced concrete beam which will be brittle - reinforced concrete is usually deliberately slightly over-reinforced so that the behaviour close to failure is ductile, as it gives you time to run away. Secondly, scaffolding bars are hollow and reinforcement bars are solid. In reinforced concrete, the alkalinity of the cement paste helps to protect the reinforcement from corrosion - the reason for specifying a minimum cover - but the inside of your scaffolding bars would not benefit from this and so I'd worry about the risk of shortened life due to rusting from the inner face. At least when reinforcement bars rust they tends to spall the concrete cover off, which you see happening.
Q:Scaffolding installation and precautions?
The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range