scaffolding steel pipe support props nuts

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Props,Formwork
Thread:
Machine tap
surface treatment:
galvanized
painted:
powerd coated
diameter:
10,12,14mm
thickness:
2.0mm-3.5mm
Packaging Detail:
Bag or Pallets
Delivery Detail:
Meet customer needs

Packaging & Delivery

Packaging Detail:Loose, in bundle, plastic film, or as your request. shippment in container
Delivery Detail:20-40days

Specifications

scaffolding prop nut
1.Ductile iron,casted or machine tap thread
2.Pitch:10.0 or 6.35mm
3.Pin: Dia.10.12, 14 or 16mm

scaffolding prop nut

Very Good Casted Manufacturing Ability for All types of casted Nuts

1. Material: Ductile Iron

2. Nut Size: Dia 60 mm, Pin : dia.12,14 or 16 mm

3. Pitch: 6.0mm or 6.35mm

4. Nut weight: different weights

5. Surface: Electro galvanized

6. Thread: Casted thread or machine tap thread

7. Type: all types of Wing nuts, jack nuts,prop nut

8.Quality Control for Large amount production to Ensure  Good Quality Products

9. Packing: Bags or pallets.


Adjustable

Outer pipe

inner pipe

Theoretical

20 ft Container

length(m)

tube(mm)

tube(mm)

Weight(kgs)

can load(pcs/bulk)

0.8-1.4

48×1.6×765

40×1.8×835

4.74

3500

1.6-3.0

48×1.6×1600

40×1.8×1600

7.57

2200

2.0-3.5

48×1.6×1710

40×1.8×2000

8.45

2000

2.2-4.0

48×1.6×2000

40×1.8×2200

9.32

1750

1.6-2.9

56×1.6×1510

48×1.8×1600

8.95

2200

1.8-3.1

56×1.6×1510

48×1.8×1800

9.36

2100

2.0-3.6

56×1.6×1750

48×1.8×2000

10.29

2000

2.2-4.0

56×1.6×2010

48×1.8×2200

11.26

1750

1.4-2.7

60×2.0×1340

48×2.0×1400

9.45

2300

2.0-3.5

60×2.0×1540

48×2.0×2000

11.38

2000

2.2-4.0

60×2.0×1840

48×2.0×2200

12.7

1750

3.0-5.5

60×2.0×2540

48×2.0×3000

16.51

1500(40ft/in bulk)


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:How to make a slide using scaffolding?
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Crossbar HG-30 3001.67HG-60 6002.82HG-90 9003.97HG-120 12005.12HG-150 15006.28
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:Could someone please tell me a very simple scaffold on writing commentary?
To know about College and university! log on to alumne.net/
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
via stretcher you advise gauge, ultimate? i've got in no way heard it suggested as a stretcher before, yet that would desire to easily be only an area slang differing style venture. besides, i think of gauges are suited or perhaps lovable in the event that they are smaller. bigger ones are too off-putting and that i might in no way do it myself. i like the belief of an commercial piercing nevertheless. i admire those. i myself % to get one sometime quickly. i've got needed one for a mutually as. i does no longer probably individually get a gauge, yet whilst that's what you sense works via all skill get one. i think of the commercial piercing is adequate on that is very own. i do no longer think of it should be accompanied via a gauge. besides, it sounds to be such as you needed the commercial piercing first, so which you may desire to start with that.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:opinions on scaffolding piercing and how to hide it from school :)?
While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
Q:Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range