Scaffold formwork cast clamps lock with wedge pin

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
500 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

WITH BV CERTIFICATION FOR ALL OUR CASTING PRODUCTS.

 

 

 

Features:

 

1. It used to entighten the connection of each two formwork panels, and increase the strength of formwork

 

2. Filling area up to 100mm

 

3. Adjust size: 94mm to 225mm

 

4. Material: ductile or Q235

 

5. Weight: 4.25KG/PC

 

6. Finish: Elec.galvanized (Yellow or white)

 

 

We are manufacturer for many years from Cangzhou city, all our casting products are exported to middle east, east and south Asia, and Europe market, BV certification make our products win high reputation from our customers.

 

We can supply most of the casting or forged parts & accessories for scaffolding,ring-lock system, cup-lock system and formwork, please feel free to contact with us for whatever you are interested.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I Just got an industrial piercing or Scaffold and im worried it might get infected?
Keeping it cleanis the only thing you really can do. Insteas of contact solution you could use a non iodized sea salt soak (1/8 teaspoon of sea salt to 8 oz of warm water). But you are going to want to stop spinning it. Spinning it could rip your fistula and prolong the healing time of the piercing
Q:what's the meaning of scaffold?
I don't think that it's a term for a specific type of business (like a pyramid scheme), but it's simply a business that sells/produces scaffolding. Scaffolding is a temporary framework used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes (termed tubes in Britain), although it can be made out of other materials. Bamboo is still used frequently in Asia.
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
Q:In Virtual Villagers 3, my builders won't build the scaffolding for the statue! Help!?
Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
Q:Industrial/Scaffolding piercing swollen and sore?
Your body has to adjusting and trying to heal. It'll be sore and swollen for a bit. Try not to jerk it around anything. If you don't see the swelling starting to go down and/or the soreness increases I'd have a doctor check it out.
Q:when do i change my scaffold piercing?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q:How old do you have to be to have your hip peirced and scaffolding?
In all honestly, I'd try to talk your friend out of getting that hip piercing. Surface piercings, especially one there, Will reject. I don't mean to sound negative, but have her put two dots where she would want the piercing, and move around as she does daily, she will see how much that area moves. The more movement = the less likely it will heal. They could reject after a month, they could reject after two years. It really depends. No matter how well the piercer, or how well she takes care of it, it will reject. I went to the best piercers in state to get my surface work (sternum, nape) done. I also took care of it by doing sea salt soaks once or twice a day. When that didn't work I used the LITHA (leave it the hell alone) method.The sternum rejected in six months, where the nape was doing great up until that two year mark. Then it started rejecting. If you want to see what a rejecting piercing looks like feel free to send me an Email, I have some pics of my sternum piercing early on - when it started rejecting, then a day or two before I took it out. It honestly looked horrible that few days before I took it out. The piercing place I go to won't do surface piercings on minors, so you have to be 18 for that one in Minnesota. For the scaffold/industrial, you have to be 16 with parental consent and 18 without in the United States.
Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
The span, the rod step is easy to calculate, I have done the program in general 4.4.8 meters
Q:What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range