• Rubber Grade Zinc Oxide System 1
  • Rubber Grade Zinc Oxide System 2
  • Rubber Grade Zinc Oxide System 3
Rubber Grade Zinc Oxide

Rubber Grade Zinc Oxide

Ref Price:
get latest price
Loading Port:
Tianjin Port
Payment Terms:
TT or L/C
Min Order Qty:
20MT m.t.
Supply Capability:
6000 MT Per Month m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Production method Of Rubber Grade Indirect Zinc Oxide:

Rubber grade indirect zinc oxide is used in series of products such as steel radial tyre, bias tyre, conveyer belt, rubber tube and tape, rubber shoes, emulsion glove productions etc. Its properties of product can meet country, the Ministry of Chemical Industry and American ASTM standard requirements.

 

 

Application Of Zinc Oxide :

High activity, even granularity, it’s possessed of high dispersing ability, has the good promotion curing function,  improve the cross-link china density of rubber, enable to make the rubber vulcanization more completely.

 

It can improve the viscidity of rubber compound, and the adhesive force of materials such as the rubber,steel wire and code fabric, etc.

 

 

It can make good dynamic performance, make the rubber products with little deformation, low heat generation,high anti-abrasion. Enable to have good anti-oxide property.

 

 

Packing and storage Of Zinc Oxide :

This product is packed with plastic-lined and plastic-coated woven bags, 25kg per bag.

This product should be keep from breakage, moisture, pollution and contact with acid.

 

Product quality standards: GB/T 3185-92

ITEM

Quality

01

02

03

04

Zinc oxide(counted by dried substances )/%     ≥

99.7

99.5

99.4

98

Metal ( Zn )/ %                            ≤

None

None

None

None

Lead oxide( Pb )/ %                        ≤

0.037

0.05

0.14

0.18

Cupric oxide(Cu)/%                      ≤

0.0002

0.0004

0.0007

/

Manganese Oxide(Mn) /%                   ≤

0.0001

0.0001

0.0003

/

Hydrochloric acid insoluble /%               ≤

0.006

0.008

0.05

0.1

Burning decrement /%                   ≤

0.2

0.2

0.2

0.3

Water dissoluble /%                        ≤

0.10

0.10

0.15

0.3

105℃volatile substances /%                 ≤

0.3

0.4

0.5

0.6

Sieve Residue/ %                          ≤

0.10

0.15

0.20

0.3

 

packaged with pallet

 

 

 

 

equipment of Zinc Oxide

 

Q: The words on the paint are the first to paint or paint the paint first
Are the first words in the paint it
Q: Enamel paint
Enamel okorder
Q: Can plant dyes be glazed? How to combine plant dyes and ceramics?
Should not, the organic pigments of plants will be decomposed by heat ...
Q: gold spray paint
It depends on the kind of spray paint used. Most brands can be removed with some thinner. There are different kinds of thinner so you may need to try several before you find the one that will work with whatever is on your tiles. You can sometimes buy a combination thinner that contains various solvents just to be sure it will work. Usually acetone thinner or lacquer thinner will do the trick.
Q: Plastic paint and metal paint the difference? I use metal paint spray plastic will play from the skin Will you master how is it? Thank you!
Spray paint will have a lot of formaldehyde volatile to the atmosphere
Q: Heroes what is the paint coating with barium sulfate it and ink with barium sulfate and plastic barium sulfate difference?
There is no significant difference between the classification of barium sulfate is mainly their own physical properties to determine some of the parameters.
Q: shine like car paint but how?
I use oil based high gloss paints. First of all I sand the surface using three different sand papers, starting with the most coarse and working my way to the finest. I wipe it clean with methylated spirits because it dries instantly and there is no water to make the timber swell or affect the paint in any way. I apply a good quality undercoat, usually oil based. If you can find a ridge filler undercoat, it will help even out flaws. If you have large pits or dents you might want to fill with an appropriate filler. Leave for a minimum of 12 hours and sand with a fine grade paper. Wipe off with metho again. Feel with your fingers - if you can feel bumps you will be able to see them, so you may need to sand a little more. For the paint: use the best quality brush you can afford. Ask for advice in the paint store if you are unsure. Load your brush with a small amount of paint. If it's a small item you should be able to do a stroke the full length in one go. If not, you will need to reload mid stroke. Apply the paint, reload and pick up where you left off. When one length is complete, go back and lay off in the opposite direction, that is to brush the paint all in the same direction. Work quickly. When you have completed your first coat, leave to dry for a minimum of 12 hours and repeat the sand and paint process again. I usually do three coats of oil based paint, but you may not need to. If I'm doing a clear finish on a timber project, I will rub boiled linseed oil into the clear finish with a very, very fine steel wool. It gives a lovely soft finish. There are also two pack products available which can be sprayed on and give a very high gloss finish, but I have never used those.
Q: what is milk paint is it more exspensive then normal paint? does it have a strong odor?
Milk okorder I have used it on some historic restoration projects. I probably would use a more modern product unless there was a real reason that milk paint was required.
Q: Okay so im a nooby and i have some questions painting my bedroom. I got enough paint to paint multiple coats of paint but i dont know how. When i paint my first coat, do I have to let the paint completely dry before i put the second coat on? And can i use a paint rack that has dried paint left sitting on it?
So you are a first time painter. When you paint your first coat. Before you begin any project using paint cover everything that it will ruin from drips from your brush or roller. Wipe up any drips as fast as it falls because it can be more difficult after it has a chance to dry. Always wait a few hours after the first coat to insure a better contact and not to streak the paint. Never allow any paint to dry in the pan that you used. Take it outside and rinse it out with your water hose. Always be cautious about spilling any drips and take time to clean it up. Take your time, the best part is not trying to race along too fast and that makes waste. Hast makes waste. Enjoy painting and getting the lines straight. Use a damp cloth to wipe off smears as you go along. If the room has carpeting make sure you use a plastic drop cloth before ever beginning your paint project. Some people can whis through a paint job and make a total disaster. Use a good amount of common sense and you will do just what you want. Always clean your brushes and rollers while they are still easily to remove the paint with plenty of water and little soap outside where it won't matter as much the mess. Then clean up all the messes before you can say you are done. Then it is ready for you use the next time in great condition. If you don't it will force you to buy brand new tools to paint the next time.
Q: What is the difference between a polymer compound and a polymer?
A polymer, also called a polymer molecule or macromolecule, has a high relative molecular weight and its structure consists of multiple repeating units, and these repeating units are actually or conceptually derived from the corresponding small molecules.
River, is a large-scale deep processing enterprise for nearly 30 years, with an annual processing production of more than 50,000 tons of various kinds of special titanium white powder, including various kinds of food additives titanium dioxide, a series of cosmetic titanium dioxide, chemical fiber titanium dioxide (solid and liquid) and chemical pure titanium dioxide and other products. All these products are researched and developed by our company independently.

1. Manufacturer Overview

Location Shanghai, China
Year Established 1983
Annual Output Value Above US$100 Million
Main Markets North America; South America; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Central America; South Asia
Company Certifications REACH, ROSH,SVHC 53 Items Certificate ,SGS,CIQ,ISO9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Shanghai Port
Export Percentage 51% - 60%
No.of Employees in Trade Department Above 100 People
Language Spoken: English; Chinese;Spainsh; Farsi;French;German
b) Factory Information
Factory Size: Above 30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered; Buyer Label Offered
Product Price Range Rock Bottom Price With Best Quality

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords