pvc flooring for child to use in room pvc flooring for child to use in room

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 m²
Supply Capability:
10000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Specifications:

Material

PVC virgin material

Thickness

2mm, 3mm, 8mm

Wear layer

0.5mm

Width

1.5m

Pattern

Customized design

MOQ

1 sqm

2.Certifications: CE,ISO14001, ISO9001,CTI.

3.Features:
1) PVC material,eco-friendly,safe,soft,comfortable

2) Super wear resistance,durable,long service time
3) Customized design, personalized cartoons

4) An-slip,injury prevention

5)Shock proof and noise absorption 
6) Easy installation and cleaning

7) Play function and educational.

8) Waterproof,moistureproof,anti-bacterial,fire resistance.

4.Application:

Kindergarten,school, parent-child center, children study/sleeping rooms,children activity/ library/ health recovery and training rooms,house corridors, halls and other grounds for children living and studying.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When tiling a wall AND the floor, how close to the floor should I get the wall tile?
Floor And Wall Tiling
Q:What is the floor of Warcraft?
Select the unit A key, and then the left mouse button on the ground, the unit will move to your point to the way to encounter on the way to attack the hostile units it will automatically attack
Q:Floor tile problem on Sims 2?
Normally if your on the 2nd floor of your house you have to put up the walls first but it's been awhile since I played that game so I might be wrong. When I say the walls though I mean for the outer part of the house. Did you try clicking on the options so that you can make the walls disappear so you can see what your doing better? Could be something is in the way possibly or it could be that your trying to build your house a certain way. If your doing it where your having like say a terrace on the 2nd floor than you need to put a crap load of pillars under at the beginning than put your floor on the 2nd level. After you did that you can delete all the extra pillars and everything should work where you don't have any gaps in your floor. Hope that helps.
Q:Buy floor to see what the general data
Buy the floor to see what the general data, thank you friends.
Q:How do you clean your Pergo flooring?
Fro a fast touchup we use regular white vinegar mixed with water. like maybe a cup to a couple gallons of warm water. damp mop with a sponge type mop. we also use hard floor cleaner spray from menards. About $5 a bottle lasts quiote a while. spray a bit and mop it up...repeat. easy to use
Q:cleaning a parquet floor..?
Most of your parquet flooring is only a 3/8 ths and 1/2 thick and is a laminated product and can t be sanded down a lot. It would depend also if the flooring is a wax or a urethane finish.. You may have to call in a flooring person to get a look at it and determine exectly what you need to do.. It may be as simple as re waxing it.. Any questions you can e mail me through my avatar.. GL
Q:Home decoration with what floor is better?
Yes nice, too detailed, thank you oh
Q:Floor levelling?
as pumken said there are floor levelling cements, you mix them to the consistency of, like jello pudding and you just pour it on the floor. it's considered to be self levelling, but may need a little help the problem is it's expensive (27$ a bag) and to raise part of a floor 2 is going to cost, and cost large, it might be easier and cheaper to remove and repair the hump area only break-up and remove the offending area, do a patch job on it and finish it the levelling cement, so it will match the existing or remaining area at least regular cement/concrete mix is only 6 $ a bag
Q:Is the house first or the first floor?
Oh, my mother is right. Generally in the pipeline and the installation of the line, the interior decoration sequence, should be uphold the truth from top to bottom. Can be so explained, the operation of the paint is the most dirty, if the first to do the ground, the finished product insist on the closure of the Mongolian Feng Feng phthalate care is critical, or is likely to cause secondary rework. Home ceiling is relatively simple, but the process of chip, or will cause pollution to the wall. So, avoid reversing their interrelationships. (This opportunity, you can give my father a lesson, (* ^ __ ^ *))
Q:Solid wood floor decoration pay attention to what
Ground cement leveling layer to ensure that there is enough dryness, to ensure that the moisture content of 8% or less to lay the keel, so as to avoid pavement damp, if it is wood keel, brush pest and paint a paint, low or perennial in the rainy Wet season, then the keel can also add a layer of wool floor or linoleum, so as not to deformation of the floor moisture, solid wood floor foot feel the most comfortable, but the pavement must be careful, but also pay attention to maintenance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range