pvc doors windows

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

    • 1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      3. Tech Data Shown Below
      Acoustical insulation
      36 dB

      K-value of window
      1.80 w/ m2. K

      Wind resistance
      5000 Pa

      Air permeability
      0.1 m 3 /h. M

      Watertightness
      500 Pa

      4. Payment and Shipping Terms

      A, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS Guangzhou.

      B, Payment terms: Bank transfer/ T/T, based on quotation sheet or contract.

      5. Scope of Service

      A, Free technique consulting, project design and estimates before sales.

      B, Commitment of at least three years quality warranty.

      China supplier of pvc doors windows

      China supplier of pvc doors windows

      China supplier of pvc doors windows

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you have the order to install the floor and window? What order is it right?
Usually the first to do masonry, the installation of doors and windows frame, in the plaster, and then do floor, the final external wall paint
Q:Is not all the doors and windows are located in the middle of the wall?
To my Google space to see it, maybe you will find the answer, what questions you can message, the space has my contact, because the beginning of finishing, so a lot of technical articles are not the whole go up, but will soon complete ,
Q:How to count the amount of window works
1, the drawings will have windows and doors table, according to the plan and the number of doors and windows window number of doors and windows. Sometimes, the number of doors and windows table is not correct. 2, check the doors and windows of the door and window size calculation door and window frame of the external dimensions in square meters. 3, each side minus 15mm on each side, for example: 1200 * 1000 window calculation: (1200-15 * 2) * (1000-15 * 2) =; 900 * 2400 of the door calculation: (900-15 * 2) * (2400-15 * 1) =
Q:Aluminum doors and windows production, installation need to pay attention to what? What are the technical requirements?
In the production process is the most important attention to the size of the problem, if the size is not right, then that is the most troublesome! Installation is to adjust the bits are good, others too tight or too loose doors and windows!
Q:Do you want to install a seal tape for steel windows
Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
Q:Red TV background wall, white wall, juvenile window frame with what color curtains nice, living room, bedroom, son room
The whole should be a red line, specifically to see what you like a tone, 1. Can be red ash, is similar to brown. 2. Pink tone, 3. Purple purple. 4. All the furnishings of the room reflect the taste of the owner, it is recommended not to use a similar cartoon or other incompatible decoration.
Q:Four-wheel positioning adjustment screw how to install
Four wheel positioning adjustment screw how to install == best in the four wheel positioning - look at the data after adjustment
Q:Will the steel doors and windows can be a single layer of glass can not change the case of doors and windows with a layer of glass Plus a layer of sound insulation is not much better?
Can be sure to tell you can. Single-layer glass and double-layer glass and the pressure is not the same, for some of the glass can be combined with a layer of glass can be, and the previous glass can also be used, between the two layers of glass open
Q:Paving mosaic construction process
Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.
Q:The settlement area of the doors and windows is calculated by what size
They may live on the C-1 actual size, but should be expressed as: 1675x1185. Just 1185 looks like it is a bit small.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range