Windows and Doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PVC sliding doors /Glass sliding windows
pvc casement sliding doors specification:
Certificate | ISO9001 : 2000 |
Door style | European style; American style,Africian style; Asian style |
Opening style | casement/swing |
Specification (size, color,etc.) | Different countries have different demands for it. |
profile | 2.5mm thickness, Conch brand pvc, 1.2mm inforcement steel |
Glass | Single, double, tripled glass; double glass with grille. |
Low-E glass, Tempered glass, floated glass, reflective glass, etc. | |
Thickness: 4mm, 5mm,6mm,8mm; Space: 6mm,9mm,12mm,16mm, etc. | |
Blinds available | auminum or pvc blinds inside or outside |
Seal | Rubber sealing strip, black or grey color |
Hardware | High quality Chinese hardware,Chugn, Kin Long (Multi-point lock and handle) , G-U or ROTO also can be used |
Mosquito meshes | Metal and nylon material |
- Q: Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
- The key is the material and the construction process, the sand is too thin or mud is too large, lime ripening is not good. Construction technology is not in place, mortar with the amount of lime is too large, plastering the wall before the end of the water is not uniform, plastering rubbing ram is not in place, lime cream when the surface is not uneven thickness, no second survival and so will cause cracking , So you have to analyze the reasons for the actual situation according to the scene.
- Q: Plastic window GB8814-88 what it means
- GB8814-88 is the implementation of standards
- Q: Bathroom, washbasin (door) face paste mosaic, what is the material is better plate? What is the construction process? More
- Washing table (cabinet door) face mosaic, had to use woodworking board to do the base layer because it is necessary to always open, if not open, then available cement pressure board hanging plaster stickers mosaic.
- Q: Is not all the doors and windows are located in the middle of the wall?
- To my Google space to see it, maybe you will find the answer, what questions you can message, the space has my contact, because the beginning of finishing, so a lot of technical articles are not the whole go up, but will soon complete ,
- Q: EPS line is good or GRC line is good? Villa facade, doors and windows frame.
- If it is a private villa that I am responsible to tell you GRC better than the EPS on the grounds that: GRC is made of high-strength cement, glass fiber, steel, sand and sand can be the same life and housing, and EPS is a grid , The interface agent, made of foam, which is a bubble, the outside is a cement slurry, whether GRC or EPS and these two materials are installed in the outdoors to increase the overall aesthetic effect of the house, no doubt will be sunny night, summer Strong winter frost, with a long time wind and rain in the EPS line inside the bubble and a thin layer of mud outside the mud can imagine what effect; so GRC better than EPS; hope my explanation can make you satisfied; Thank you!
- Q: What are the problems with the installation of windows?
- Wall plaster and hole whether there is a gap?
- Q: Do you want to install a seal tape for steel windows
- Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
- Q: I think the window window frame has always been white ugly ah, what other colors?
- It is the previous style, and now the doors and windows, including the screen style is also a lot of materials are also many, but the price is more expensive
- Q: What are the welding principles for steel doors and windows? Whether the vertical or vertical vertical welding, corner and doors and windows are used in what way to welding. More
- Google check ,,, comfort. The The The
- Q: Rough leveling how to use?
- Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
Send your message to us
Windows and Doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords