PVC windows and doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
PVC sliding doors /Glass sliding windows
Product Description
Profile | Profile:3 chambers,top quality profile brand; Thickness:2.0mm; Color:white or any color as per the customers' requests; Series:70 series; Surface treatment: power coating,lamination,co-extrusion,embossed |
Reinforcement | Thickness:1.0mm,1.2mm,1.5mm,2.0mm; Surface treatment:galvanized steel reinforcement |
Dimension | common dimensions: 400*600,500*600,600*600,900*900,900*1200,1000*1000,1000*1200,1000*1500, 1000*1800,1200*900,1200*1000,1200*1200,1200*1500,1200*1800 available in any size as per the customers' requests |
Glass | 4mm,5mm,6 common or tempered single glass |
Hardware | sealing :PVC & EPDM rubber seal; domestic high quality crescent lock; with mosquito net, with or without grids |
Features | with cheap price good apperance, heat insulation, sound insulation, water tightness. easy to install, clean and maintain. |
Price Terms | FOB(shanghai/ningbo),CFR or CIF |
Payment Terms | T/T 30% as the deposit and balance before shipment,or L/C at sight |
Minimum Order | 1 set |
- Q:Broken bridge aluminum screens how to go up
- The first step: the yarn box, air slot, bottom assembled, and then use six screws to twist it to make it a square box. The second step: the screen on the installation site, pay attention to the left and right air duct and the door window frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm lower, put the left and right with the clip, Doors and windows so that they can not move. The third step: with electric drill with 3.2mm drill bit in the door window frame inside the puncture. Step 4: According to the need in the left and right air trough and below the bottom of the corresponding place marked with 6 to 14 eyes, and then screw the screw is installed. Installation Notes: 1, the yarn box to be vertical fixed, broken bridge aluminum doors and windows at both ends to occupy the upper and lower border prevail. 2, up and down the slide with the location of the parallel box fixed, to avoid skid inside and outside skew. 3, the base position to close the pull beam, placed in the sliding window swoop to close and then draw lines and fixed, so as not to fixed position too far or too far. 4, if the parts of the fixed nail is too long, will prevent the normal sliding sliding window slick, broken bridge aluminum doors and windows can be self-nail with a shears cut short can be.
- Q:What is the gap between the window and the wall?
- If the mouth is installed, the expansion joints are 15 to 20 mm, and the net mouth is installed with a 10 to 15 mm expansion joint
- Q:Plastering and doors and windows installed in the order
- Sure to first install the door in plastering
- Q:What are the problems with the installation of windows?
- Wall plaster and hole whether there is a gap?
- Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
- Glass installed a piece of plastic is the last thing else or else trouble again
- Q:Broken bridge doors and windows series 60 what meaning
- Simply put that is, the general profile company is only the thickness of the box
- Q:Living room bedroom 1 meter yellow bedroom 2 ground are beige. Q: What are the colors of the doors and windows frame? More
- Wallpaper is European vertical stripes, the choice of white, furniture is white under the premise of the formation of white European style, can also use the original wood color
- Q:Doors and windows outside the door and the door and window hole size difference if only to the size of the hole how to install into the box size of the external problem added: in the end is minus a few centimeters ah? More
- In general, the size of the door and window openings larger than the size of the window frame, in the processing window frame when the size of the hole according to the size of the hole, the relationship between the two: window frame size = hole size - about 1 cm from top to bottom, for example, If the hole size is 2000 * 1800, then the window frame size is 1980 * 1780.
- Q:Plastic window around the gap with cement plug or foam plug?
- For the gap between the box and the wall of the filler and surface treatment requirements in the "Building Decoration Construction Quality Acceptance Specification (GB-2001)" Article 5.4.7 states: "Plastic door frame and the gap between the wall should be used Closed hole elastic material filled full, the surface should be sealed with sealant sealant should be bonded firmly, the surface should be smooth and smooth, no cracks. 2. According to "plastic doors and windows installation and acceptance procedures (JGJ103-96)" Article 4.2.11.2 provides: insulation, sound insulation window, the hole between the inside and the window frame should be used to fill the cement mortar smooth; when the plaster , The sheet should be used to temporarily remove the plaster layer and the window frame, the thickness should be 5mm, plaster surface should be beyond the window frame, the thickness of the fan does not affect the opening is limited (see " Node graph). To be outside the plaster layer hardened, should remove the sheet, and the caulking paste into the plaster layer and window frame gap. Insulation, sound insulation requirements of the higher project, between the inside of the hole and the window frame should also be used to seal the seal. 3. Also in the "plastic doors and windows installation and acceptance procedures (JGJ103-96)" Article 4.2.10 of the provisions of the filler more detailed: window frame and the hole between the expansion joints should be used in closed cavity foam, Foam polystyrene and other elastic materials layered packing, packing should not be too tight. For insulation, insulation requirements of the higher level of the project should be the use of the corresponding insulation, sound insulation material stuffing.
- Q:Do the doors and windows first do the inside and outside the wall plaster?
- According to our years of experience in doing doors and windows, is to measure the window, see the size of the hole whether there is any discrepancy, if there is an uneven wall needs plaster repair, such as windows installed, the sewn up on it
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
PVC windows and doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords