PVC windows and doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
PVC sliding doors /Glass sliding windows
Product Description
Profile | Profile:3 chambers,top quality profile brand; Thickness:2.0mm; Color:white or any color as per the customers' requests; Series:70 series; Surface treatment: power coating,lamination,co-extrusion,embossed |
Reinforcement | Thickness:1.0mm,1.2mm,1.5mm,2.0mm; Surface treatment:galvanized steel reinforcement |
Dimension | common dimensions: 400*600,500*600,600*600,900*900,900*1200,1000*1000,1000*1200,1000*1500, 1000*1800,1200*900,1200*1000,1200*1200,1200*1500,1200*1800 available in any size as per the customers' requests |
Glass | 4mm,5mm,6 common or tempered single glass |
Hardware | sealing :PVC & EPDM rubber seal; domestic high quality crescent lock; with mosquito net, with or without grids |
Features | with cheap price good apperance, heat insulation, sound insulation, water tightness. easy to install, clean and maintain. |
Price Terms | FOB(shanghai/ningbo),CFR or CIF |
Payment Terms | T/T 30% as the deposit and balance before shipment,or L/C at sight |
Minimum Order | 1 set |
- Q: Doors and windows with a nail installed in the cement brick, is it necessary to have to nail on the cement brick, or as long as there are a few pieces in the cement brick, the other can be nailed to the red brick? Do you only need to nail on the concrete? More
- Now some local standards and acceptance specifications have been banned with a nail fixed window frame, whether it is concrete or brick wall. Drill holes should be used for expansion screws.
- Q: What are the installation of the box method?
- A method of installing plastic doors and windows. So that the door frame and the wall completely out of doors and windows of the installation quality is easy to get control, reduce the plastic doors and windows due to thermal expansion and contraction caused by the expansion and contraction.
- Q: Do the doors and windows first do the inside and outside the wall plaster?
- According to our years of experience in doing doors and windows, is to measure the window, see the size of the hole whether there is any discrepancy, if there is an uneven wall needs plaster repair, such as windows installed, the sewn up on it
- Q: Sliding doors and windows to prevent shedding measures which
- In fact, when you usually use the push and pull the general will not fall off, is the usual use of the method.
- Q: I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
- Box installed after filling the expansion agent, there is no gap can not fight, with the latter loaded a glass of money relationship is not. Glass is made of glass
- Q: Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
- To see how your project is like, it should not be affected, if there is a cross before the doors and windows in the curtain wall, pay attention to the edge of the problem, leakage problems.
- Q: Living in high-rise window how to install screens
- The box, the air slot, the bottom of the assembly is good, and then use six screws to twist it into a square box. The screen on the installation site, pay attention to the left and right wind and the door frame frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm below, put the left and right with the clip to live, so that can not move. With drill with 3.2mm drill bit in the door window frame inside the puncture. According to the need in the left and right air groove and below the bottom of the corresponding place marked 6 to 14 eyes, and then screw the screw is installed.
- Q: How to count the amount of window works
- Long * wide = area (hole area), according to a different way to open up like a good!
- Q: We have a new brush on the walls and floors of the house, can we live on the balcony of the floor where the floor tile is not painted? We have a balcony on the door can be closed Thank you big
- Recommended or wait for 15 days. Get some tea at home (the kind of cheap) fell to the ground and furniture
- Q: The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
- In the measurement, the hole in the same horizontal line should be measured on a horizontal line to measure the height of the hole, and the width of the hole in the same vertical line is measured, whichever is the minimum (the minimum value of which is negligible, Doors and windows through the repair hole alone) as the same specifications of the doors and windows of the design guidelines for the external walls of the wall is not clear water or cement mortar exterior decoration, should be the construction axis and the horizontal line as the benchmark window and the horizontal axis, to measure the doors and windows The minimum width and height of the hole, and should be based on building outside the row of rulers to determine the final size of the doors and windows processing. The determination of the gap between the construction hole and the doors and windows, in excluding the architectural design error, by measuring the minimum horizontal height and minimum vertical width of the hole as the design criteria for the size of the doors and windows, do not have to consider the size of the building openings in Table 1 allowable deviation To consider the table 2 and Table 3 doors and windows when the deviation occurs when the measurement occurs when the positive deviation of the probability that the measurement of the size of the phenomenon is too large, doors and windows under the effect of temperature expansion and decorative surface layer thickness and other factors, Should be determined in accordance with Table 4, the gap between the doors and windows theoretical gap.
Send your message to us
PVC windows and doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords