China supplier of pvc doors windows

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

    • 1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      3. Tech Data Shown Below
      Acoustical insulation
      36 dB

      K-value of window
      1.80 w/ m2. K

      Wind resistance
      5000 Pa

      Air permeability
      0.1 m 3 /h. M

      Watertightness
      500 Pa

      4. Payment and Shipping Terms

      A, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS Guangzhou.

      B, Payment terms: Bank transfer/ T/T, based on quotation sheet or contract.

      5. Scope of Service

      A, Free technique consulting, project design and estimates before sales.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Plastic window is not also called plastic doors and windows, how to explain is a kind
Is a kind of plastic doors and windows without pure meaning.
Q:Can ordinary sliding windows be installed with stealth screens?
Can be installed, but if there is a screen runway, then it is recommended to install the film is economical and practical
Q:Who knows how to change the color of the aluminum frame
Go to the building materials market to buy paint film is estimated to solve your problem
Q:EPS line is good or GRC line is good? Villa facade, doors and windows frame.
I am doing GRC from the time that GRC is the time from the test of the EPS light but time long material stability do not know how
Q:What color should window frame should be?
Door frame can choose white or shallow champagne broken bridge aluminum, with more fresh. Broken bridge aluminum color is also very rich, any color can choose.
Q:Would you like to be able to paste mosaic?
Most of the southern region can paste mosaic, the problem is not big!
Q:Can plastic windows replace fire windows?
Can not, plastic window The main chemical composition is PVC, so also called PVC profiles. It is easy to change at high temperatures! If the fire is blocked by plastic windows! But the temperature is greater than the capacity of steel windows will cause the plastic window melting and deformation! What do you know about it?
Q:What is the size of the doors and windows of the building? Like M1021 or C1520 height is from the amount of the above? What about the above beams?
M1021 said the rear frame set aside the size of the doors and windows hole 1000 * 2100, the installation of doors and windows, the hole and the door frame between the frame there is a thickness of about 1cm gray strip, when used in the wall plaster embedded window frame The The actual door frame size is 980 * 2090 doors and windows height does not include the beam height. Therefore, with or without beams, does not affect the size of doors and windows. Look at the map to understand
Q:Plastic window around the gap with cement plug or foam plug?
For the gap between the box and the wall of the filler and surface treatment requirements in the "Building Decoration Construction Quality Acceptance Specification (GB-2001)" Article 5.4.7 states: "Plastic door frame and the gap between the wall should be used Closed hole elastic material filled full, the surface should be sealed with sealant sealant should be bonded firmly, the surface should be smooth and smooth, no cracks. 2. According to "plastic doors and windows installation and acceptance procedures (JGJ103-96)" Article 4.2.11.2 provides: insulation, sound insulation window, the hole between the inside and the window frame should be used to fill the cement mortar smooth; when the plaster , The sheet should be used to temporarily remove the plaster layer and the window frame, the thickness should be 5mm, plaster surface should be beyond the window frame, the thickness of the fan does not affect the opening is limited (see " Node graph). To be outside the plaster layer hardened, should remove the sheet, and the caulking paste into the plaster layer and window frame gap. Insulation, sound insulation requirements of the higher project, between the inside of the hole and the window frame should also be used to seal the seal. 3. Also in the "plastic doors and windows installation and acceptance procedures (JGJ103-96)" Article 4.2.10 of the provisions of the filler more detailed: window frame and the hole between the expansion joints should be used in closed cavity foam, Foam polystyrene and other elastic materials layered packing, packing should not be too tight. For insulation, insulation requirements of the higher level of the project should be the use of the corresponding insulation, sound insulation material stuffing.
Q:Broken bridge aluminum screens how to go up
The first step: the yarn box, air slot, bottom assembled, and then use six screws to twist it to make it a square box. The second step: the screen on the installation site, pay attention to the left and right air duct and the door window frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm lower, put the left and right with the clip, Doors and windows so that they can not move. The third step: with electric drill with 3.2mm drill bit in the door window frame inside the puncture. Step 4: According to the need in the left and right air trough and below the bottom of the corresponding place marked with 6 to 14 eyes, and then screw the screw is installed. Installation Notes: 1, the yarn box to be vertical fixed, broken bridge aluminum doors and windows at both ends to occupy the upper and lower border prevail. 2, up and down the slide with the location of the parallel box fixed, to avoid skid inside and outside skew. 3, the base position to close the pull beam, placed in the sliding window swoop to close and then draw lines and fixed, so as not to fixed position too far or too far. 4, if the parts of the fixed nail is too long, will prevent the normal sliding sliding window slick, broken bridge aluminum doors and windows can be self-nail with a shears cut short can be.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range