Glass sliding windows

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • PVC sliding doors /Glass sliding windows

  • VC(vinyl, plastic) material, 60mm, 80mm series

    A. Color: Mainly white and Green, other color is also acceptable.

    B. Size: As for your need

    C. Glass: Single glass, Insulated glass, Low-e glass, Argon glass, Tempered glass

    D. Hardware: Chinese top brand

    E. Packing: Standard Export packing

    F. Function:

      1. Good appearance

      2. Can give you more space

      3. Good Air Infiltration and Water Resistance

      4. Sun resistance and Durable

      5. Easy Install and Easy Maintain

    Long-lasting durability, energy-saving, sound-proof

    Certified quality by national and international institutions.

      1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      China supplier of pvc doors windows

      China supplier of pvc doors windows

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can ordinary sliding windows be installed with stealth screens?
There is no problem with the technology, can be installed; the problem is to be installed in the window outside, that is, the top of a window outside the top, after the end of the window can not be moved, the sealing effect is no problem, but the biggest drawback is paint When the glass is not convenient, the inside of a window can not be completely applied to; you can choose "Lu Cheng" brand can be disassembled cleaning, or with the flat; 1 will be the yarn box, air slot, bottom assembled, and then with six Screw the screw to twist it into a square box. 2 will be on the installation of the screen window, pay attention to the left and right wind groove and the door window frame to the left and right symmetry, bottom position from the door frame 3 border to be about 5cm lower, put the left and right with the clip to live, so that can not move. 4 with drill with 3.2mm drill bit in the door window frame inside the puncture. 5 according to the need in the left and right air groove and below the bottom of the corresponding place marked with 6 to 14 eyes, and then screw the screw is installed. Note that the yarn box to be vertical fixed, both ends of the upper and lower border to prevail. The upper and lower slide rails are fixed in parallel with the position of the yarn box to avoid skew inside and outside the slide. The base position should be close to the pull beam, placed in the sliding window to close and then draw lines and fixed, so as not to fixed position too far or too far. If the parts of the fixed nail is too long, will prevent the normal sliding sliding window slick, can be self-pin nails can be cut with a claw cut.
Q:Lead alloy doors and windows of the joints how waterproof
Is generally playing waterproof glue, because the doors and windows interface must exist, the waterproof glue to play all right
Q:Aluminum alloy window frame is installed after all around to play foaming agent?
Yes. This is the building energy efficiency regulations, and hidden acceptance also have video data.
Q:Plastic steel window frame and the gap between the walls shall not be filled with cement mortar, should be filled with elastic material filled with what kind of elastic material is better
It is now popular with polyurethane foam glue
Q:Do window frames be flush with walls or on wall centerlines?
Can be, in the construction of the general requirements are installed in the wall of the center line; but their own post-installation (such as plus double windows), can be flush with the wall. Door and window cover refers to the vertical and horizontal sides of the doors and windows in the vertical and horizontal openings, can be formed outside the wall can also be formed with the façade flush with the external walls, both vertical and horizontal to meet the wall and smooth, so the quality requirements are high. This is like a window in the window of a formal cover, people used to call the door and window sets.
Q:Can plastic windows replace fire windows?
Can not, plastic window The main chemical composition is PVC, so also called PVC profiles. It is easy to change at high temperatures! If the fire is blocked by plastic windows! But the temperature is greater than the capacity of steel windows will cause the plastic window melting and deformation! What do you know about it?
Q:What is the window frame section
Section is cross-section, take a 6M aluminum alloy material, the two incision is a cross-section
Q:What are the problems with the installation of windows?
Wall plaster and hole whether there is a gap?
Q:Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
Q:What is the horizontal line? How do I install windows and doors on a horizontal line?
Horizontal line; in all rooms, the same height to find a horizontal line, before the use of horizontal tube to find points, and now with the level, infrared, when the doors and windows, doors and windows on both sides of the height parallel to the horizontal line, for example, 2 meters high door Down to the level of 1 meter, then both sides should have done 1 meter, which is the horizontal line installation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range