Good Quality PVC Door Frame Line
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.
We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.
We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.
Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.
- Q:Sliding doors and windows to prevent shedding measures which
- (No less than two), no lower door of the door should be added nail horizontal pull to prevent the deformation in the transport and installation process; Second, the door window frame (the door frame) Or complete sets of doors and windows) should be designed according to the level of elevation and plane position in the process of building the wall; third, in the masonry wall installation of doors and windows (or sets of doors and windows), the nails should be fixed in the puzzle Bricks, each side of the fixed point should be no less than two, the spacing should not be greater than 1 2 m; Fourth, when the first wall after the installation of doors and windows (or sets of doors and windows), should be reserved in the door and window openings At the same time, leaving the door window frame (door and window frame, the lower end of the mouth at both ends of the mouth out of the gap) in the door frame adjustment in place after the closure gap. When the conditions are limited, the door frames can not stay in the head, should take reliable measures to the doors and windows frame fixed in the wall of wood bricks to prevent the construction or use of the process of security incidents; Fifth, when the door frame side of the need to set When the face plate, the door and window frame should protrude the wall, the protruding thickness should be equal to the thickness of the plaster layer, six, cold area door and window frame (or sets of doors and windows) and the gap between the external walls of the masonry, material.
- Q:Plastering and doors and windows installed in the order
- Before plastering, you should (at least) install the doors and windows in place so that the mason can paint the walls (holes) around the doors and windows at the same time. This is the basic step in the construction.
- Q:Doors and windows should be used to set aside the hole to install, do not use the edge of the installation side of the mouth or the first installation of the construction method What is the meaning, which can explain in detail
- Doors and windows should be used to set aside the hole to install: refers to the first wall when the doors and windows to set aside, to the late installation; side installation side of the mouth or the first installation of the mouth: refers to the wall in the process of putting windows and doors
- Q:Plastic window is not also called plastic doors and windows, how to explain is a kind
- Is a kind of plastic doors and windows without pure meaning.
- Q:The installation method of color steel activity room
- What kind of structure to look at the drawings to say
- Q:Do you have the order to install the floor and window? What order is it right?
- This is not the absolute order of the two, mainly to see their own preferences it
- Q:Do the doors and windows installed in the hole before the installation of metal sub-frame, and then install the main frame, the main frame and sub-frame between the cracks to how to deal with? More
- The use of foam caulking agent is also called styrofoam, plus cleaning agent.
- Q:Living room bedroom 1 meter yellow bedroom 2 ground are beige. Q: What are the colors of the doors and windows frame? More
- With a light color with the comparison, such as made of white.
- Q:What is the scale of the doors and windows? Please thank you very much
- Doors and windows of the scale, you can understand the door to install your doors and windows than the actual difference between the size of the doors and windows
- Q:Do the doors and windows first do the inside and outside the wall plaster?
- Sure to do the inside and outside the wall plaster, and only plaster over, in order to determine the size of the window, so as to customize the doors and windows, do not forget to stay at the door when the retaining angle.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Good Quality PVC Door Frame Line
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products