Good Quality PVC Door Frame Line

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Aluminum door frames and walls must be left between the joints?
This problem can be small or small. In principle, is to leave the gap, if the level of vertical diagonal no problem, then the door and window frame contact with the wall to play a little bit of blowing agent on the line, the contract is relatively small, do not worry too much.
Q:Aluminum alloy window frame is installed after all around to play foaming agent?
Yes. This is the building energy efficiency regulations, and hidden acceptance also have video data.
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Doors and windows of the installation methods are plug and mouth two "plug" installation of this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:The installation method of color steel activity room
Caigang activity board room and building almost the same, will be around and the wall foundation leveling, the best use of reinforced concrete, more solid; and then column, with the beam will be linked to the skeleton, the partition, the outer wall and the door window frame; Followed by laying the floor, and then put a layer of upward, and then on the roof and roof panels; the final installation of doors and windows, pull vertical support. There is sanitary ware, ah, hardware and the like. In fact, this is the light steel structure, and the heavy steel structure plant is very similar to the color of steel activities room hidden project is in the construction process, after the completion of a process, will be covered by the next process, all can not be completed after the inspection site , Do the room decoration, "hidden project" is the key, if the "hidden project" is not done, the surface decoration was beautiful, but also in vain. "Hidden project" can be divided into water installation, electrical installation and moisture, water and other projects. Each of which can not be ignored, if any link is a problem, may bring serious economic losses, and even harm to personal safety. Waterproof construction of the construction process and material identification, to avoid unnecessary economic losses and injuries.
Q:How to count the amount of window works
Long * wide = area (hole area), according to a different way to open up like a good!
Q:How to clean the latex paint after the door frame and the window?
Scrub with a thinner can remove the wooden doors and windows on the latex paint spots, that is, people are not very good skin, it is recommended to bring gloves, thinner and more red taste, but volatile quickly. Will not be left, and the wooden door window is made of wood paint will add thinner, so it will not have an impact on the original paint
Q:Do the doors and windows first do the inside and outside the wall plaster?
Do not know what you said plaster is? You are building a house (external wall) or do decoration (interior) two different. Build a house (external wall) is a good first door window frame and then plaster. It will be used to make the water. And then install the door, door sets, window sets.
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
Only for the living room and bedroom (kitchen and toilet can be synchronized) grass-roots treatment --- Chong Qiang --- wall head putty --- floor tiles - installation door frame, bag mouth --- grinding to find --- 2 times putty , Baseboard installation --- last latex paint. Note that as long as do not let the tiles polluted the walls of the final finish on it. Want to save points to scratch the end of the sub-package door. Intermediate processes are generally not so rigorous.
Q:How to do the water around the window wall
I see your picture, I see the external walls of water leakage, the windows are generally in the window below the water, your upper and sides, as well as the left side of the window so far, there are leaking, should be the wall leakage, I suggest you Buy waterproof treasure (liquid) on the outside brush 2 - 3 times, the window on the four sides made waterproof plastic, can only be the case
Q:Doors and windows outside the door and door and window hole size difference if only to the size of the hole how to install into the box outside the size
In general, the size of the door and window openings larger than the size of the window frame, in the processing window frame when the size of the hole according to the size of the hole, the relationship between the two: window frame size = hole size - about 1 cm from top to bottom, for example, If the hole size is 2000 * 1800, then the window frame size is 1980 * 1780.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range