Aluminium windows and doors

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • PVC sliding doors /Glass sliding windows

pvc casement sliding doors specification:

Certificate

ISO9001 : 2000

Door style

European style; American style,Africian style; Asian style

Opening style

casement/swing

Specification

(size, color,etc.)

Different countries have different demands for it.

profile

2.5mm thickness, Conch brand pvc, 1.2mm inforcement steel

Glass

Single, double, tripled glass; double glass with grille.

Low-E glass, Tempered glass, floated glass, reflective glass, etc.

Thickness: 4mm, 5mm,6mm,8mm; Space: 6mm,9mm,12mm,16mm, etc.

Blinds availableauminum or pvc blinds inside or outside

Seal

Rubber sealing strip, black or grey color

Hardware

High quality Chinese hardware,Chugn, Kin Long (Multi-point lock and handle) ,

G-U or ROTO also can be used

Mosquito meshes

Metal and nylon material

      China supplier of pvc doors windows

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Aluminum doors and windows production, installation need to pay attention to what? What are the technical requirements?
In the process of making the technical staff to do every standard process, because the aluminum alloy doors and windows waterproof performance itself is not waterproof profiles, it must be used for each connection point waterproof film, glass must be sealed with glass glue inside and outside
Q:I would like to ask, the interior wall plaster door window frame a few centimeters ah, the external wall insulation board wiping the surface of the door window frame a few centimeters ah?
Pressure a few mm, the pressure is not more coordination
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Box installed after filling the expansion agent, there is no gap can not fight, with the latter loaded a glass of money relationship is not. Glass is made of glass
Q:Plastic steel window frame and the gap between the walls shall not be filled with cement mortar, should be filled with elastic material filled with what kind of elastic material is better
Polyurethane foam caulking is the convenience of the doors and windows in the installation process, if it is to consider the problem of water leakage, you can refer to the following process operation: 1. Window and wall connection should first check the embedded parts and window connector Quantity, location is correct, in the absence of caulking should check the window frame and the wall between the shaking and micro-moving phenomenon. If you find the above phenomenon, the embedded parts to be reinforced, and around the window frame with foam polyurethane to fill, to stay 6 × 6 seam with silicone embedded real. 2. Grass-roots plastering to strictly check the location and size of the hole to prevent the installation of the window frame and then adjust the overall impact of grass-roots level, grass-roots construction must be strictly stratified construction. 3. In the surrounding block before the need to clean up the debris, and rinse, caulking with caulking tools will be embedded into the mortar, and layered embedded, embedded real, to enhance the anti-seepage effect. 4. The windowsill to make a certain out of the water, in order to quickly discharge the rain, the window frame around the outside are sealed with a sealant, the sill outside the lower mouth must be made of notch drip tank to prevent climbing.
Q:What are the key points for the production and installation of wooden doors and windows?
2, the first fixed hinge side, to be close can not have a gap, up and down and left and right vertical, with screws or gun nails fixed; 3, door sets and the door frame pressure can not exceed 0.3mm, the line in the saw 45 ° angle when the corner to be straight, if burr, sandpaper sanding after the fight; 4, after installing the door, check whether the two sides are equal, the door is too large or too small , Some to open and close the page must be the first amount of accurate size, before processing, assembly page when the screw to play straight, lock to be firmly flush; 5, good product protection.
Q:Engineering materials inside the windows and doors hidden when to do? Is done in the main construction, or do the decoration when the doors and windows to do the decoration?
In the installation of doors and windows to do.
Q:How do I use a board wall?
The structure of the wall, the ground, the roof clean up leveling → wall release line → with the board → configuration cementing material → install the fixed card → install the door and window box → install the partition board mechanical and electrical installation, 1. Wall line: according to the design requirements, along the ground, wall, top pop-out wall center line and width line, the width should be consistent with the wall thickness, clear line, the location should be accurate. 2. Assembly sequence: when there are door openings, should be from the door to the mouth on both sides in turn; when no holes, should be installed from one end to the other end. 3. Plates: plate partition wall panels should be installed before the variety, size, color, etc. sorting matching. 4. Installation of wall partitions; plate partition installation splicing should meet the design and product structure requirements. Installation methods are mainly rigid connection and flexible connection. Sheet metal wall accessories should be used for anti-corrosion treatment. Sheet metal stitching should be consistent with fire Claim.
Q:Broken bridge doors and windows series 60 what meaning
Broken bridge insulation doors and windows 60 series refers to the aluminum alloy frame section height is 60mm broken bridge (wear or perfusion) doors and windows system.
Q:Doors and windows should be used to set aside the hole to install, not to use side of the installation side of the mouth or the first installation of the construction method What is the meaning, which can explain in detail
2 can only be the installation method is different from the actual measurement of the end of the gray processing of the installation of the expansion screw installation ~ no plaster is the size of the doors and windows is smaller than the hole 20MM has a fixed connection
Q:Plastic window GB8814-88 what it means
GB8814-88 is the implementation of standards

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range