• Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water System 1
  • Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water System 2
  • Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water System 3
  • Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water System 4
  • Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water System 5
Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water

Piscina De Geomembrana HDPE Geomembrane Roll Waterproof Membrane for Reserve Water

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Hdpe Geomembrane Roll Waterproof Membrane for Reserve Water

Product Introduction

Classified by Material

1. HDPE Geomembrane

2. LDPE Geomembrane

3. LLDPE Geomembrane

Function: Waterproof

Application:

Water conservancy projects

Landfill treatment projects

Mineral waterproofing

Agricultural waterproofing

Our Service

1.On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2. Strictly in accordance with the ISO9001-2008 international quality system standard,we monitor and manage the whole process throughout production,quality testing,and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer’s responsibility or irresistible natural disasters),we have refunding,replacement,and repair services.We will respond to customers’ feedbacks on quality issues within 24 hours.

After-sales service

1.In order to provide customers with comprehensive technical support,we will provide technical and other related information upon request in a timely manner.
2.In required,we will appoint specialized technicians to the construction site to give technical trainings to construction people,and offer technical guidance throughout the whole construction process.
3.For damage due to shipment and delivery,after we receive the complaint,we will check the issure through provided pictures and videos.If our responsibility is confirmed,we wil offer free replacement.
4.When the construction is completed,as your request,our technical staff may participate in the final acceptance.

FAQ:

Q: What kind of payments does jenor support?
A: T/T, L/C, Cash are accepted.
Q: Do you charge for the samples? 
A: Accordeing to our company policy, the samples are free, we only charge the freight fee. And we will return the freight fee during the next order. 
Q: Can you produce according to customers' design? 
A: Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q: Do you have other products?
A: Yes, please check the pictures:

 

 


Q: How to use geosynthetics impervious device?
1. Set pressure. Press the set button "back" and the button ">" after powering on the device. Press the button “+”and“--”, then set pressure. After that press the button "back" to save it. After setting the lower limit value, press the set button to exit. 2. Clear the time setting. Redo the test and continue pressing the "--" button. The time value will be reset to 0 after 10 seconds. Don't press the button during the working time. 3. Check the time. Press the "--" button. The time value accurate to seconds will be shown on the screen. After 30 seconds, pressure value will be shown on the screen again. 4. Adjust to zero. If the pressure setting can't return to zero when the device is powered on without being applied pressure, you can press the reset button once. If the device is under pressure, release the pressure before pressing the button. 5. Open water injection cover plate. Add pure water until the water tank is full. Apply pressure and open pressure regulating valve to let water flow to chassis of high pressure cabin until the water begins to overflow. 6. Put the sample on the net plane of water collectormanifold smoothly. Let the excess water drain away to ensure that there are no bubbles in sample clamping device. Close the perforated plate and fix the sample evenly.
Q: Which is better for ceramic film and organic film ?
Personally think that the ceramic membrane and ceramic membrane is an inorganic oxide sintering and into, and organic film is organic and ceramic membrane can be use in the high temperature, strong acid and alkali and organic solvents, the high cost of ceramic membrane, the use of long life. Organic film unit area.
Q: What are the considerations for geomembrane installations in areas with high seismic activity?
When installing geomembranes in areas with high seismic activity, several considerations need to be taken into account. Firstly, the geomembrane material should be selected based on its ability to withstand seismic forces and potential ground movements. High-quality, flexible geomembranes that can accommodate ground deformations are typically recommended. Secondly, the design and installation of the geomembrane system should include appropriate anchoring and attachment methods to ensure that the geomembrane remains in place during seismic events. This may involve using additional fastening techniques such as anchor trenches, concrete collars, or ballasting to secure the geomembrane. Thirdly, the subgrade preparation and compaction should be done meticulously to provide a stable base for the geomembrane. Proper compaction techniques and reinforcement measures, such as geotextiles or geogrids, can enhance the stability of the subgrade and reduce the potential for differential settlement or slope failure during seismic activity. Lastly, regular inspections and monitoring of the geomembrane system should be conducted to identify any signs of damage or displacement that could compromise its integrity. This can help ensure timely repairs or reinforcement to maintain the effectiveness of the geomembrane in high seismic areas. Overall, the considerations for geomembrane installations in areas with high seismic activity revolve around material selection, anchoring methods, subgrade preparation, and ongoing monitoring to ensure the long-term performance and stability of the geomembrane system.
Q: How to stick mobile phone film?
1. Clean the screen with BG cleaning cloth (or fiber soft cloth, glasses cloth) thoroughly. It is better to clean the screen indoors in a neat condition without air flow to reduce the influence of dust. If there is dust on the screen, bubbles will stay between the membrane and the screen which means the failure of sticking membrane. Membrane will become useless when there is dust between it and the screen which damages the silica gel layer of packaging film. 2. Wipe off the stubborn?dirt with BG dedusting paster. If there is stubborn?dirt remaining on the screen, clean the screen with dry cleaning cloth. Wet cloth should not be used. Dedusting paster can stick the dust. So it can be used to clean the screen. Stick dedusting paster back to the original backing paper after using it. Then the paster is recycled. 3. Check the membrane. Take the membrane out of the package. Do not tear off the release liner directly. Put it on the screen of the cellphone, check if the membrane is suitable. Make clear of the place to stick membrane. This will help in later steps. 4. Tear off the first release liner partly. Pay attention to not touch the part of protective membrane exposed with your finger. Each cellphone film is composed of three layers. The first and the last are release liners to protect the protective membrane sandwiched between them.
Q: What is the construction method of the geotechnical membrane?
The construction method: To lay it in the range of measurement. To lay the composite geotechnical membrane before the first required to lay a good sand cushion on the roadbed, laying the width of the design requirements set. When laying, do not allow the laying of folds, as far as possible to tighten. After the pavement, the U type nails or bamboo nails is used to fix. When laying composite geotechnical membrane, the surface of the sand layer is smooth, no hard protrusion, and timely fill sand cover, avoid direct exposure to the sun for a long time. When the composite earthwork film is laid, the length of the transverse lap and the longitudinal lap can meet the design requirements. After the composite geotechnical membrane is rolled out, the filling material is filled up in time, and after the soil is covered with light compaction mechanical compaction, only when the thickness of the overburden layer is larger than 0.6m, the soil can be compacted by heavy compaction machine. Composite geotechnical membrane according to the design requirements can be divided into two types of longitudinal force and lateral force, the laying of composite soil before the film to understand the design intent, strictly according to the design requirements of the laying.
Q: What are the advantages of using geomembranes in mining tailings storage facilities?
There are several advantages of using geomembranes in mining tailings storage facilities. Firstly, geomembranes act as a barrier, preventing the seepage of potentially harmful substances into the surrounding environment. This helps to protect water sources and ecosystems from contamination. Additionally, geomembranes provide stability and prevent the erosion of tailings, reducing the risk of dam failure and subsequent disasters. They also allow for efficient management of water resources by controlling the flow and retention of water within the storage facility. Overall, the use of geomembranes in mining tailings storage facilities improves environmental protection, safety, and water management practices.
Q: How amny watts is electric heating film?
Power density of electric heating film itself can be customized when being produced, according to the different situation. Electric heating film is generally 30 cm wide, 50cm wide, 80 cm wide, 100cm wide. Electrothermal?film of different specifications can set different power on membrane body per kilometer. The most common electric heating film on market is 220w\ square meters in density. If electrothermal membrane is used for floor heating, you should refer to heating load needed by different areas calculated by HVAC designer according to the building energy saving standards. That is, the amount of power per square kilometer. Strict calculation should refer to the geographical location of the building, the use of buildings, retaining structures (doors and windows, etc.), the height of the building and direction it faces
Q: How to deal with oil slick on fish tank?
Oil slick processing methods: 1. Using the oil slick processor to make the oil slick into the filter, and then using the filtering?cotton in the filter to adsorb, at last decomposing bacteria by nitrobacterium. 2.Collect oil slick in the cup slowly and then dump it. 3. Use oil-absorbing sheet to absorb, put an oil-absorbing sheet at the opposite corner(oil-slick aggregated area) of water outlet to absorb oil slick. 4. Install trumpet funnel commingler to absorb oil slick, mix it with water, and it will be decomposed through absorption by filtering?cotton. 5. pump?up the planted aquarium at night after lights off 6. Remove contamination in the filter.
Q: Geomembrane anti-corrosion?
Of course, anti-composite filament geotextile applied more

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords