Luffing Tower Crane TCD 4021 Max Load 8 Ton

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of our Tower Crane

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Max. lifting capacity

t

6

Working range

m

3-56

Lifting Height

Independent

40.2

Adhered

151.2

Lifting speed

Double magnification

m/min

80/40

Quadruple magnification

38/19

Slewing speed

r/min

0.637

Trolleying speed

m/min

44/22

Climbing speed

0.4

Min. stable descending speed

<7< span="">

Overall dimensions

Foundation frame

m

8×8

Overall height

Independent

50.892

Adhered

160.892

Jib end to the swiveling center

56.17

Balance tip to swiveling center

12.39

Total weight

Structure weight

Independent

t

40.49

Adhered

80.87

counterweight

18.34

Total motor capacity

kW

41.52

Allowed operating temperature

C

-20-+40

Power supply parameters

50Hz

-380V±10%

 

 Luffing Tower Crane TCD 4021 Max Load 8 TonLuffing Tower Crane TCD 4021 Max Load 8 Ton

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Emergency treatment of interrupted electricity during lifting of tower crane
The rotating gear shall be immediately inserted into the screw or wood, while the power supply shall be checked rapidly to remove the trouble.
Q:Burj Khalifa: How was the Crane Removed?
They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
Q:does it really take a crane to build a crane?
Plenty of cranes are built on the shop floor and lifted in place....so no it doesn't take a crane to build a crane. There are cranes that need another crane and that is the the ones used in the center of new skyscrapers where they build a hoist on top of the building to add to the length of the main crane. So maybe that is the kind he is talking about
Q:What is the scrap standard of tower crane hook?
The hook shall be scrapped at any time in the following circumstances:Crackle;The wear of the dangerous section is 10% of the original size;The opening ratio is increased by 10% than the original size;The twist of the hook is over 10 degrees;The dangerous section of the hook or the neck of the hook produces plastic deformation;The hook thread is corroded;When the hook bushing is worn at 50% of the original size, the bushing shall be replaced;The mandrel shall be replaced when the hook mandrel is worn at 5% of the original size.
Q:Do you need any qualifications to legally operate a crane in a construction site?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:What is The Decemberists song, The Crane's Wife, about?
I found this on wikipedia. The Crane Wife is an old Japanese tale. While there are many variations of the tale, a common version is that a poor man finds an injured crane on his doorstep (or outside with an arrow in it), takes it in and nurses it back to health. After he releases the crane, a woman appears at his doorstep with whom he falls in love and marries. Because they need money, his wife offers to weave wondrous clothes out of silk that they can sell at the market, but only if he agrees never to watch her making them. They begin to sell them and live a comfortable life, but he soon makes her weave them more and more. Oblivious to his wife's diminishing health, his greed increases. He eventually peeks in to see what she is doing to make the silk she weaves so desirable. He is shocked to discover that at the loom is a crane plucking feathers from her own body and weaving them into the loom. The crane, seeing him, flies away and never returns.
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:Why do tower cranes need to be fabricated?
Cement prefab, are generally large components, especially bridges more, including buildings, these components of large size weight, super wide is the transportation, these components must be used crane, crane can meet the needs of the heavy transport of goods.
Q:Does anyone which direction (N,S,E,W) a construction worker will leave a crane facing at the end of the day?
not really they pretty much wanna just get home 2 their families

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range