Luffing Tower Crane of TCD420 with 25 Ton Max Load

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TCD420 Description

Feature: Tower Crane          

Condition: New

Application: urban construction  

Rated Loading Capacity: 25T

Rated Lifting Moment: 260MT    

Max. Lifting Load: 25T

Max. Lifting Height: 167M        

Span: 50M

Model Number: TCD420

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate

Colour: Orange/ Yellow

After-sales Service Provided: Overseas third-party support available


TCD420 Features

Free height: 50m        

Max.height: 167m

Tower head height: 8m   

jib length: 50m         

Max.load: 25t

power supply: 380V/50Hz or according to clients need

 

TCD420 Specification

Luffing Tower Crane of TCD420 with 25 Ton Max Load


TCD420 Pictures


Luffing Tower Crane of TCD420 with 25 Ton Max Load

Luffing Tower Crane of TCD420 with 25 Ton Max Load


TCD420 FAQ

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.

 

Q: What kind of steel used for tower crane?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory inChina.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Factories and machinery are factors of production known as capital resources.?
A they are known as capital resources because they can be used to generate more wealth and they last for a long time.
Q:What are the five major cost components of the project cost?
The cost of the project is divided into two parts: direct and indirect. The direct cost consists of labor, material, mechanical and other direct costs. Their composition is as follows: labor cost refers to the budget quota, engaged in construction personnel wages, bonuses, wages, surcharges, and wages of the Jin, labor protection fees.
Q:Running machinery too fast?
Q1 === If you double the frequency, this means that you are doubling the number of times that the cylinder goes up, hits it's highest point, turns around and comes back down again in a second. You must be doubling the distance the piston travels. The time is one second, so effectively you are doubling the speed. Q2 === Jerk in this sense is one of those wonderful descriptive words that works in the real world, but is hard to put into a formula. I wonder if you have to do that. Certainly the force increases because the turn around time is much smaller when the frequency is doubled. That means time in this formula F = m*(vf - vi)/t is much smaller and that makes the force larger. Q3 == So machinery must break down because the force on moving the piston up and down has become much larger.
Q:Characterize Pete Bancini with regards to the theme of Machinery.?
Bancini worked on the rail road for a long time he sees things in the world like a machine.
Q:What is the rental tax rate for machinery and equipment in construction?
In fact, this is not a big problem, if you are learning the master budget, these problems should be understood, if you want to know the day these machines down to how much money, about 400 yuan an hour, eight hours a day, it is 3200 yuan.
Q:What kind of car engineering does that belong to? Is it traffic or machinery?
It's engineering. It's definitely not transportation. I'm from north. Our school is specialized in military science. It's the direction of tanks. What's more, it's made by car. Probably so.
Q:Describe the ways in which bacterial machinery can be utilized to replicate mammalian genome?
The bacteria would have to acquire mammalian DNA; the easiest way is to have it absorb the DNA into a plasmid (known as recombinant DNA); this can be induced by heat shock treatment after mixing the DNA with bacteria. This has been done with the genes for producing the enzyme, Insulin, in humans, and E. Coli bacteria (however, this insulin structure lacks certain sugars and does not function properly). Once the DNA is in a bacterial plasmid, the bacteria have ribosomes that can generate the proteins.
Q:Who can introduce the famous domestic machinery enterprises?!
In fact, machinery and related are good, mechanical professional look at your professional wide range of steps, the most important personal interests, as well as job opportunities
Q:Outdoor Recreation Disabled Machinery?
hi there S O S, in a clearing close to your car made from bright clothing or logs around 5 feet in height, a signal mirror,or flash light, SOS is dot,dot dot dash dash dash dot dot dot. a smokey fire to direct overhead rescue, to your position. good luck.
Q:Do you know about WWI machinery ?
Hiram Maxim invented the first true machine gun and offered it to his native country, the US. The War Department Procurement Office said, No, them boys will shoot too many bullets! Who'll pay for them? and turned it down. Actually, the Procurement Officers had all been offered lucrative jobs at Colt's Manufacturing, just like now. Hiram took his gun to England, who did buy a license to make the gun under the Vickers name, but it was the Germans who really saw the advantages of Maxim's gun. They learned to lay in crossing fields of fire so that each gun protected the guns on either side of it. This was a murderous advantage to defending positions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range