Loader High Cost Performance
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Loader High Cost Performance
Product Details
Basic Info.
Model NO.:SUNION GNHC75
Type:Skid Steer Loader
Walking Mode:Wheeled
Load and Unload Method:Front Discharge
Certification:CE, ISO9001: 2000
Condition:New
Operating Weight:3.5t
Export Markets:South America, Southeast Asia, Africa, Mid East, Eastern Asia
Additional Info.
Trademark:SUNION
Packing:in Bulk or in Container
Standard:SGS
Origin:China
HS Code:3111968887
Production Capacity:100 Sets/Year
Product Description
SUNION GNHC75 skid Steer Loader
Brand: SUNION
Model: GNHC75
Type: Wheel Loader
Condition: New
Standard: Excallent
Packing: In bulk or in container
Port: Shanghai
Delivery Time: Within 1 month
Item | GNHC75 |
Specifications | |
Rated Load (kg) | 1050 |
Tipping load (kg) | 2100 |
Bucket capacity (m3) | 0.55-0.6 |
Operationg weight (kg) | 3500 |
Travel speed (km/h) | 12 |
Hydraulic pump flow (L/min) | 75 |
Fuel tank capacity (L) | 90 |
Tyre model | 12/16.5NHS |
Overall Size (mm) | 3560×1900×2050 |
Dimensions | |
Height at maximum extension (mm) | 4070 |
The maximum pin shaft height (mm) | 3150 |
Width with bucket (mm) | 1900 |
Wheelbase (mm) | 1500 |
Axles base (mm) | 1185 |
ground clearance (mm) | 260 |
Flip angle | 40° |
Dumping height (mm) | 2450 |
Approach angle | 26° |
Departure angle | 20° |
Engine | |
Model | Xinchai498 |
Rated power | 75hp/2500rpm |
Displacement (L) | 3.3 |
- Q:First, I'll put the deck list for everyone. Spells: 36Kazandu Blademaster x 4Ondu Cleric x 4Halimar Excavator x 4Jwari Shapeshifter x 4Join the Ranks x 4Path to Exile x 4Tome Scour x 4Hada Freeblade x 4Seagate Loremaster x 1Archive Trap x 2Rite of Replication x 1Lands: 24 12 Plains7 Islands3 Sejire Refuge2 Halimar DepthsThe deck works with decent speed. I got first place in a Type II tournement once with it already. The goal is to have an ally drop every turn (plains, hada freeblade on turn 1). I've used it to out mill the standard Type II mill deck already, and I was hoping for some suggestions from veteran players to maybe make the deck better.
- Belltower okorder /
- Q:Where were the Dead Sea Scrolls took after they had been found?
- The story of how those scrolls traveled from the hands of young Bedouin goatherders to be under the scrutinous eyes of international scholars is stranger than fiction. Although all the details of the next few years will probably never be known for sure, this much is clear. After hanging from a pole in a Bedouin tent for a period of time, the seven original scrolls were sold to two separate Arab antiquities dealers in Bethlehem.
- Q:Do I need a license to operate an excavator in my own backyard in Ontario? Does the size of the excavator affect the necessity for a license? How about a Bobcat, do i need a license to operate that as well in my own backyard?.Ps, the excavator I am thinking of using has to be big enough to demolish a 1500 sq ft bungalow
- You need to ask your municipality this question.
- Q:Hi, i am creating a diy enclosure for my leopard gecko with a rock like substrate and walls using expanding foam. I would like to use a substrate to stick to the foam such as calci sand, childs play sand or zoo meds excavator clay.Impaction shouldnt be an issue as the substrate will be 'stuck' to the foam.Has anyone got any ideas as to which would look the best in a desert set up and whether it sounds as safe as i imagine?Many thanks
- maximum fabrics has a combustion warmth of over 2 hundred degrees, so until eventually your heater is more suitable than two times as warm because it meant to be (ensuing in an truly crispy gecko) you gained't have a difficulty with it. That stated, maximum fabrics will not be the right absorbency on your gecko, and it is going to initiate smelling very right now. i could recommend paper towels or reptile carpet. you may even flow with tile out of your community ironmongery shop when you're in search of for for some thing with a touch more suitable ornament. not in any respect use a loose substrate like bark or sand, because the gecko can devour it and grow to be very sick. wish this became effective!
- Q:I have a jd 490E excavator the boom function has very restricted hydraulic flow/power. I replaced the circuit release valve (two of them), which did not help at all.the problem was intermittent in the beginning, when boom control is used with stick control...quot;
- The swing arm drive has a separate pump system, ether the pump is bad or the control valves have an issue. Try the forum link below.
- Q:Is the excavator a motor vehicle?
- Excavators are special motor vehiclesIt is not allowed to carry passengersAnd you need a special driver's license to drive the excavator
- Q:This ***** has ruined the whole state it is dying everyone is out of work. I have to live in IL and visit my home in Michigan just to have a job. Somebody tell me who voted again for her. I'm an excavator operator and I would love to bury her LOL
- Moved up here from Florida to be with wifes family, 3 months ago. Moving back to Florida, June 1st................never realized this State had highest unemployment rate, even higher than Alaska now. Have heard she's really ineffective. Too bad.
- Q:Looking for a workshop manual for a hitichi digger Zaxis 50 anyone no where i could purchase one kind regards .
- Well i did a quick search with no luck. You will probably need to contact Hitachi to obtain one from them.
- Q:When was Troy founded, and by who?
- The first city of Troy was founded in 3,000 BCE. Ilus, the son of Tros is the founder of Troy according to legend. Ilus (Ilos in Greek) is in Greek mythology the founder of the city called Ilion (latinized as Ilium) to which he gave his name. When the latter became the chief city of the Trojan people it was also often called Troy, the name by which it is best known today. Ilus was son and heir to Tros of Dardania and brother of Assaracus and Ganymede. He won the wrestling prize at games held by the King of Phrygia and received fifty youths and maidens as his reward. The king also, on the advice of an oracle, gave him a cow and asked him to found a city where it should lie down. Ilus did so. Ilus then prayed to Zeus for a sign and at once saw the Palladium fallen from heaven and lying before his tent but was immediately blinded for the impiety of looking on the image. He regained his sight after making offerings to Athena. Ilus preferred his new city of Ilium to Dardania and on his father's death he remained there, bestowing the rule of Dardania on his brother Assaracus instead and so the Trojans were split into two kingdoms.
- Q:Does it take longer and more difficult to dig a foundation than to put up floors of a building. How about cost
- Interesting question. Digging the hole for the foundation is much faster than putting up the floors. Using a house as an example, the excavator usually can dig the hole in a few hours. Then, one day to pour the footings for the foundation, another day to form and pour the walls (if using that type of foundation). If using block wall foundation, figure a few days. Now comes the framing. Depending on the size of the house, it will take anywhere from 1-3 days to frame in the first floor deck. Figure another 2-7 days to frame the first floor walls, depending on the crew size and complexity of the plan. Repeat for any additional floors and then roof. There is no way to give you a cost. You have not given any information, such as size and type of building, location, construction materials, etc. Hope this helps.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Loader High Cost Performance
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords