• Loader High Cost Performance Gnhc100 System 1
  • Loader High Cost Performance Gnhc100 System 2
Loader High Cost Performance Gnhc100

Loader High Cost Performance Gnhc100

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Loader High Cost Performance Gnhc100 

Product Details

Basic Info.

Model NO.:SUNION GNHC100

 

Type:Skid Steer Loader

Walking Mode:Wheeled

 

Load and Unload Method:Front Discharge

Certification:CE, ISO9001: 2000

 

Condition:New

Operating Weight:3.56t

 

Export Markets:South America, Southeast Asia, Africa, Mid East, Eastern Asia

Additional Info.

Trademark:SUNION

 

Packing:in Bulk or in Container

Standard:SGS

 

Origin:China

HS Code:3111968887

 

Production Capacity:100 Sets/Year

Product Description

SUNION GNHC100 skid Steer Loader
Brand: SUNION
Model: GNHC100
Type: Wheel Loader
Condition: New
Standard: Excallent
Packing: In bulk or in container
Port: Shanghai
Delivery Time: Within 1 month

We have the most detailed info about the machines, if you need, please contact we freely, we'll try our best to satisfy you. 
We also supply much more others construction machines. 
Remember our idea: Services to create value, share a better future. 
Service for you!

ItemGNHC100
Specifications
Rated Load (kg)1200
Tipping load (kg)2400
Bucket capacity (m3)0.7
Operationg weight (kg)3560
Travel speed (km/h)12
Hydraulic pump flow (L/min)120-144
Fuel tank capacity (L)90
Tyre model12/16.5NHS
Overall Size (mm)3560×1900×2150
Dimensions
Height at maximum extension (mm)4070
The maximum pin shaft height (mm)3150
Width with bucket (mm)1900
Wheelbase (mm)1500
Axles base (mm)1185
ground clearance (mm)260
Flip angle40°
Dumping height (mm)2450
Approach angle26°
Departure angle20°
Engine
ModelCummins
Rated power100hp/2500rpm
Displacement (L)3.9

Loader High Cost Performance Gnhc100

Loader High Cost Performance Gnhc100


Q: Dave's Nighttime Bonus Code for feb 29 country on 92.5?
Listen to the station. They should tell you what it is.
Q: I' have read from the website below that it is possible to convert the diesel engine of cars, jeeps/jeepneys, and trucks to double tank system so that they may run on both diesel fuel and filtered used vegetable oil.
Of course they can, the only difference is the size of the engines, all functions are identical.
Q: We are building a two-story garage 30 x 40. I need an estimate on how much to dig for the footers/42quot; wall, plus backfilling after wall is poured. The area where the garage is going is already level.Thanks for the help!
You will have to get a local excavator or soil engineer to help with this. The soil conditions in your area will be a big factor in determining how much soil will need to be removed. The cohesiveness of the soil will determine the angle of repose. Good luck with the project.
Q: I was wondering if there is a huge difference in damage and speed. I need an idea on which direction I want to go. Dual or Rifle.
No, there is no huge difference. Use Dual. Greetings The Freak
Q: i mean young like they were 10 or 12 or 15 u know some where in there. please help1
St. Dominic Savio was martyrd at a young age. so was St. Maria Goretti.
Q: We aren't looking for any fancy fence or tile or lights or a diving board (in fact we don't want lights or a diving board, and we were going to use a manual cover). So we would like to know how much all this would cost initially and how much it would cost to install. I live in Naperville IL., and help would be appreciated, thanks.
bypass on your community actual sources brokers and they commonly have listings of condo homes. inspect their on-line web pages to verify in the journey that they have got an favourite condo charges on there on your area. look in community newspapers or nationwide newspaper for actual sources classified ads on your area.
Q: Im building a new house and i am currently arranging to have the excavator contractor there to install septic and excavate for the foundation. Then im having the foundation contractor come in to do his job. I live in Nova Scotia if that makes any difference. Should any of these guys be asking for money up front or part way through? Or do they finish then bill me with 30 days to pay? Whats the normal procedure?
I just built a house. I paid the architect after final billing and paid the contractor first a deposit, and from then on had a planned payment schedule of 3 sums with the successful completion of each stage as described in our contract. There was also a final payment for requested extras not included in our quote. Our builder is a very stand up guy.
Q: What's the average price, per square foot, to have a foundation dug out?
There is no such thing. Get a bid from an excavator. The price will reflect, among other things, how long it will take to do your job, which will depend on how deep, where you want the dirt put and what the ground is like.
Q: Was there an accident on the way? Was it a traffic accident?
If an accident is considered a "traffic accident", the location of the accident should be seen.If it's on the road, it's a traffic accident;If it is not on the road, it is not a traffic accident. At this point, if the victim alarm, traffic control department will be in accordance with the "road traffic safety" to deal with; if no one reported to the police, the accident will not be governed by traffic control department.The term "road" mentioned here means: highways, urban roads and places permitted for social motor vehicles, although they are within the jurisdiction of the unit, including squares, public parking lots and other places for public use.
Q: Introduction of excavator
First, the definition of excavators, excavators, also known as mining machinery (excavating machinery), is digging with bucket mining materials above or below the surface of the machine, and loaded into the transport vehicle or dump to the stacker of earthmoving machinery. The main materials are soil, coal, sediment and soil and rocks that have been pre - loosened. From the development of engineering machinery in recent years, the development of excavator is relatively fast, and excavator as one of the most important construction machinery models in engineering construction, the correct selection is also more important. Two, a brief history of excavator first hand excavator has been developed for more than 130 years of history, has experienced a gradual development process of automatic hydraulic excavator driven by steam rotary bucket excavator to the internal combustion engine and electric drive rotary excavator, application of mechatronics technology during the. The first hydraulic excavator was successfully invented in japan. Due to the application of hydraulic technology, 1940s has been installed in the tractor equipped with a backhoe hydraulic excavator suspension, in early 1950s, and have been developed in the mid towed rotary hydraulic excavators and crawler hydraulic excavator.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords