LDPE Geomembrane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.

  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction projects

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Basement cushion waterproof
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q:Is foam concrete suitable for use as a cushion?
Inappropriate. Bubble concrete is a new type of energy-saving and environmentally friendly building materials, which are widely used in wall materials, but there are still some defects, such as low strength, cracking, water absorption, as the cushion of its strength is not enough standard.
Q:Basement floor mattress dry to what degree can do coil waterproof?
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q:Why calculate the amount of time to count a lot of cushion ah
  In the municipal engineering, the bedding layer is a structural layer between the grassroots and the soil foundation. When the soil temperature is bad, the water temperature of the soil is improved and the water stability and frost resistance of the pavement structure are improved. Diffusible load to reduce soil deformation.
Q:Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
Q:Roof waterproof mattress should play the number of centimeters appropriate
4. The second layer to do mortar waterproof (mortar waterproof), waterproof at the same time can protect the bottom of the flexible waterproof.
Q:The top floor made waterproof playing cushion layer of how to do
4. The second layer to do mortar waterproof (mortar waterproof), waterproof at the same time can protect the bottom of the flexible waterproof.
Q:Large area ground concrete cushion seam Why is the separation of joints generally concrete
hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
Q:What is the difference between leveling and cushion?
and only in the construction of the building at the bottom of the building, it is possible to use the relevant level of the cube, After the use of the underlying layer of the building, it is not exempt from the possibility of using leveling layer
Q:Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range