HDPE Geomembrane with Textured Surface

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

HDPE Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer.

 Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.
  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Items

Index

LDPE

HDPE -1

HDPE -2

Tensile strength MPa

≥14

≥17

≥25

Elongation at break%

≥400

≥450

≥550

Right angle tearing strengthN/mm

≥50

≥80

≥110

Carbon soot quantity

≥2

Environmental stress resistant cracking performance



≥1500

Oxidation induction time at 200min



≥20

Permeability coefficient of vapor(g·cm/cm2·s·pa)

≤1.0x

Impact degradation performance at -70

Pass

dimension stability%

±3


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you need a cushion for roof waterproofing?
Where the process (such as waterproof material construction, floor construction, equipment installation, etc.) on the grass-roots level have certain requirements, must be grass-roots leveling treatment, in the project, commonly used leveling method is to use a certain strength of cement mortar or Fine stone concrete leveling.
Q:Do you need a cushion on the ground floor?
Chalet recommended to do sloping roof, the lowest point suggested 2.4. Talk about the ground, the roof, the wall area divided by the length of your board length and width of the area can be calculated on the amount of it!
Q:Large area ground concrete cushion seam Why is the separation of joints generally concrete
First, the rigid waterproof layer in a large area of ​​construction, by the external force, temperature, humidity changes, structural layer deformation and other factors prone to cracking, leading to leakage, the design should consider the deformation of the waterproof layer to take the necessary Structural or structural measures to avoid and mitigate the cracking of the waterproofing layer to achieve the desired waterproofing effect.
Q:What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
Q:Is the raft cushion waterproofing full of the cushion?
The request is full. Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do.
Q:Can the floor tiles be removed from the cement mats on the prefabricated board floor?
You can dig, but be careful not to use a strong earthquake with the machinery to remove, otherwise it will damage the original structure.
Q:Can the cushion on the prefabricated board floor be dug?
1, can not be dug, the prefabricated board seam is too big. 2, in addition, now rarely used prefabricated panels, the earthquake effect is not good; especially after the Wenchuan earthquake. If it is cast-in-place floor, you can dig out.
Q:Is foam concrete suitable for use as a cushion?
The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
Q:Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.
Q:The top floor made waterproof playing cushion layer of how to do
2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range