Geomembrane HDPE Sheet HDPE Geomembrane

Ref Price:
$1.00 - 2.00 / m²
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
5000 m²
Supply Capability:
2000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Geomembrane HDPE Sheet HDPE Geomembrane Introduction:

 

1.All physical factors such as anti-draw, anti-tear, and anti-stab meet the requirement of water works, chemicals, tunnels, and transportation project in most conditions.
2.Good aging, durable performance, and wide temperature arrange, it can be useful over thirty years.

3.Anti-stab and fine friction factors.
4.Canker proof, acid and alkali proof, untoxic.
5.Lower cost per unit area, cost is 1/3«1/2 lower than that of PVC film, glass and cloth.
6.Convevient to install and dependable effect.

 

 

Geomembrane HDPE Sheet HDPE Geomembrane Specification:

Thickness

0.12mm-4.0mm

Length

50m/roll,100m/roll,150m/roll or as your   choice

Width

5.0m-7.0m or as your choice

Color

White/Black/Blue/Green,mainly black

Material

HDPE

Delivery port

Qingdao

Package:

woven bag or as customers' requests

Product time

2-20 days

Features

1.Good physical and mechanic performance

2.High tearing resistance, strong   deformation adaptability

3.Puncture-resisting, aging resisting,   ultra-violet radiation, oil and salt, and corrosion resistance

4.Good adaptability to high and low   temperature, non-toxicity, long service life

5.Good waterproof, drainage, anti-seepage   and damp proof effects

6.Complete width and thickness   specifications, low cost and easy installation.

Note

We can do as your demand,please feel free to contact us for more information

 

 

Geomembrane HDPE Sheet HDPE Geomembrane Usage:

 

1.landfill,sewage or control the waste residue seashores seepage.

 

2.Lake dam,tailings dams,sewage dam and reservoir,channel,storage of liquid pools(pit,ore)

 

3.The subway ,tunnel,anti-seepage lining of basement and tunnel.

 

4.To control the roadbed and other foundation saline seepage.

 

5.Dike,the front of the sam foundation seepage prevention bedding,level of vertical impervious layer , construction cofferdam,waste field.

 

6.Seawater,freshwater fish farms.

 

7.Highway,the foundations of the highway and railway;the expansive soil and collapsible loess of the waterproof layer.

 

8.Anti-seepage of roofing

 

 

Geomembrane HDPE Sheet HDPE Geomembrane standard:

No.

Item

Test Value

0.75mm

1.0 mm

1.25 mm

1.5 mm

1.8mm

2.0mm

2.5 mm

3.0mm

1

Minimum Density(g/cm³)

0.94

2

Strength at yield,N/mm

11

15

18

23

27

30

38

45

3

Strength at break ,N/mm

21

28

33

43

51

57

71

85

4

Elongation at yield,%

13

5

Elongation at break,%

700min

6

Tear Resistance N

93

125

156

187

219

249

311

373

7

Puncture Resistance N

263

352

440

530

618

703

881

1059

8

Stress Crack Resistance, hrs

400

9

Carbon Black Content, %

2.0-3.0

Carbon Black Dispersion

1 or 2

10

Standard OTI Min

100

High Pressure OTI Min

400

11

Impact Cold Crack at -70°C

Pass

12

Water vapor permeability

(gNaN/cm2 .s.Pa)

≤1.0×10-13

13

Dimensional Stability (%)

±2

  

FAQ:


- Q1: Can you provide a sample for us?   

  A:Yes,We can send free samples,but customer need to pay the freight.

 HDPE Geomembrane Price


- Q2: What is your minimum order quantity?

   A:The minimum order quantity is 5000 ,but it is negotiable.

 HDPE Geomembrane Price


- Q3:What is your payment terms?

  A: T/T,Western Union,Paypal,L/C...

 HDPE Geomembrane Price


- Q4:What is your delivery time?

   A:Production time usually costs 2-20 days.  

Gemembrane Show:

 

geomembrane

 

geomembrane

geomembrane

geomembrane


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how is the effect decoration color film.
Makeup equivalent to emulsion paint coloring, the effect is not very good, formaldehyde heavy, the best choice wallpaper, green, beautiful, and quality. Now there is not yet green color film, it is not recommended.
Q:Is black HDPE geomembrane or dark green HDPE geomembrane better for landfill final cover?
as long as it is in line with the standard, any color is fine. according to the specific requirements, the color depends on the auxiliary materials.
Q:Installation method of korean thermoelectic film
Q:How does the brand ranking of the insulation ability of the glass film?
The amber Optical nano ceramic insulation film is the world's first and only a multilayer nano ceramic insulation film which is with high clarity, high thermal insulation, no dyes and metals, not oxidation, and no barrier GPS.
Q:Quality acceptance record sheets of waterproof concrete project insolation lot.
1.there is no quality acceptance record sheet template of waterproof concrete insolation lot. During inspection, only quality acceptance record sheets of concrete insolation lot are tested. 2. In the concrete strength assessment, the impermeability value of concrete with the same label being assessed are not taken into consideration. 3. the test and inspection of impermeable concrete. First, reserve test coupons of impervious concrete; second, special impermeability test must be carried out, inspection mode ends up with it.
Q:Where are geotextiles and geomembranes usually used?
Geotextiles are usually used for filtration, maintenance (including road maintenance and railway maintenance), reinforcement of roadbeds, seepage control of tunnels, construction of landfills. Geomembranes are usually used in for seepage control of gangues, landfills, cesspits, oil tanks, etc. The composite geo-membranes are made from geotextiles and geomembranes. They are usually used for seepage control of water conservancy facilities, such as artificial lakes, reservoirs, canals, etc.
Q:Is there any place seeling the geomembrane of 20 multiplying 20?
The 20 * 20 should refers to the length and width of the geomembrane.
Q:What are the models of membrane sand paper?
The thickness of the general model is not the same. Reference for you: Models with big thickness: 16 mesh, 24mesh, 36 mesh, 40 mesh, 50 mesh, and 60 mesh. Commonly used models: 80, 100, 120, 150, 180, 220, 280, 320, 400, 500, and 600 mesh. Models after fine grinding: 800, 1000, 1200, 1500, and 2500 mesh. Currently there is very few sandpaper with the model of 3000 mesh in domestic ! It is usually indicated by "granularity".
Q:How to glue the geomembrane with glue?
Corner connections of geomembrane generally has two ways; one is using [136] glue (film thickness is less than 0.8), another is using professional [ac0772] welding machine (film thickness is larger than 0.8). Of course, it depends. The construction site is also very important, if it is concrete [6164] road surface, then corners can be directly connected to the corners, lapping 20 cm or so, paving two layers of concrete directly on the surface. When it comes to pool, the best advice would be heatsealing welding, because it is more reliable. If it is a small area, then we can use geomembrane dedicated glue.
Q:What are the precautions for the construction of the slope area of the cesspit?
The construction method of geotextile/geomembrane: 1 flatness: ±2cm/m2, flat and straight; 2 compactness: 95%, after grinding, pave geomembrane on the surface; 3 vertical and horizontal gradient: Longitudinal and transverse slope should be above 2%, boundary and structure of the landfill bottom must be beneficial to diversion of leachate; 4 cleanness: No roots, rubble, gravel, concrete particles, such as sharp edges shall appear within vertical depth of 2.50cm . Climate requirements while paving: 1. Temperature: 5 - 40℃ is appropriate. Taking into account thermal expansion and cold contraction of the geomembrane, according to experience, when the weather is cold, geomembrane pavement should be tight; in hot weather should be loose; but it should be noted that, in summer, high temperature should be avoided at noon. 2 wind and rain: If the wind scale is over force 4 wind or it's raining, the construction should be stopped; When wind is lessened, it is proper to hold down geomembrane with sandbag so as to facilitate construction. Construction and installation of HDPE geomembrane: 1 construction and installation process of HDPE geomembrane. 2 tailor and transportation: According to the records of laying base measurement , cutting large bundle number of geomembrane should be marked and recorded and then carried to construction site according to their number.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range