galvanized scaffolding ledger blade best quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:

YN-Cuplock-B003





Material:

Q235 or Q255 or Q345

Surface finish:

Zinc plated, HDG, painting

Packing:

In pallet or in bulks

product:

scaffolding ledger





Packaging & Delivery

Packaging Detail:In pallet or in bulks
Delivery Detail:with 20 days after signing the order

Specifications

cup lock scaffolding 
1.material: q235 or q345 
2.surface finish: galvanized or painting 
3.OEM is offered 
4.High strength

Top cup

1. Material: Q235, Q255, Q345

2. Surface treament: painting or  hot-dip galvanized 

3. Elements: vertical, ledger, diagonal, top cuo, bottom cup and ledger blade

4. High strength bearing capacity

5. OEM service  as available

6. Inspection: by ourselves or by SGS,or B.V,or others. 

7. Samples are available.

(1)   Formwork System Scaffolding & Accessories:

 

 Wing nut and Tie rod; Steel panel and so on.

 

 (2)   Scaffolding System & Accessories:

 

 Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories.

 

 (3)   Adjustable Scaffolding Jack Base & Accessories:

 

 Including Hollow Screw Jack Base, Solid Screw Jack Base and Swivel Adjustable Screw Jack Base; Also the Accessories we can produce.

 

 (4)   Adjustable Steel Shoring Prop and Scaffolding Frame & Accessories :

 

 Adjustable Steel Shoring Prop Including light-duty and heavy-duty,the type of base plate: flat-plate, flower-plate, u-head and cross-head. Scaffolding Frame including walk-through type, h type and mason type. We also produce all the accessories about them.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:What is a bowl buckle scaffold?
The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
Q:]How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:examples of scaffolding?
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
Q:How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
Q:Introduction of external scaffolding
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Landlord can refer to
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range