Cost of Solar Panels NJ:Full Black 410W Solar Panels 400 Watt OEM Solar Panels Provider 390W-410W Solar Panel NCQ
- Loading Port:
- SHANGHAI
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5 pc
- Supply Capability:
- 10 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
ELECTRICAL DATA*STC
TYPE(Tolerance:0-+5W) | JT395 SEh | JT400 SEh | JT405 SEh | JT410 SEh | JT415 SEh |
Maximum Power Pmax (W) | 395 | 400 | 405 | 410 | 415 |
Maximum Power Voltage Vmp (V) | 30.7 | 30.9 | 31.1 | 31.3 | 31.5 |
Maximum Power Current Imp (A | 12.87 | 12.95 | 13.03 | 13.10 | 13.18 |
Open Circuit Voltage Voc (V) | 36.8 | 37.0 | 37.2 | 37.4 | 37.6 |
Short Circuit Current Isc (A) | 13.72 | 13.80 | 13.88 | 13.95 | 14.03 |
Module Effciency (%) | 20.2% | 20.4% | 20.7% | 21.0% | 21.2% |
STC: Irradiance 1000W/m², Cell Temperature 25°C, Air Mass AM1.5
Measuring tolerance: :±3%
ELECTRICAL DATA *NMOT
Maximum Power Pmax (W) | 298.65 | 302.47 | 306.31 | 310.17 | 314.06 |
Maximum Power Voltage Vmp (V) | 28.8 | 29.0 | 29.2 | 29.4 | 29.6 |
Maximum Power Current Imp (A | 10.37 | 10.43 | 10.49 | 10.55 | 10.61 |
Open Circuit Voltage Voc (V) | 34.5 | 34.7 | 34.9 | 35.1 | 35.3 |
Short Circuit Current Isc (A) | 11.06 | 11.12 | 11.18 | 11.24 | 11.30 |
NMOT: lrradiance at 800W/m², Ambient Temperature 20℃, Wind Speed 1m/s
MECHANICAL DATA
Solar Cell Type | Mono 91x182 mm(3.6x7.2 inches) |
Number of Cells | 108[2 x(9 x 6)] |
Module Dimensions | 1722*1134*30 mm(67.8*44.6*1.2 inches) |
Weight | 20.5 kg(45.2 lb) |
Front Cover | 3.2 mm (0.13 inches), high transmission, AR coated tempered glass |
Back Cover | White composite film |
Frame | Silver, anodized aluminium alloy |
J-Box | ≥IP68 |
Cable | 4.0 mm² solar cable, 300 mm(11.8 inches) |
Number of diodes | 3 |
QUALIFICATIONS & CERTIFICATES
v IEC 61215,IEC 61730, IEC 62941
v ISO 9001: Quality Management System
v ISO 14001: Environment Management System
v ISO 45001: Occupational Health and Safety
JETION SOLAR
As a member of CNBM - a Fortune 500 company, Jetion Solar provides various product solutions,global EPC service and financing. lts standard and high-efficiency product offerings are among the most powerful and cost-effective in the industry. Till now, Jetion Solar has cumulatively more than 10 GW module shipment and 1 GW global EPC track records.
FAQ
1.how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;
2.what can you buy from us?
Inverter, Solar Panels, Solar Panels Brackets, Lithium Battery
3.why should you buy from us not from other suppliers?
CNBM is a group company with skillful technical team. With First class pre - and after - sales service. We also are agent of HUAWEI inverter, Longi Solar Jinko solar and so on. The solar products will supply you with under market price.
4.what services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FCA;
Accepted Payment Currency:USD,EUR,HKD,CNY;
Accepted Payment Type: T/T,L/C,D/P D/A,Credit Card,PayPal,Western Union;
Language Spoken:English,Spanish,German,French,Arabic
- Q: Can solar panels be installed in areas with high humidity?
- Yes, solar panels can be installed in areas with high humidity. While humidity can affect the performance of solar panels to some extent, it does not prevent their installation or significantly diminish their overall effectiveness.
- Q: The first panel is located in New England, the second is placed in the Sahara desert, the third is on the Earth side of the moon, and the last is on the far side of the moon. Which panel would absorb the most sunlight over a year's time and why ? All the panels are place in optimal places where they would get the most light available.
- They all face the sun about 50% of the time on average over the year. Best: far side of the moon, 2nd near side of the moon; because in the first case the panel is a moon-orbit-diameter closer to the sun at time of exposure. I think the Sahara and New England come next for reasons already given, in addition to the significant amount of energy absorbed by the atmosphere even to reach the Sahara.
- Q: Can solar panels be installed on theme parks or amusement parks?
- Yes, solar panels can indeed be installed on theme parks or amusement parks. In fact, many parks around the world have already embraced solar energy as a sustainable and cost-effective solution for their energy needs. The large open spaces, rooftops, and car parking areas found in theme parks provide ample opportunities for solar panel installation. By harnessing the power of the sun, parks can reduce their carbon footprint, lower energy costs, and promote environmental consciousness.
- Q: How do solar panels interact with the electrical grid?
- Solar panels interact with the electrical grid through a process called net metering. When solar panels produce more electricity than is being used, the excess power is sent back to the grid, and the owner is credited for the energy produced. Conversely, when solar panels don't generate enough electricity, energy is pulled from the grid to meet the demand. This bidirectional flow enables solar panel owners to offset their energy usage and contribute to the overall energy supply.
- Q: Can solar panels be used in cold climates?
- Yes, solar panels can be used in cold climates. While the efficiency of solar panels may slightly decrease in colder temperatures, they can still generate electricity even in freezing conditions. In fact, solar panels can even benefit from the reflection of sunlight off snow, which can increase their output. Additionally, advancements in technology and the use of anti-reflective coatings have improved the performance of solar panels in cold climates.
- Q: Thinking about getting a solar panel installed but i'm worried about getting the govt. rebates. There is a Federal Tax credit and a State of Florida rebate and i'm wondering what the time frame is for getting the rebates. Has anyone gotten a solar panel installed recently that could give me more info.Thanks!
- Do not count on getting the rebate soon or if at all. You should get on the list and wait until the funds are released. Good luck. Summary: Note: There is currently a waiting list for rebates from the Solar Energy Incentives Program. This program has received $5 million in federal funding from the American Recovery and Reinvestment Act of 2009 (ARRA). This funding will be used to award rebates to some of the systems that are on the waiting list. The state has applied for an additional $9.4 million in federal funding for this rebate program. Systems applying for the rebate at the present time will be placed on the waiting list. If additional federal funded is received, the approved applications will be awarded rebates based on the order in which they were received. FY 2009-200 is the last year of the solar rebate program and the last year the program could be funded under current authorizing statute. Florida's Solar Energy System Incentives Program was established in June 2006 (SB 888) to provide financial incentives for the purchase and installation of solar energy systems from July , 2006, through June 20, 200. A total of $2.5 million was available for FY 2006-2007; $3.5 million was available for FY 2007-2008, and $5 million is available for FY 2008-09.
- Q: What, if any, improvement in efficiency per square foot or meter is realized by a solar panel in space vs. being mounted on the ground where the light is attenuated by the atmosphere?In passing, I found a site that gives an output of .89 watts / 4 in. sq for a particular home-mounted panel.
- The mirrors might could desire to be on computerized monitoring gadgets so as that using fact the sunlight strikes it might keep the pondered sunlight on the panel with value of optical sensors and stepper automobiles and %s or laptop controllers then you definitely've the mirrors which destroy in hailstorms except you employ chrome metallic ones that in the process basic terms mirror 60% in assessment to 80% for glass To tutor what I say take a small hand mirror outdoors and prop it up so it reflects at one brick or spot on wall mark it or keep in mind it then wait or come lower back in 20 min see what proportion times it may be moved and how complicated the development of circulate
- Q: im trying to experiment with solar panels. so i dont want to buy a huge expensive solar panel if i dont need one.
- They are powered from internal batteries, so what you really want to do is to charge the batteries. Take them one at a time, as they have different power and voltage requirements. Don't try to do them both together, unless you use an inverter. To directly charge a battery from a solar panel, you need to find out the voltage and current requirements for the charge operation. Then find a solar panel with a voltage somewhat higher. the current can be lower, it will just take longer for the charge. You will have to monitor manually the state of charge of the battery(s) to avoid overcharging and damage. Another alternative is to get a solar panel that will supply 2 volts and use that to operate an inverter that will output 20 VAC with AC sockets on it. then you can plug in the battery chargers that you have, and they will handle the batteries correctly. Or you can buy solar panels with built in circuitry to handle the charge control. .
- Q: Do LED lamps ever go bad?What's the life expectancy of solar panels?
- LEDs last approximately 50,000 hours of operation, continuous or non-continuous, it doesn't matter. 50,000 hours. Solar panels will, theoretically, last until the end of time. The support structures will fail long before the panels themselves. Inverters, battery banks, op-amps, transformers, control boards, etc. will all fail long before a solar panel stops making juice.
- Q: name things someone could use solar panels for or make with solar panels? (use solar energy i mean?)
- Solar panels can produce enough energy to run your average size unit (depends on panel size). It cost you bit more but its for once in all, average panel age limit is above 20 years (approx) so it can save you a lot, also environment friendly. Basic Panel can support your lights which are mostly used in any premise, even your TV, computer and stereo system. Is that enough to save and entertain you?.....Think so.
Send your message to us
Cost of Solar Panels NJ:Full Black 410W Solar Panels 400 Watt OEM Solar Panels Provider 390W-410W Solar Panel NCQ
- Loading Port:
- SHANGHAI
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5 pc
- Supply Capability:
- 10 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords