Door Frame Scaffolding System Hight Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 kg
- Supply Capability:
- 10000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Painted Frame Scaffolding System Hight Quality
1.Structure of H Frame ScaffoldingDescription
As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.
Packaging & Delivery
Packaging Detail: | Frame system scaffolding package in the container, or according to your requested |
Delivery Detail: | after deposit 10-15 days |
2. Main Features of Frame Scaffolding
1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.
2)A complete set of frame system scaffolding usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.
3) Frame system scaffolding is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.
3.Frame Scaffolding product pictures:
4.Frame Scaffolding Product Description
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1)Can we provide different size of Frame system Scaffolding as customer need
The answer is Yes, customer can provide the Tec spec to us and Drawing for production.
- Q: Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
- that would be great natural born killas playing the whole match
- Q: I'm trying to understand a problem in my physics book. The problem is this:A person is pulling on a rope, that is connected to a pulley on the ceiling. The rope then goes to a box with a pulley on it, and then up to the ceiling where the rope is connected (to the ceiling).The rope and pulleys are massless and frictionless.The book lists three forces (tension forces) going up and one weight force pulling down.My question is, why isn't there another force pulling against the tension of the rope from the guy pulling the rope?
- well, the person is going to have to pull on the rope, and that will be another force that is not pictured in the book. if you think about it, when a rope is under tension, each end is getting pulled, like a tug of war, otherwise it just moves toward the other force. When the forces are balanced, the rope is in tension and does not move. The forces pictured in the book are tension provided by the weight. The person will have to add a tension force downward to compensate.
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
- Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
- Q: I got my scaffold piercing 6 days ago, with titanium, and it was fine until yesterday.I had a couple of nights out and might have knocked it a few times, but yesterday it was swollen, red, throbbing and very painful. There is no liquid coming from it. It seems to have got worse today.I have been following the aftercare advice and cleaning it several times a day with rock salt solution and (up until yesterday) savlon antiseptic spray. Is it just irritated or is it infected? How long should I wait before I go to the doctor? If it is infected, will I have to take it out or just take antibiotics?Thanks!
- it sounds like it's just irritated, if it's infected it will be secreting puss. Have you tried to soak it in the rock salt solution? Soak two cotton balls and put one on each side on the piercing and keep it there for 10 minutes a day. And make sure the antiseptic spray has zero alcohol in it because that can irritate it and prolong healing. Try this for a few days and if it's not getting better then go see your doctor.
- Q: Who has external scaffolding construction program
- 1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: Can anybody provide me the formula for calculating scaffold volume on circular tank?
- Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
- Q: What is the service life of the mobile scaffolding accessories?
- Hot galvanized mobile scaffolding accessories for a period of 10 years or so, the surface does not require maintenance, in use without any restrictions. However, the cost is high, the raw materials needed to be more complex.
- Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Send your message to us
Door Frame Scaffolding System Hight Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 kg
- Supply Capability:
- 10000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords