CMAX Tower Crane TC 6520 Construction Machine

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200 Rated Loading Capacity: 10t
Span: 65m Rated Load Moment: 10t

Product Description:

CMAX Tower Crane TC 6520 Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.







FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can anyone tell me the location of the barn in the water color Waiting Refuge by Jon Crane or how to find it
several times and have not found the print. However, these people specialize in Jon Crane's work and may be able to help you nail down the location of the barn in the print that you are interested in. Good luck. I hope this helps. ***I'm wondering why this is in Books and Authors? Are you searching for a book that contains this information or perhaps a compilation of paintings by this artist? I haven't found anything like that yet.***
Q:What other actress of the 1960s who could have done the role of Marion Crane in Psycho,in place of Janet Leigh?
Believe it or not? Alfred Hitchcock had thought Vera Miles would have been good in that role. He had one of his mini-crushes on Vera, and had planned to make her a superstar. However, he lost patience when Vera decided to enjoy her married life and have babies. Vera had no burning desire to become a superstar, and was happy with the work she was doing. She was also very smart in another way. She said that those parts worked out well for the blonde, sexy women that played them, but that just wasn't her look or her approach to acting. Vera Miles was in the movie Psycho, but she played the part of Marion Crane's sister. I've always thought that Janet Leigh was perfect in that role. She was so beautiful and unbelievably sexy that when she was on the screen? You couldn't stop watching her. Her ample bosom was an attention-getter all by itself. No offense to Janet Leigh, but I don't know if anyone cared if she could act or not! However, she did a fine job in Psycho.
Q:Do you need any qualifications to legally operate a crane in a construction site?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q:How many of you will bow down to me, I am Denny Crane after all?
The only Denny I bow down to serves awesome coffee and a grand slam with all the syrup I can pour. What do you got?
Q:How do they erect HUGE cranes without a crane?
The really huge cranes with the boom that goes straight out at a right angle to the upright section (which goes straight up) is called a tower crane. They're assembled by using a jack assembly at the bottom, so that more sections are stuck in at the ground level.
Q:How to calculate life span of steel structure? for example, crane?
With bridges that you would be able to calculate an anticipated lifespan. It is going to now not be very particular. You measure the deflection as a given load goes over it. You also measure deflection with average site visitors.You are taking measurements of what normal visitors is. With this knowledge that you would be able to undertaking lifespan and prefer exchanging bridges earlier than they crumple. Once I was once a engineering student I had a summer time job serving to to experiment bridges.Most bridges and gigantic constructions are designed to are living 50 years I believe. For constructions I have no idea of any measurements you would take. I think it is most often a matter of periodic inspections. The things to seem for are basis problems, cracking of concrete, exposed re-bar, concrete flaking off etc.
Q:Can the tower crane personnel install the construction elevator?
First of all, it is certainly impossible to install the elevator, because the tower and elevator certificate is not the same
Q:Where in The Hunger Games does President Snow kill Seneca Crane?
It doesn't. It's briefly mentioned in Catching Fire. That's just something the movie added in, a nice touch. Also in the book it is believed that Seneca Crane was hanged.
Q:I am Dr Crane is there anything you would like to know? i can answer all your questions?
Someone asked what boogers where for, and now I find I cant stop thinking about hot dogs and boobs why?
Q:Has anyone stayed at The Crane?
Yes i stayed at the Crane,you must have a car....I had my black escalade at the time...so am not sure about shuttle service.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range