• Tower Crane of Chang Li Model Number QTZ40(TC4808) System 1
  • Tower Crane of Chang Li Model Number QTZ40(TC4808) System 2
  • Tower Crane of Chang Li Model Number QTZ40(TC4808) System 3
Tower Crane of Chang Li Model Number QTZ40(TC4808)

Tower Crane of Chang Li Model Number QTZ40(TC4808)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
60 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ40(TC4808)  Description

Feature: Tower Crane

Condition: New

Application: All kinds of costruction

Rated Loading Capacity: 4T

Rated Lifting Moment:500/630/800/1000/1200KN.m

Max. Lifting Load: 4T

Max. Lifting Height: 150m

Span: 42M

Place of Origin: Henan, China (Mainland)

Brand Name: Yu Jie

Model Number: QTZ40(TC4808) 

Certification: ISO,CE,BV,SGS

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Tip Load: 0.8

Trolley travel speed: 38/25m/min

Slewing speed: 0.6r/min

Jacking up: 0.4m/min

Powed: 380V/50HZ

Lifting character: 2/4 Fall

QTZ40(TC4808)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ40(TC4808)  Specification

 Tower Crane of Chang Li Model Number QTZ40(TC4808)

QTZ40(TC4808)   Pictures

Tower Crane of Chang Li Model Number QTZ40(TC4808)

Tower Crane of Chang Li Model Number QTZ40(TC4808)

Tower Crane of Chang Li Model Number QTZ40(TC4808)

QTZ40(TC4808)  FAQ

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



 

 


Q:Tower crane railing height is greater than or equal to meters
1500cm underground enclosure shall not be less than 100com. Thank you
Q:do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
Yep, they use a smaller crane that sits on the back of a truck and has a telescopic arm, it only takes a few days. There's a lot of construction going on in my city and I've seen them do it.
Q:What are the four major moving mechanisms of a tower crane?
Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
Q:please help i need it for a project
He never lived, he was a character of the story Legend of Sleepy Hollow.
Q:how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q:How To Make Origami Crane?
You okorder and see how to make origami crane step by step
Q:I need to go to a tower crane school inside Las Vegas, where do i go? At least inside Nevada. Not Arizona or Utah or California.
Statistically, they rank below familiar. The Clark County college District (Las Vegas) is recruiting instructors from out of city, or perhaps in another us of a (ordinarily the Philippines) through fact there's a scarcity. not many human beings flow to Las Vegas to flow into the coaching occupation. it rather is in all threat a marvel to no person. in spite of the fact that, like maximum college districts for the time of that us of a, the solid colleges are frequently in wealthier neighborhoods, and the undesirable colleges are frequently interior the final rich neighborhoods. this is extraordinarily lots comparable to that's in the different city. some colleges are greater valuable than others. In l. a. there's a great distinction between Canoga Park extreme college and Crenshaw extreme college, even although they're interior an identical college district. lots an identical might nicely be reported for the Las Vegas college District. There are solid colleges, familiar colleges, and below familiar colleges. As i discussed, as an entire, the District stories regularly occurring instructor shortages. There are only not that many qualified instructors that flow to the city for that particular occupation. The CCSD is ranked low in custom benchmarks including attempt rankings, instructor to pupil ratio's, etc. Vegas isn't understand for it rather is high quality of education, like say ... Boston. in spite of the fact that, in case you progression to a ideal section including Summerlin or Henderson, your babies will greater or much less attend and familiar suburban extreme college with a common adventure in different cities. in case you progression to North Las Vegas, or the Nellis section, there will be greater gang problems and a loss of inspired instructors through fact of a complicated coaching environment. many mum and dad % their properties here in accordance with which college their babies will attend.
Q:As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
Sometimes the structure of the crane is built onto using the crane itself, building itself into a box. Then the crane lifts itself to the higher level. This can be done many times.
Q:Where are gears used on a crane?
Don't okorder
Q:A. Power LinesB. WaterC. FiresD. Overturns
Dangerous to whom and exactly what does overturns mean? Operators are most likely to be killed when a tower crane breaks (is this an overturn?) because the operator is several hundred feet up in the air in the cab. Hitting power lines can be risky to the operator if dumb but staying in the cab is likely to be safe (stepping out may kill in touching ground) Overturning a ground based crane is going to hurt someone in the area much of the time.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords