• Steel Coupler Rebar Steel Tube Made Shanghai China in Good Price System 1
  • Steel Coupler Rebar Steel Tube Made Shanghai China in Good Price System 2
Steel Coupler Rebar Steel Tube Made Shanghai China in Good Price

Steel Coupler Rebar Steel Tube Made Shanghai China in Good Price

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

1.Description of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality :

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel Tube Made Shanghai China in Good Price

Steel Coupler Rebar Steel Tube Made Shanghai China in Good Price

2.Advantages of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality : 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Q:A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
Well of course it depends on the person. Some people say the piercing isn't bad at all, while some say it is really painful. Some people say the healing process is absolute hell, but for some people it's a breeze. I got an industrial 3 months ago, and i would rate the actual piercing process as a 8/10 (10 being the most painful). It was pretty painful in my opinion, but the good thing is that the pain doesn't last long at all. Most people i know who have industrials say that the healing process is more painful than getting the piercing, but for me it was the complete opposite. Immediately after the piercing it throbbed and was a tiny bit sore for about an hour, then for the next 2 days it was completely painless. But after that, it was pretty sore for about 2-3 weeks, but it wasn't that bad. Now after having it 3 months, it still feels a bit uncomfortable when i sleep on it, sometimes it's a tad bit sore, but no big deal at all :)
Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
An overhanging canopy should be the pillars of the non overhanging balcony canopy may be concave balcony, may also be the pillars of support (pretty much before the home house) pick style balcony canopy should be the cantilevered balcony canopy is not that direct pick out in the post
Q:How to calculate the rental price of portal scaffolding
Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
Q:What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q:What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q:What does Scaffolding mean in the educational talk?
It refers to the ways that you break a concept and/or a task down using graphic organizers, etc.
Q:My mom wouldn't let me get snakebites or cyberbites but she will let me get my scaffold pierced. I know people have different things for pain etc etc I know it will hurt but I want it pierced. So, to someone who has gotten it pierced or knows about it is there anything special you have to do to take care of it or is it just like the ear lobe piercing.
a million. there is a few discomfort in touch. in simple terms relies upon on the way you cope with it. 2. there is new information that even after years of having the piercing it could nonetheless substitute into contaminated =/ 3. It has a bent emigrate because of the fact of ear strengthen (your ears in no way particularly provide up growing to be). 4. Dont over sparkling it. 5. Its executed with a medium gauge needle. 6. i comprehend in the States that many piercing places won't touch everybody under sixteen inspite of parental consent. there is likewise a many greater that isn't touch a minor (everybody under 18). So i could call around and notice.
Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords