Aluminum frame for solar module

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

We are the largest aluminum profilemanufacture in China which specializing in industry aluminum profile. If you need some products,please feel free to send us the drawings or samples, we will supply you the good qualitywith best price, and we will serve you all the time.

The detail descriptions of aluminum profile as bellowing:


Alloy  Aluminum 6063,6061,6005,6082 or customer nominated


T3, T4, T5, T6 and other


Anodize,  electrophoresis, powder coating, PVDF coating, wood grain painting,



Any  colour based on Standard Germany RAL Mark


Not  more than 16 meters

Good Package

Inner plastic film /outside carton/wooden  pallets

Payment Method

T/T, L/C, etc

Delivery Time

Normally 2-4 weeks, Delivery time can be consulted.

Press  Machine

500-12500  tons all together 93 press lines.


1.  Solar modue frame; 2. Drilling; 3. Bending; 4. Cutting; 5. etc.




1.  Using our dies, no fee;

2.  Using customer drawing, opening dies, usually about 5~50 tons then the dies  cost can be refunded.

3.  Die cost is negotiable base on the order quantity


Annual  output 800,000 tons

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:How to build an effective teaching stent
analysis of teaching problems and needs, design solutions to teaching problems and strategies to implement the design, evaluation, and constantly improve the design of a systematic process.
Q:How to remove the climbing bag bracket
Mountaineering bag, as the name suggests is the climbers used to load the equipment backpack. Mountaineering backpack is equipped with a variety of travel items important equipment, travel is essential.
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:What is the support frame at the bottom of the car?
It is a spring spring pin to the front end of the leaf spring and the front of the steel plate spring front bracket connected together, the front end of the ear hole to reduce the wear and tear with a bushing.
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:What is the full support system
Full-frame construction is a long-term method, construction requires a lot of template stent. The construction of the bracket is to erect the bracket at the bridge, pour the concrete on the bracket, and remove the template and the bracket after the concrete reaches the strength.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range