solar mounting system with concrete embedded bolt

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

solar mounting system with concrete embedded bolt is structure customization,drill and welding free and faet installation.appearance and generous,without secondary anticorrosive processing.ahead rear of base board can be adjusted,easy to be rectified in construction.


  Installation site  Outdoor ground
  Installation angle  customization
  Wind resistance 35m/s
  Solar Panel Type  frame or frameless
  Solar panel size  any size
  Mount track  aluminum extrusion attachment
  Mount materials  Q235B
  Installation height  customization
  Snow load  1.4KN/m2
  Components arrangement  laterally or longitudinally
  International Standards  comply with AS/NZS 1170 and other international standards
  Quality Warranty  20 years


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
4 water branch on each pipe section, adjacent to the nozzle between the pipe set of hanger should not be less than one, the hanger spacing should not be greater than 3.6m.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Construction and construction related to the installation of the pipeline has been basically completed, and the acceptance of qualified, and to provide the necessary information to the installation unit to meet the installation requirements. The associated device is installed in place.
Q:Is the template and stent two or one?
The template is a model for the new concrete molding. The template system consists of formwork, support and fasteners, which require that the shape and dimensions of the structure and components be accurate. Have sufficient strength, stiffness and stability.
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:What is the full support system
The biggest advantage of the construction of the stent method is the need for large-scale lifting equipment, the drawback is the construction of the stent template consumption, long duration, the mountain bridge and high pier has great limitations.
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:What is the metal material for the RESOLUTE bracket?
drugs need to be lipophilic in order to pass through the fat Cell membrane, to inhibit the role of smooth muscle hyperplasia.
Q:Specification for installation of fire pipe support
The height and spacing of the fire pipe support shall be in accordance with the requirements of the design and construction specifications.
Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:What is a finished stent?
A little bit of conflict is normal, it is estimated that after 3 months will come, but do not know what happens after 3 months I am also Zeyi the whole ah? I am also ah I was the same problem. The The I am also so I am also

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range