Ground screw solar mounting system

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

ground screw for solar
1.Good corrosion and oxidation resistance.
1.Hot-dipped galvanized steel
2.advanced spiral

The ground screws are installed,using a number of different screwing aids and machines.This screw system is not only suitable for natural ground,but also for dense,and even tarred surfaces. Applications are countless,from securing garden umbrellas,windy dryers and fences;to carports,flag poles and traffic signs.Solar panel systems,advertising boards and even outdoor buildings for events and expositions are quickly and easily erected and removed.

Specification:

Name

Galvanized screw piles

Dia

52mm-300mm

Thickness

1.75mm-8mm

Length

550mm-3500mm

Material

Steel,ISO 630 Fe360A

Surface treatment

hot dipped galvanized

Packing

Pallet

Delivery Terms

30-40days

Adjustment 60mm
Durchmesser Lochbohrung 3×M16

Easy to install:

The tilted module can be put into the extruded rail in any location and can be highly pre-assembly with the clamp to minimize the time and cost of installation.

High durability:

With all structural components comprised of high class stainless steel and anodized aluminum alloy, it is designed for 15 years service life.

Stand up to extreme weather:

This system is designed to stand up to the extreme weather complied with the AS/NZ1170 and other international structure load standard by the skilled engineer. The main support components have been tested to guarantee its structure and load-carrying capacity.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the metal material for the RESOLUTE bracket?
drugs need to be lipophilic in order to pass through the fat Cell membrane, to inhibit the role of smooth muscle hyperplasia.
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Installation preparation → prefabricated → trunk installation → riser installation → pipe installation → pipe pressure test → pipe flush → pipe corrosion and insulation.
Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:How does the hydraulic support work
Hydraulic support is used to control the coal mining face pressure structure of the mine. The surface pressure is applied to the hydraulic support. In the mechanical system where the hydraulic support and the face rock are interacted, if the supporting force of the hydraulic support is exactly the same as the external force acting on the hydraulic support,
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:What are the characteristics of the hydraulic support hydraulic system?
Of the reverse, that must ensure that the hydraulic system of self-protection, that is, in the hydraulic system to take certain security measures, such as hydraulic cylinders can take the way of hydraulic lock or some occasions can be used to reduce the incidence of accident valve ;
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range