ground screw solar mounting system

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

solar mounting system/ground screw solar mounting system

1 quick installation, suitable for any soil, even on the hillside

2 save time, save the cost, reduce the construction period

3 do not need to do large-scale site formation, without excavating the ground, notdestruction of vegetation, no pollution to groundwater and addressenvironmental.

4 products can be recycled or transferred to other areas, power plant after usecan restore the original landscape, convenient land, reclamation and re development.


the installation siteaccording to customer requirements
the installation angleaccording to customer requirements
wind load40m/s
solar panel typewith or not with frame

size of panels

any
the support railaluminum alloy rolling block
scaffold materialQ235B steel
mounting heightaccording to customer requirements
snow load1.4KN/m2
components arrangedhorizontally or vertically
the international standardAS/NZS 1170 and other international standards
service life > 25 years

Packaging:

1.wooden box & wooden pallet & plastic package & steel packaging belt

2.as customer reqiured


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
4 water branch on each pipe section, adjacent to the nozzle between the pipe set of hanger should not be less than one, the hanger spacing should not be greater than 3.6m.
Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Antistatic floor of the stent system is worth mentioning is "easy to pave the way." "Easy to pave the" anti-static floor bracket system is a patented technology, but also the only use of aluminum alloy stent system to do the system, good stability, high load, integrity, pavement after the anti-static floor is very smooth ,
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:What is the metal material for the RESOLUTE bracket?
Drug-eluting stent implanted in the human blood vessels, the stent to block the blood vessels to support the same time, the drug will be released within a certain period of time from the stent, eluting into the arterial tissue to play the role of inhibition of smooth muscle hyperplasia, so as to effectively prevent the stent site again Clogging (clinically referred to as "restenosis").
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:What are the characteristics of the hydraulic support hydraulic system?
The system of the solenoid valve, but also consider the system of the media, because it is not flammable; second, in these places must ensure that the equipment in the absence of power in the case will not happen, such as hydraulic cylinder return, hydraulic motor
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:Specification for installation of fire pipe support
The height and spacing of the fire pipe support shall be in accordance with the requirements of the design and construction specifications.
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range