solar ground mounting systems

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
Supply Capability:
30MW /month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

40 years of experience in steel andaluminium and in light metal construction

design and light metal structures.

Over 15 years of expertise in Solar Mounting Systems!

Schletter is the biggest supplier of solar mounting systems in Europe

with more than 1200 employees worldwide.

Experience from over 6 GW of mounted systems

Your professionals for planning, advice and production!

  • System mit Rammfundamentierung

  • Optimierte projektbezogene Planung

  • Ausgezeichnete Materialeffizienz, bis ins Detail optimierte Systemanschlüsse

  • Schnelle Montage durch weitgehende Vorkonfektionierung

  • Maximaler Vorfertigungsgrad

  • Extrem kurze Montagezeit

  • Keine Bodenversiegelung

  • Lange Lebensdauer durch ideale Werkstoffkombinationen

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Controller design charge and discharge circuit designed over-current protection (plus insurance); inverter output lightning protection, overcurrent protection; bracket can withstand more than 12 typhoons; battery low temperature and high temperature protection.
Q:What is the solar stent system?
should be south (tracking system exception) Installation angle: equal to or close to the installation of the local latitude Load requirements: wind load, snow load, earthquake requirements Arrangement and spacing: Combined with the local sunshine conditions Quality requirements: 10 years without corrosion, 20 years of steel does not reduce, 25 years still have a certain
Q:How to build an effective teaching stent
Some think that instructional design is a process of system planning teaching system; [1] some think that teaching design is a technology used to develop learning experience and learning environment; [2] Some think that teaching design is to promote effective learning For the purpose of the use of modern learning theory and teaching theory, education and communication principles and techniques,
Q:What is a finished stent?
and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway support system and other systems, and so forth.
Q:What are the characteristics of the hydraulic support hydraulic system?
Of the reverse, that must ensure that the hydraulic system of self-protection, that is, in the hydraulic system to take certain security measures, such as hydraulic cylinders can take the way of hydraulic lock or some occasions can be used to reduce the incidence of accident valve ;
Q:Easy to pave the anti-static floor bracket system?
So that the floor flatness, aesthetics, the gap has been a large degree of straightening, while the efficiency of the rapid increase of more than 50%.
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:What are the benefits of finished stents?
Through the assembly of different parts can be flexible with a variety of production needs of the design to meet a variety of construction environment.
Q:Specification for installation of fire pipe support
The spacing of the bracket: the maximum spacing of the bracket is standard, you can Baidu, but the actual installation of the bracket spacing is smaller than the specification, the flange connection, the screw connection when the stent spacing than when the groove connection.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range